← Find this measure
2009 REGULAR SESSION · SB 104
Introduced — SB 104 (2009R1)
This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.
Other indexed documents for this measure (5)
- Staff Measure Summary — SB 104 (2009R1)
- Staff Measure Summary — SB 104 (2009R1)
- Enrolled — SB 104 (2009R1)
- Introduced — SB 104 (2009R1) · open
- OLIS measure summary
Recorded legislative activity (31)
- Introduction and First Reading Of Senate Measures
- Introduction and first reading. Referred to President's desk.
- Referred to Environment and Natural Resources.
- Heard
- Public Hearing held.
- Heard and Reported Out
- Work Session held.
- Second Reading Of Senate Measures
- Recommendation: Do pass.
- Second reading.
- Third Reading Of Senate Measures
- Third reading. Carried by Dingfelder. Passed.
- First Reading Of Senate Bills
- First reading. Referred to Speaker's desk.
- Referred to Environment and Water with subsequent referral to Ways and Means.
- Heard
- Public Hearing and Work Session held.
- Not Heard
- Heard and Reported Out
- Work Session held.
- Recommendation: Do pass, rescind subsequent referral to Ways and Means, and be placed on Consent Calendar.
- Subsequent referral to Ways and Means rescinded by order of Speaker.
- Second Reading Of Senate Bills
- Second reading.
- Consent Calendar
- Read third time under Consent Calendar. Passed.
- President signed.
- Speaker signed.
- Governor signed.
- Chapter 266, 2009 Laws.
- Effective date, June 16, 2009.
Citation and provenance
Oregon Legislature. Introduced — SB 104 (2009R1). 2009 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2009R1/Downloads/MeasureDocument/SB104/Introduced Retrieved 2026-09-02.
Document ID: doc_09900608601bde442414
Original SHA-256: 7648bee3323857d0c9f0cd32079638eb65bf013f038674a8782417bcf646aa13
Extracted text SHA-256: 4aefa241450f639d17ab3938163e0df21ebf8dcd9affdfa70eefc033f3dce773
75th OREGON LEGISLATIVE ASSEMBLY--2009 Regular Session
Senate Bill 104
Printed pursuant to Senate Interim Rule 213.28 by order of the President of the Senate in conformance with pre-
session filing rules, indicating neither advocacy nor opposition on the part of the President (at the request
of Governor Theodore R. Kulongoski for Department of Environmental Quality)
SUMMARY
The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
to consideration by the Legislative Assembly. It is an editor′s brief statement of the essential features of the
measure as introduced.
Removes requirement that Environmental Quality Commission establish fee schedule every two
years for sources subject to federal operating permit program.
Declares emergency, effective on passage.
1 A BILL FOR AN ACT
2 Relating to fee schedule for federal operating permit program; amending ORS 468A.315; and declar-
3 ing an emergency.
4 Be It Enacted by the People of the State of Oregon:
5 SECTION 1. ORS 468A.315 is amended to read:
6 468A.315. (1) The fee schedule required under ORS 468.065 (2) for a source subject to the federal
7 operating permit program shall be based on a schedule established [every two years] by rule by the
8 Environmental Quality Commission in accordance with this section. Except for the additional fee
9 under subsection (2)(e) of this section, this fee schedule shall be in lieu of any other fee for a permit
10 issued under ORS 468A.040, 468A.045 or 468A.155. The fee schedule shall cover all reasonable direct
11 and indirect costs of implementing the federal operating permit program and shall consist of:
12 (a) An emission fee per ton of each regulated pollutant emitted during the prior calendar year
13 as determined under subsection (2) of this section, subject to annual fee increases as set forth in
14 paragraph (d) of this subsection. The following emission fees apply:
15 (A) $27 per ton emitted during the 2006 calendar year.
16 (B) $29 per ton emitted during the 2007 calendar year.
17 (C) $31 per ton emitted during the 2008 calendar year and each calendar year thereafter.
18 (b) Fees for the following specific elements of the federal operating permit program:
19 (A) Reviewing and acting upon applications for modifications to federal operating permits.
20 (B) Any activity related to permits required under ORS 468A.040 other than the federal operat-
21 ing permit program.
22 (C) Department of Environmental Quality activities for sources not subject to the federal oper-
23 ating permit program.
24 (D) Department review of ambient monitoring networks installed by a source.
25 (E) Other distinct department activities created by a source or a group of sources if the com-
26 mission finds that the activities are unique and specific and that additional rulemaking is necessary
27 and will impose costs upon the department that are not otherwise covered by federal operating
28 permit program fees.
29 (c) A base fee for a source subject to the federal operating permit program. This base fee shall
30 be no more than the fees set forth in subparagraphs (A) to (D) of this paragraph, subject to increases
NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
New sections are in boldfaced type.
LC 409
SB 104
1 as set forth in paragraph (d) of this subsection:
2 (A) $2,700 for the period of November 15, 2007, through November 14, 2008.
3 (B) $2,900 for the period of November 15, 2008, through November 14, 2009.
4 (C) $3,100 for the period of November 15, 2009, through November 14, 2010.
5 (D) $4,100 for the period of November 15, 2010, through November 14, 2011, and for each annual
6 period thereafter.
7 (d) An annual increase in the fees set forth in paragraphs (a) to (c) of this subsection by the
8 percentage, if any, by which the Consumer Price Index exceeds the Consumer Price Index [for the
9 calendar year] as of the close of the 12-month period ending on August 31, 1989, if the com-
10 mission determines by rule that the increased fees are necessary to cover all reasonable direct and
11 indirect costs of implementing the federal operating permit program.
12 (2)(a) The fee on emissions of regulated pollutants required under this section shall be based on
13 the amount of each regulated pollutant emitted during the prior calendar year as documented by
14 information provided by the source in accordance with criteria adopted by the commission or, if the
15 source elects to pay the fee based on permitted emissions, the fee shall be based on the emission
16 limit for the plant site of the major source.
17 (b) The fee required by subsection (1)(a) of this section does not apply to any emissions in excess
18 of 4,000 tons per year of any regulated pollutant through calendar year 2010 and in excess of 7,000
19 tons per year of all regulated pollutants for each calendar year thereafter. The department may not
20 revise a major source′s plant site emission limit due solely to payment of the fee on the basis of
21 documented emissions.
22 (c) The commission shall establish by rule criteria for the acceptability and verifiability of in-
23 formation related to emissions as documented, including but not limited to the use of:
24 (A) Emission monitoring;
25 (B) Material balances;
26 (C) Emission factors;
27 (D) Fuel use;
28 (E) Production data; or
29 (F) Other calculations.
30 (d) The department shall accept reasonably accurate information that complies with the criteria
31 established by the commission as documentation of emissions.
32 (e) The rules adopted under this section shall require an additional fee for failure to pay, sub-
33 stantial underpayment of or late payment of emission fees.
34 (3) The commission shall establish by rule the size fraction of total particulates subject to
35 emission fees as particulates under this section.
36 (4) As used in this section:
37 (a) “Regulated pollutant” means particulates, volatile organic compounds, oxides of nitrogen,
38 and sulfur dioxide; and
39 (b) “Consumer Price Index” has the meaning given in 42 U.S.C. 7661a(b), as in effect on June
40 20, 2007.
41 SECTION 2. This 2009 Act being necessary for the immediate preservation of the public
42 peace, health and safety, an emergency is declared to exist, and this 2009 Act takes effect
43 on its passage.
44
[2]