← Find this measure
2009 REGULAR SESSION · HB 2229
House Amendments — HB 2229 (2009R1)
This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.
Other indexed documents for this measure (8)
Recorded legislative activity (53)
- First Reading Of House Bills
- First reading. Referred to Speaker's desk.
- Referred to Land Use with subsequent referral to Ways and Means.
- Heard
- Public Hearing held.
- Heard
- Public Hearing held.
- Heard
- Public Hearing held.
- Heard
- Work Session held.
- Heard
- Work Session held.
- Heard
- Work Session held.
- Heard
- Work Session held.
- Heard
- Work Session held.
- Heard
- Work Session held.
- Heard
- Work Session held.
- Heard and Reported Out with Amendments
- Work Session held.
- Recommendation: Do pass with amendments, be printed A-Engrossed, and subsequent referral to Ways and Means be rescinded.
- Subsequent referral to Ways and Means rescinded by order of Speaker.
- Second Reading Of House Bills
- Second reading.
- Third Reading Of House Bills
- Third reading. Carried by Garrett, Esquivel. Passed.
- First Reading Of House Measures
- First reading. Referred to President's desk.
- Referred to Environment and Natural Resources.
- Heard
- Public Hearing held.
- Not Heard
- Heard and Reported Out with Amendments
- Work Session held.
- Recommendation: Do pass with amendments to the A-Eng. bill. (Printed B-Eng.)
- Second Reading Of House Measures
- Second reading.
- Carried over to 06-11 by unanimous consent.
- Carried over to 06-12 by unanimous consent.
- Carried over to 06-15 by unanimous consent.
- Third reading. Carried by Dingfelder. Passed.
- Third Reading Of House Measures
- Possible Consideration Of Senate Amendments
- House concurred in Senate amendments and repassed bill.
- Speaker signed.
- President signed.
- Governor signed.
- Chapter 873, (2009 Laws): Effective date August 4, 2009.
Citation and provenance
Oregon Legislature. House Amendments — HB 2229 (2009R1). 2009 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2009R1/Downloads/MeasureDocument/HB2229/House Amendments Retrieved 2026-09-02.
Document ID: doc_09c8672d89ca5a791e5d
Original SHA-256: e413276c030bcbd59f1738089325c5d03b66bad992c46cd496e5738c9cb226e6
Extracted text SHA-256: 3e64cf1b8d03baf9cf6d96f51a56ea907c80824698310ee24d5f9ca197251309
75th OREGON LEGISLATIVE ASSEMBLY--2009 Regular Session
HOUSE AMENDMENTS TO
HOUSE BILL 2229
By COMMITTEE ON LAND USE
May 5
1 On page 1 of the printed bill, line 3, after “197.040,” delete the rest of the line and line 4 and
2 insert “197.652, 197.654, 197.656, 197.747, 215.427 and 227.178; and declaring an emergency.”.
3 Delete lines 6 through 24 and delete pages 2 through 11 and insert:
4 “ SECTION 1. ORS 197.010 is amended to read:
5 “197.010. The Legislative Assembly declares that:
6 “(1) In order to [assure] ensure the highest possible level of livability in Oregon, it is necessary
7 to provide for properly prepared and coordinated comprehensive plans for cities and counties, re-
8 gional areas and the state as a whole. These comprehensive plans:
9 “(a) Must be adopted by the appropriate governing body at the local and state levels;
10 “(b) Are expressions of public policy in the form of policy statements, generalized maps and
11 standards and guidelines;
12 “(c) Shall be the basis for more specific rules and land use regulations which implement the
13 policies expressed through the comprehensive plans;
14 “(d) Shall be prepared to assure that all public actions are consistent and coordinated with the
15 policies expressed through the comprehensive plans; and
16 “(e) Shall be regularly reviewed and, if necessary, amended to keep them consistent with the
17 changing needs and desires of the public they are designed to serve.
18 “ (2)(a) The overarching principles guiding the land use program in the State of Oregon
19 are to:
20 “(A) Provide a healthy environment;
21 “(B) Sustain a prosperous economy;
22 “(C) Ensure a desirable quality of life; and
23 “(D) Equitably allocate the benefits and burdens of land use planning.
24 “(b) Additionally, the land use program should, but is not required to, help communities
25 achieve sustainable development patterns and manage the effects of climate change.
26 “(c) The overarching principles in paragraph (a) of this subsection and the purposes in
27 paragraph (b) of this subsection provide guidance to:
28 “(A) The Legislative Assembly when enacting a law regulating land use.
29 “(B) A public body, as defined in ORS 174.109, when the public body:
30 “(i) Adopts or interprets goals, comprehensive plans and land use regulations imple-
31 menting the plans, or administrative rules implementing a provision of ORS chapter 195, 196,
32 197, 215 or 227; or
33 “(ii) Interprets a law governing land use.
34 “(d) Use of the overarching principles in paragraph (a) of this subsection and the pur-
35 poses in paragraph (b) of this subsection is not a legal requirement for the Legislative As-
LC 709/HB 2229-12
1 sembly or other public body and is not judicially enforceable.
2 “[(2)] (3) The equitable balance between state and local government interests can best be
3 achieved by resolution of conflicts using alternative dispute resolution techniques such as mediation,
4 collaborative planning and arbitration. Such dispute resolution techniques are particularly suitable
5 for conflicts arising over periodic review, comprehensive plan and land use regulations, amendments,
6 enforcement issues and local interpretation of state land use policy.
7 “ SECTION 2. ORS 197.040 is amended to read:
8 “197.040. (1) The Land Conservation and Development Commission shall:
9 “(a) Direct the performance by the Director of the Department of Land Conservation and De-
10 velopment and the director′s staff of their functions under ORS chapters 195, 196 and 197.
11 “(b) In accordance with the provisions of ORS chapter 183, adopt rules that it considers neces-
12 sary to carry out ORS chapters 195, 196 and 197. Except as provided in subsection (3) of this section,
13 in designing its administrative requirements, the commission shall:
14 “(A) Allow for the diverse administrative and planning capabilities of local governments;
15 “ (B) Consider the variation in conditions and needs in different regions of the state and
16 encourage regional approaches to resolving land use problems;
17 “[(B)] (C) Assess what economic and property interests will be, or are likely to be, affected by
18 the proposed rule;
19 “[(C)] (D) Assess the likely degree of economic impact on identified property and economic in-
20 terests; and
21 “[(D)] (E) Assess whether alternative actions are available that would achieve the underlying
22 lawful governmental objective and would have a lesser economic impact.
23 “(c)(A) Adopt by rule in accordance with ORS chapter 183 or by goal under ORS chapters 195,
24 196 and 197 any statewide land use policies that it considers necessary to carry out ORS chapters
25 195, 196 and 197.
26 “(B) Adopt by rule in accordance with ORS chapter 183 any procedures necessary to carry out
27 ORS 215.402 (4)(b) and 227.160 (2)(b).
28 “(C) Review decisions of the Land Use Board of Appeals and land use decisions of the Court
29 of Appeals and the Supreme Court within 120 days of the date the decisions are issued to determine
30 if goal or rule amendments are necessary.
31 “(d) Cooperate with the appropriate agencies of the United States, this state and its political
32 subdivisions, any other state, any interstate agency, any person or groups of persons with respect
33 to land conservation and development.
34 “(e) Appoint advisory committees to aid it in carrying out ORS chapters 195, 196 and 197 and
35 provide technical and other assistance, as it considers necessary, to each such committee.
36 “(2) Pursuant to ORS chapters 195, 196 and 197, the commission shall:
37 “(a) Adopt, amend and revise goals consistent with regional, county and city concerns;
38 “(b) Prepare, collect, provide or cause to be prepared, collected or provided land use inventories;
39 “(c) Prepare statewide planning guidelines;
40 “(d) Review comprehensive plans for compliance with goals;
41 “(e) Coordinate planning efforts of state agencies to assure compliance with goals and compat-
42 ibility with city and county comprehensive plans;
43 “(f) Insure widespread citizen involvement and input in all phases of the process;
44 “(g) Review and recommend to the Legislative Assembly the designation of areas of critical state
45 concern;
HA to HB 2229 Page 2
1 “(h) Report periodically to the Legislative Assembly and to the committee; [and]
2 “ (i) Review the land use planning responsibilities and authorities given to the state, re-
3 gions, counties and cities, review the resources available to each level of government and
4 make recommendations to the Legislative Assembly to improve the administration of the
5 statewide land use program; and
6 “[(i)] (j) Perform other duties required by law.
7 “(3) The requirements of subsection (1)(b) of this section shall not be interpreted as requiring
8 an assessment for each lot or parcel that could be affected by the proposed rule.
9 “ NOTE: Sections 3 and 4 were deleted by amendment. Subsequent sections were not renum-
10 bered.
11 “ SECTION 5. (1) For the purposes of correcting mapping errors made in the acknowl-
12 edgment process and updating the designation of farmlands and forestlands for land use
13 planning, a county may conduct a legislative review of lands in the county to determine
14 whether the lands planned and zoned for farm use, forest use or mixed farm and forest use
15 are consistent with the definitions of ‘agricultural lands’ or ‘forest lands’ in goals relating
16 to agricultural lands or forestlands.
17 “(2) A county may undertake the reacknowledgment process authorized by this section
18 only if the Department of Land Conservation and Development approves a work plan, from
19 the county, describing the expected scope of reacknowledgment. The department may con-
20 dition approval of a work plan for reacknowledgment under this section to reflect the re-
21 sources needed to complete the review required by sections 7 and 13 of this 2009 Act. The
22 work plan of the county and the approval of the department are not final orders for purposes
23 of review.
24 “(3) A county that undertakes the reacknowledgment process authorized by this section
25 shall provide an opportunity for all lands planned for farm use, forest use or mixed farm and
26 forest use and all lands subject to an exception under ORS 197.732 to a goal relating to ag-
27 ricultural lands or forestlands to be included in the review.
28 “(4) A county must plan and zone land reviewed under this section:
29 “(a) For farm use if the land meets the definition of ‘agricultural land’ in a goal relating
30 to agricultural lands;
31 “(b) For forest use if the land meets the definition of ‘forest land’ used for comprehensive
32 plan amendments in the goal relating to forestlands;
33 “(c) For mixed farm and forest use if the land meets both definitions;
34 “(d) For nonresource use, consistent with section 7 of this 2009 Act, if the land does not
35 meet either definition; or
36 “(e) For a rural use other than farm use or forest use as provided in a goal relating to
37 land use planning process and policy framework and subject to an exception to the appro-
38 priate goals under ORS 197.732 (2).
39 “(5) A county may consider the current land use pattern on adjacent and nearby lands
40 in determining whether land meets the appropriate definition.
41 “ SECTION 6. (1) If a county amends its comprehensive plan or a land use regulation
42 mapping zoning designations under sections 5 to 7 of this 2009 Act, the county shall review
43 lands that are planned or rezoned as nonresource lands to determine whether the lands
44 contain ecologically significant natural areas or resources. The county shall consider ap-
45 propriate goals and the ‘Oregon Conservation Strategy’ prepared in September of 2006 by the
HA to HB 2229 Page 3
1 State Department of Fish and Wildlife.
2 “(2) The county shall maintain an inventory in the comprehensive plan of nonresource
3 lands that contain ecologically significant natural areas or resources and establish a program
4 to protect the areas or resources from the adverse effects of new uses allowed by the plan-
5 ning or zoning changes. The county may use nonregulatory programs to protect the re-
6 sources including, but not limited to, programs for the transfer of severable development
7 interests to other lands that do not contain ecologically significant resources.
8 “(3) If a county amends its comprehensive plan or a land use regulation mapping zoning
9 designations under sections 5 to 7 of this 2009 Act, the county shall review lands that are
10 planned or rezoned as nonresource lands to determine that the uses allowed by the planning
11 or zoning changes are consistent with the carrying capacity of the lands. The county shall
12 ensure that:
13 “(a) The amount, type, location and pattern of development on lands redesignated as
14 nonresource lands:
15 “(A) Will be rural in character and will not significantly interfere with orderly and effi-
16 cient development of urban areas in the vicinity;
17 “(B) Will not significantly conflict with existing or reasonably foreseeable farm or forest
18 uses or with accepted farm or forest practices; and
19 “(C) Will not lead to significant adverse effects including, but not limited to, adverse ef-
20 fects on:
21 “(i) Water quality or the availability or cost of water supply;
22 “(ii) Energy use;
23 “(iii) State or local transportation facilities;
24 “(iv) Fish or wildlife habitat or other ecologically significant lands;
25 “(v) The risk of wildland fire or the cost of fire suppression;
26 “(vi) The cost of public facilities or services; or
27 “(vii) The fiscal health of a local government.
28 “(b) Additional residential development on nonresource lands is, to the extent practica-
29 ble, located and clustered to:
30 “(A) Minimize the effects on farm and forest uses;
31 “(B) Avoid lands subject to natural hazards; and
32 “(C) Reduce the costs of public facilities and services.
33 “ SECTION 7. (1) A county shall submit decisions on planning and rezoning designations
34 under sections 5 to 7 of this 2009 Act to the Department of Land Conservation and Develop-
35 ment for review pursuant to the procedures set forth in this section and section 13 of this
36 2009 Act.
37 “(2) The department shall coordinate with:
38 “(a) The State Department of Agriculture in reviewing decisions on planning and rezon-
39 ing designations for lands planned for farm use or mixed farm and forest use.
40 “(b) The State Forestry Department in reviewing decisions on planning and rezoning
41 designations for lands planned for forest use or mixed farm and forest use.
42 “(3) The Land Conservation and Development Commission has exclusive jurisdiction for
43 review of a county′s decision made under sections 5 to 7 of this 2009 Act.
44 “(4) A person who participated in the proceedings leading to the county′s decisions under
45 sections 5 to 7 of this 2009 Act may not raise an issue on review before the commission that
HA to HB 2229 Page 4
1 was not raised in the local proceedings.
2 “(5) The commission may adopt rules implementing sections 5 to 7 of this 2009 Act.
3 “ SECTION 8. ORS 197.652 is amended to read:
4 “197.652. [Programs of the collaborative regional problem-solving process described in ORS
5 197.654 and 197.656 shall be established in counties or regions geographically distributed throughout
6 the state.]
7 “ (1) At the request of a county and at least one other local government in a region, the
8 Department of Land Conservation and Development, other state agencies, as defined in ORS
9 171.133, metropolitan planning organizations, special districts and advisory committees on
10 transportation may participate with the local governments in a collaborative regional
11 problem-solving process.
12 “(2) If requested to participate, the department shall assist the county with the process
13 and encourage regional efforts to resolve land use planning problems using the authorities
14 described in ORS 197.652 to 197.658.
15 “(3) The county, in cooperation with the other local governments, shall identify the land
16 use planning problems to be addressed and the participants whose actions are necessary to
17 resolve the land use planning problems.
18 “(4) The county shall submit a proposed work scope and a proposed list of participants
19 as a proposal to the Land Conservation and Development Commission for review. The com-
20 mission shall review:
21 “(a) The proposed work scope to determine whether it can reasonably be completed
22 within the time allowed;
23 “(b) The proposed participant list to determine whether it includes, at a minimum, all
24 local governments that will need to amend a comprehensive plan provision or a land use
25 regulation, or adopt a new provision or regulation, in order to resolve the land use planning
26 problems identified in the work scope; and
27 “(c) The proposed work scope and the proposed participant list for consistency.
28 “(5) A county may initiate amendments of a comprehensive plan or land use regulation
29 under ORS 197.652 to 197.658 only if the commission approves the work scope, the list of
30 participants and a schedule for completion of the process. The schedule for completion of the
31 process may:
32 “(a) Not exceed three years except as provided in paragraph (b) of this subsection.
33 “(b) Be extended by the commission for up to one year for good cause shown.
34 “(6) The decision of a county to submit a proposal under this section, and the decision
35 of the commission to approve a proposal, are not final actions subject to judicial review.
36 “(7) If the commission approves a proposal under this section, the county must period-
37 ically report on the progress in carrying out the proposal, as specified by the commission.
38 “(8) For purposes of ORS 197.654 and 197.656, the participants in a collaborative regional
39 problem-solving process include all participants on the list of participants approved by the
40 commission unless the commission subsequently approves the addition or removal of a par-
41 ticipant.
42 “ SECTION 9. ORS 197.654 is amended to read:
43 “197.654. (1) [Local governments and those special districts that provide urban services may enter
44 into a collaborative regional problem-solving process. A collaborative regional problem-solving process
45 is a planning process directed toward resolution of land use problems in a region. The process must
HA to HB 2229 Page 5
1 offer an opportunity to participate with appropriate state agencies and all local governments within the
2 region affected by the problems that are the subject of the problem-solving process. The process must
3 include:]
4 “[(a) An opportunity for involvement by other stakeholders with an interest in the problem; and]
5 “[(b) Efforts among the collaborators to agree on goals, objectives and measures of success for steps
6 undertaken to implement the process as set forth in ORS 197.656.]
7 “[(2) As used in ORS 197.652 to 197.658, ‘region’ means an area of one or more counties, together
8 with the cities within the county, counties, or affected portion of the county.] After the Land Con-
9 servation and Development Commission approves a proposal for regional problem-solving
10 under ORS 197.652, the participants shall develop proposed actions to resolve the problems
11 identified in the work scope. The participants must agree to:
12 “(a) Regional goals that describe how the region intends to resolve each regional problem
13 described in the work scope;
14 “(b) Actions necessary to achieve the regional goals, including changes to comprehensive
15 plans or land use regulations;
16 “(c) Measurable indicators of performance and a system for monitoring progress toward
17 achievement of the regional goals;
18 “(d) Incentives and disincentives to encourage successful implementation of the actions
19 to achieve the regional goals;
20 “(e) If the regional goals involve the management of an urban growth boundary, actions
21 to coordinate the planning and provision of water, sewer and transportation facilities in the
22 region; and
23 “(f) A process for correction of actions if monitoring indicates that the actions are not
24 achieving the regional goals.
25 “(2) A decision by a participant to enter into a regional problem-solving agreement under
26 ORS 197.652 to 197.658 is not a final land use decision. However, a regional problem-solving
27 agreement is not final and binding until:
28 “(a) All local governments that are participants have adopted the provisions of the com-
29 prehensive plans or land use regulations contemplated in the agreement; and
30 “(b) The commission has approved the comprehensive plan provisions and land use reg-
31 ulations as provided under ORS 197.656.
32 “(3) Changes to provisions of comprehensive plans and land use regulations adopted to
33 implement a regional problem-solving agreement take effect 60 days after the commission
34 notifies all participants that the commission has approved all of the changes.
35 “ SECTION 10. ORS 197.656 is amended to read:
36 “197.656. (1) [Upon invitation by the local governments in a region, the Land Conservation and
37 Development Commission and other state agencies may participate with the local governments in a
38 collaborative regional problem-solving process.] After the adoption of changes to comprehensive
39 plans and land use regulations to implement a regional problem-solving agreement under
40 ORS 197.652 to 197.658, the local governments that are participants shall submit the changes
41 to the Land Conservation and Development Commission for review in the manner set forth
42 in this section.
43 “(2) Following the procedures set forth in this subsection, the commission may [acknowledge
44 amendments] approve changes to comprehensive plans and land use regulations[, or new land use
45 regulations,] that do not fully comply with [the rules of the commission that implement] the statewide
HA to HB 2229 Page 6
1 land use planning goals, without taking an exception under ORS 197.732, upon a determination that
2 the changes:
3 “[(a) The amendments or new provisions are based upon agreements reached by all local partic-
4 ipants, the commission and other participating state agencies, in the collaborative regional problem-
5 solving process;]
6 “[(b) The regional problem-solving process has included agreement among the participants on:]
7 “[(A) Regional goals for resolution of each regional problem that is the subject of the process;]
8 “[(B) Optional techniques to achieve the goals for each regional problem that is the subject of the
9 process;]
10 “[(C) Measurable indicators of performance toward achievement of the goals for each regional
11 problem that is the subject of the process;]
12 “[(D) A system of incentives and disincentives to encourage successful implementation of the tech-
13 niques chosen by the participants to achieve the goals;]
14 “[(E) A system for monitoring progress toward achievement of the goals; and]
15 “[(F) A process for correction of the techniques if monitoring indicates that the techniques are not
16 achieving the goals; and]
17 “[(c) The agreement reached by regional problem-solving process participants and the implementing
18 plan amendments and land use regulations conform, on the whole, with the purposes of the statewide
19 planning goals.]
20 “[(3) A local government that amends an acknowledged comprehensive plan or land use regulation
21 or adopts a new land use regulation in order to implement an agreement reached in a regional
22 problem-solving process shall submit the amendment or new regulation to the commission in the manner
23 set forth in ORS 197.628 to 197.650 for periodic review or set forth in ORS 197.251 for acknowledg-
24 ment.]
25 “[(4) The commission shall have exclusive jurisdiction for review of amendments or new regulations
26 described in subsection (3) of this section. A participant or stakeholder in the collaborative regional
27 problem-solving process shall not raise an issue before the commission on review that was not raised
28 at the local level.]
29 “ (a) Conform, on the whole, with the purposes of the goals, and any failure to meet in-
30 dividual goal requirements is technical or minor in nature;
31 “(b) Are needed to achieve the regional goals specified by the participants; and
32 “(c) In combination with other actions agreed upon by the participants, are reasonably
33 likely to achieve the regional goals.
34 “(3) The commission:
35 “(a) Shall review changes to the comprehensive plans or land use regulations adopted by
36 a local government to implement a regional problem-solving agreement under ORS 197.652
37 to 197.658 pursuant to the procedures set forth in this section and section 13 of this 2009 Act.
38 “(b) Has exclusive jurisdiction for review of changes to comprehensive plans or land use
39 regulations adopted by a local government to implement a regional problem-solving agree-
40 ment under ORS 197.652 to 197.658.
41 “(4) A participant in the regional problem-solving process or a person who participated
42 in the proceedings leading to the adoption of changes to the comprehensive plans or land use
43 regulations may not raise an issue on review before the commission that was not raised in
44 the local proceedings for adoption of the changes to the plans or regulations.
45 “(5) If the commission [denies an amendment or new regulation submitted pursuant to subsection
HA to HB 2229 Page 7
1 (3) of this section] disapproves changes to the comprehensive plans or land use regulations
2 adopted by a local government to implement a regional problem-solving agreement under
3 ORS 197.652 to 197.658, the commission shall issue a written statement describing the reasons for
4 the [denial] disapproval and suggesting alternative methods for accomplishing the goals on a timely
5 basis.
6 “(6) If, in order to resolve regional land use problems, the participants in a collaborative re-
7 gional problem-solving process decide to devote agricultural land or forestland, as defined in the
8 statewide planning goals, to uses not authorized by those goals, the participants shall choose land
9 that is not part of the region′s commercial agricultural or forestland base, or take an exception to
10 those goals pursuant to ORS 197.732. To identify land that is not part of the region′s commercial
11 agricultural or forestland base, the participants shall consider the recommendation of a committee
12 of persons appointed by the affected county, with expertise in appropriate fields, including but not
13 limited to farmers, ranchers, foresters and soils scientists and representatives of the State Depart-
14 ment of Agriculture, the State Department of Forestry and the Department of Land Conservation
15 and Development.
16 “(7) The Governor [shall] may require all appropriate state agencies to participate in the
17 collaborative regional problem-solving process.
18 “ (8) The commission may adopt rules to establish additional procedural and substantive
19 requirements for review of changes to comprehensive plans and land use regulations adopted
20 by local governments to implement a regional problem-solving agreement under ORS 197.652
21 to 197.658.
22 “ SECTION 11. ORS 197.747 is amended to read:
23 “197.747. For the purposes of acknowledgment under ORS 197.251, board review under ORS
24 197.805 to 197.855, [and] review of a proposed regional problem-solving agreement under ORS
25 197.652 to 197.658 or periodic review under ORS 197.628 to 197.650, ‘compliance with the goals’
26 means the comprehensive plan and regulations, on the whole, conform with the purposes of the goals
27 and any failure to meet individual goal requirements is technical or minor in nature.
28 “ SECTION 12. Section 13 of this 2009 Act is added to and made a part of ORS chapter 197.
29 “ SECTION 13. (1) The Land Conservation and Development Commission shall grant, deny
30 or remand approval of proposed changes to a comprehensive plan or land use regulations
31 adopted pursuant to sections 5 to 7 of this 2009 Act or ORS 197.652 to 197.658 within 120 days
32 after the date that the local government submits the proposed changes.
33 “(2) The Department of Land Conservation and Development shall prepare a report
34 stating whether the proposed changes comply with applicable statutes, goals and commission
35 rules. The department shall provide a reasonable opportunity for persons to prepare and
36 submit written comments or objections to the report; however a person may not:
37 “(a) Submit written comments or objections to the report unless the person participated
38 orally or in writing in the local government proceedings leading to the adoption of the pro-
39 posed changes.
40 “(b) Produce new evidence.
41 “(3) After reviewing the proposed changes, the report and any written comments and
42 objections to the report, the commission shall prepare a proposed final order. The commis-
43 sion shall afford the local government and persons who submitted written comments or ob-
44 jections to the report a reasonable opportunity to file written exceptions to the proposed
45 final order. If timely exceptions are not filed, the proposed order becomes final.
HA to HB 2229 Page 8
1 “(4) The commission′s review under this section is confined to the record of proceedings
2 before the local government, the report of the department and any comments, objections and
3 exceptions filed under subsection (2) or (3) of this section and the proposed final order of the
4 commission, including any responses to exceptions. The commission may entertain oral ar-
5 gument from the department and from persons who filed exceptions, and may consider new
6 issues raised by its review. The commission may not allow additional evidence, argument or
7 testimony that could have been presented to the local government but was not presented.
8 “(5) A commission order granting, denying or remanding proposed changes must include
9 a clear statement of findings that sets forth the basis for the approval, denial or remand,
10 including:
11 “(a) Identifying the statutes, goals and rules applicable to the proposed changes; and
12 “(b) Supporting the determinations of compliance and noncompliance.
13 “(6) A commission order granting approval may be limited to an identified geographic
14 area described in the order if:
15 “(a) The identified geographic area is the only area that is the subject of the proposed
16 changes; or
17 “(b) Specific geographic areas do not comply with the applicable statutes, goals or rules,
18 and the requirements are not technical or minor in nature.
19 “(7) The commission may issue a limited approval order if a previously issued approval
20 order is reversed or remanded by an appellate court. The limited approval order may deny
21 approval of that part of the comprehensive plan or land use regulations that the court found
22 not in compliance with the applicable statutes, goals or rules and grant approval of other
23 parts of the proposed changes.
24 “(8) A limited approval order is an approval for all purposes and is a final order for pur-
25 poses of judicial review with respect to the approved geographic area. A limited order may
26 be adopted in conjunction with a remand.
27 “ SECTION 14. In areas of the state that are growing rapidly, state agencies, as defined
28 in ORS 171.133, cities and counties should, within constraints of applicable federal law and
29 regulations, state law and rules and local ordinances:
30 “(1) Consider directing major public infrastructure investments, including major trans-
31 portation investments, to reinforce compact urban development; and
32 “(2) Consider giving priority to investments that promote infill or redevelopment of ex-
33 isting urban areas to encourage the density necessary to support alternative modes of
34 transportation.
35 “ SECTION 15. ORS 215.427 is amended to read:
36 “215.427. (1) Except as provided in subsections (3), [and] (5) and (10) of this section, for land
37 within an urban growth boundary and applications for mineral aggregate extraction, the governing
38 body of a county or its designee shall take final action on an application for a permit, limited land
39 use decision or zone change, including resolution of all appeals under ORS 215.422, within 120 days
40 after the application is deemed complete. The governing body of a county or its designee shall take
41 final action on all other applications for a permit, limited land use decision or zone change, includ-
42 ing resolution of all appeals under ORS 215.422, within 150 days after the application is deemed
43 complete, except as provided in subsections (3), [and] (5) and (10) of this section.
44 “(2) If an application for a permit, limited land use decision or zone change is incomplete, the
45 governing body or its designee shall notify the applicant in writing of exactly what information is
HA to HB 2229 Page 9
1 missing within 30 days of receipt of the application and allow the applicant to submit the missing
2 information. The application shall be deemed complete for the purpose of subsection (1) of this sec-
3 tion upon receipt by the governing body or its designee of:
4 “(a) All of the missing information;
5 “(b) Some of the missing information and written notice from the applicant that no other infor-
6 mation will be provided; or
7 “(c) Written notice from the applicant that none of the missing information will be provided.
8 “(3)(a) If the application was complete when first submitted or the applicant submits additional
9 information, as described in subsection (2) of this section, within 180 days of the date the application
10 was first submitted and the county has a comprehensive plan and land use regulations acknowledged
11 under ORS 197.251, approval or denial of the application shall be based upon the standards and
12 criteria that were applicable at the time the application was first submitted.
13 “(b) If the application is for industrial or traded sector development of a site identified under
14 section 12, chapter 800, Oregon Laws 2003, and proposes an amendment to the comprehensive plan,
15 approval or denial of the application must be based upon the standards and criteria that were ap-
16 plicable at the time the application was first submitted, provided the application complies with
17 paragraph (a) of this subsection.
18 “(4) On the 181st day after first being submitted, the application is void if the applicant has been
19 notified of the missing information as required under subsection (2) of this section and has not sub-
20 mitted:
21 “(a) All of the missing information;
22 “(b) Some of the missing information and written notice that no other information will be pro-
23 vided; or
24 “(c) Written notice that none of the missing information will be provided.
25 “(5) The period set in subsection (1) of this section may be extended for a specified period of
26 time at the written request of the applicant. The total of all extensions, except as provided in
27 subsection (10) of this section for mediation, may not exceed 215 days.
28 “(6) The period set in subsection (1) of this section applies:
29 “(a) Only to decisions wholly within the authority and control of the governing body of the
30 county; and
31 “(b) Unless the parties have agreed to mediation as described in subsection (10) of this section
32 or ORS 197.319 (2)(b).
33 “(7) Notwithstanding subsection (6) of this section, the period set in subsection (1) of this section
34 does not apply to an amendment to an acknowledged comprehensive plan or land use regulation or
35 adoption of a new land use regulation that was forwarded to the Director of the Department of Land
36 Conservation and Development under ORS 197.610 (1).
37 “(8) Except when an applicant requests an extension under subsection (5) of this section, if the
38 governing body of the county or its designee does not take final action on an application for a
39 permit, limited land use decision or zone change within 120 days or 150 days, as applicable, after
40 the application is deemed complete, the county shall refund to the applicant either the unexpended
41 portion of any application fees or deposits previously paid or 50 percent of the total amount of such
42 fees or deposits, whichever is greater. The applicant is not liable for additional governmental fees
43 incurred subsequent to the payment of such fees or deposits. However, the applicant is responsible
44 for the costs of providing sufficient additional information to address relevant issues identified in
45 the consideration of the application.
HA to HB 2229 Page 10
1 “(9) A county may not compel an applicant to waive the period set in subsection (1) of this
2 section or to waive the provisions of subsection (8) of this section or ORS 215.429 as a condition for
3 taking any action on an application for a permit, limited land use decision or zone change except
4 when such applications are filed concurrently and considered jointly with a plan amendment.
5 “ (10) The periods set forth in subsection (1) of this section and the period set forth in
6 subsection (5) of this section may be extended by up to 90 additional days, if the applicant
7 and the county agree that a dispute concerning the application will be mediated.
8 “ SECTION 16. ORS 227.178 is amended to read:
9 “227.178. (1) Except as provided in subsections (3), [and] (5) and (11) of this section, the gov-
10 erning body of a city or its designee shall take final action on an application for a permit, limited
11 land use decision or zone change, including resolution of all appeals under ORS 227.180, within 120
12 days after the application is deemed complete.
13 “(2) If an application for a permit, limited land use decision or zone change is incomplete, the
14 governing body or its designee shall notify the applicant in writing of exactly what information is
15 missing within 30 days of receipt of the application and allow the applicant to submit the missing
16 information. The application shall be deemed complete for the purpose of subsection (1) of this sec-
17 tion upon receipt by the governing body or its designee of:
18 “(a) All of the missing information;
19 “(b) Some of the missing information and written notice from the applicant that no other infor-
20 mation will be provided; or
21 “(c) Written notice from the applicant that none of the missing information will be provided.
22 “(3)(a) If the application was complete when first submitted or the applicant submits the re-
23 quested additional information within 180 days of the date the application was first submitted and
24 the city has a comprehensive plan and land use regulations acknowledged under ORS 197.251, ap-
25 proval or denial of the application shall be based upon the standards and criteria that were appli-
26 cable at the time the application was first submitted.
27 “(b) If the application is for industrial or traded sector development of a site identified under
28 section 12, chapter 800, Oregon Laws 2003, and proposes an amendment to the comprehensive plan,
29 approval or denial of the application must be based upon the standards and criteria that were ap-
30 plicable at the time the application was first submitted, provided the application complies with
31 paragraph (a) of this subsection.
32 “(4) On the 181st day after first being submitted, the application is void if the applicant has been
33 notified of the missing information as required under subsection (2) of this section and has not sub-
34 mitted:
35 “(a) All of the missing information;
36 “(b) Some of the missing information and written notice that no other information will be pro-
37 vided; or
38 “(c) Written notice that none of the missing information will be provided.
39 “(5) The 120-day period set in subsection (1) of this section may be extended for a specified pe-
40 riod of time at the written request of the applicant. The total of all extensions, except as provided
41 in subsection (11) of this section for mediation, may not exceed 245 days.
42 “(6) The 120-day period set in subsection (1) of this section applies:
43 “(a) Only to decisions wholly within the authority and control of the governing body of the city;
44 and
45 “(b) Unless the parties have agreed to mediation as described in subsection (11) of this section
HA to HB 2229 Page 11
1 or ORS 197.319 (2)(b).
2 “(7) Notwithstanding subsection (6) of this section, the 120-day period set in subsection (1) of
3 this section does not apply to an amendment to an acknowledged comprehensive plan or land use
4 regulation or adoption of a new land use regulation that was forwarded to the Director of the De-
5 partment of Land Conservation and Development under ORS 197.610 (1).
6 “(8) Except when an applicant requests an extension under subsection (5) of this section, if the
7 governing body of the city or its designee does not take final action on an application for a permit,
8 limited land use decision or zone change within 120 days after the application is deemed complete,
9 the city shall refund to the applicant, subject to the provisions of subsection (9) of this section, ei-
10 ther the unexpended portion of any application fees or deposits previously paid or 50 percent of the
11 total amount of such fees or deposits, whichever is greater. The applicant is not liable for additional
12 governmental fees incurred subsequent to the payment of such fees or deposits. However, the ap-
13 plicant is responsible for the costs of providing sufficient additional information to address relevant
14 issues identified in the consideration of the application.
15 “(9)(a) To obtain a refund under subsection (8) of this section, the applicant may either:
16 “(A) Submit a written request for payment, either by mail or in person, to the city or its
17 designee; or
18 “(B) Include the amount claimed in a mandamus petition filed under ORS 227.179. The court
19 shall award an amount owed under this section in its final order on the petition.
20 “(b) Within seven calendar days of receiving a request for a refund, the city or its designee shall
21 determine the amount of any refund owed. Payment, or notice that no payment is due, shall be made
22 to the applicant within 30 calendar days of receiving the request. Any amount due and not paid
23 within 30 calendar days of receipt of the request shall be subject to interest charges at the rate of
24 one percent per month, or a portion thereof.
25 “(c) If payment due under paragraph (b) of this subsection is not paid within 120 days after the
26 city or its designee receives the refund request, the applicant may file an action for recovery of the
27 unpaid refund. In an action brought by a person under this paragraph, the court shall award to a
28 prevailing applicant, in addition to the relief provided in this section, reasonable attorney fees and
29 costs at trial and on appeal. If the city or its designee prevails, the court shall award reasonable
30 attorney fees and costs at trial and on appeal if the court finds the petition to be frivolous.
31 “(10) A city may not compel an applicant to waive the 120-day period set in subsection (1) of this
32 section or to waive the provisions of subsection (8) of this section or ORS 227.179 as a condition for
33 taking any action on an application for a permit, limited land use decision or zone change except
34 when such applications are filed concurrently and considered jointly with a plan amendment.
35 “ (11) The period set forth in subsection (1) of this section and the period set forth in
36 subsection (5) of this section may be extended by up to 90 additional days, if the applicant
37 and the city agree that a dispute concerning the application will be mediated.
38 “ SECTION 17. (1) The Land Conservation and Development Commission, in cooperation
39 with the Oregon Law Commission and other public or private entities, may, as resources are
40 available, appoint a work group to conduct a policy-neutral review and audit of ORS chapters
41 195, 196, 197, 215 and 227, the statewide land use planning goals and the rules of the com-
42 mission implementing the goals.
43 “(2) The commission shall sequence any review based on its judgment as to which aspects
44 of the statewide land use program are most in need of updating.
45 “(3) A review undertaken under this section should, but does not have to, include ap-
HA to HB 2229 Page 12
1 propriate involvement of local government, professional land use planning, private legal and
2 other representatives.
3 “(4) Recommendations should, but do not have to, address major policies and key proce-
4 dures that are most appropriate for enactment by law and what policies and procedures are
5 most appropriate for adoption by statewide land use planning goals or rules to allow for
6 greater variation between regions of the state over time and to reduce complexity.
7 “ SECTION 18. Section 13 of this 2009 Act and the amendments to ORS 197.652, 197.654,
8 197.656 and 197.747 by sections 8, 9, 10 and 11 of this 2009 Act apply to collaborative regional
9 problem-solving processes commenced on or after the effective date of this 2009 Act.
10 “ SECTION 19. This 2009 Act being necessary for the immediate preservation of the public
11 peace, health and safety, an emergency is declared to exist, and this 2009 Act takes effect
12 on its passage.”.
13
HA to HB 2229 Page 13