← Find this measure
2015 Regular Session · HB 2451
A-Engrossed — HB 2451 (2015R1)
This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.
Other indexed documents for this measure (2)
- A-Engrossed — HB 2451 (2015R1) · open
- OLIS measure summary
Recorded legislative activity (34)
- First Reading Of House Bills
- First reading. Referred to Speaker's desk.
- Referred to Energy and Environment with subsequent referral to Revenue, then Ways and Means.
- Heard
- Public Hearing held.
- Heard and Reported Out with Amendments
- Work Session held.
- Recommendation: Do pass with amendments, be printed A-Engrossed, subsequent referral to Revenue be rescinded, and be referred to Ways and Means by prior reference.
- Subsequent referral to Revenue rescinded by order of the Speaker.
- Referred to Ways and Means by prior reference.
- Assigned to Subcommittee On Natural Resources.
- Heard and Reported Out
- Work Session held.
- Returned to Full Committee.
- Heard and Reported Out
- Work Session held.
- Recommendation: Do pass.
- Second Reading Of House Bills
- Second reading.
- Third Reading Of House Bills
- Third reading. Carried by Gomberg. Passed.
- First Reading Of House Measures
- First reading. Referred to President's desk.
- Referred to Ways and Means.
- Second Reading Of House Measures
- Recommendation: Do pass the A-Eng. bill.
- Second reading.
- Carried over to 06-18 by unanimous consent.
- Third Reading Of House Measures
- Third reading. Carried by Hansell. Passed.
- Speaker signed.
- President signed.
- Governor signed.
- Chapter 626, (2015 Laws): Effective date January 1, 2016.
Citation and provenance
Oregon Legislature. A-Engrossed — HB 2451 (2015R1). 2015 Regular Session. https://olis.oregonlegislature.gov/liz/2015R1/Downloads/MeasureDocument/HB2451/A-Engrossed Retrieved 2026-09-02.
Document ID: doc_245002f7d460ee841892
Original SHA-256: d5e439fa70799b1a5c2932ed2e3d7ab6e1d255f51d2992de77fb8f95282017aa
Extracted text SHA-256: dcc59ca9cd328e0fdb7cce8bad7879a3fb2e9445e3a6476a6657f414cfc86968
78th OREGON LEGISLATIVE ASSEMBLY--2015 Regular Session
A-Engrossed
House Bill 2451
Ordered by the House February 17
Including House Amendments dated February 17
Introduced and printed pursuant to House Rule 12.00. Presession filed (at the request of Governor John A.
Kitzhaber, M.D., for Department of Environmental Quality)
SUMMARY
The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
to consideration by the Legislative Assembly. It is an editor’s brief statement of the essential features of the
measure.
Extends maximum loan term for loans made from Water Pollution Control Revolving
Fund to 30 years.
Allows Department of Environmental Quality to buy or refinance debt obligations of public
agencies for all projects otherwise qualified for financial assistance through Water Pollution Control
Revolving Fund.
1 A BILL FOR AN ACT
2 Relating to Water Pollution Control Revolving Fund; amending ORS 468.429 and 468.440.
3 Be It Enacted by the People of the State of Oregon:
4 SECTION 1. ORS 468.429 is amended to read:
5 468.429. (1) The Department of Environmental Quality shall use the moneys in the Water Pol-
6 lution Control Revolving Fund to provide financial assistance:
7 (a) To public agencies for the construction or replacement of treatment works.
8 (b) For the implementation of a management program established under section 319 of the fed-
9 eral Water Quality Act of 1986 relating to the management of nonpoint sources of pollution.
10 (c) For development and implementation of a conservation and management plan under section
11 320 of the federal Water Quality Act of 1986 relating to the national estuary program.
12 (2) The department may also use the moneys in the Water Pollution Control Revolving Fund for
13 the following purposes:
14 (a) To buy or refinance the [treatment works’] debt obligations of public agencies for eligible
15 projects as listed under subsection (1) of this section, if [such debt] the debt obligation was
16 incurred after March 7, 1985.
17 (b) To guarantee, or purchase insurance for, public agency obligations for treatment works’
18 construction or replacement if the guarantee or insurance would improve credit market access or
19 reduce interest rates, or to provide loans to a public agency for this purpose.
20 (c) To pay the expenses of the department in administering the Water Pollution Control Re-
21 volving Fund, to make transfers to the Water Pollution Control Administration Fund, or to pay other
22 departmental costs including expenses of the program described in ORS 468.433 (2).
23 (3) If amounts are advanced to the Water Pollution Control Revolving Fund from the Pollution
24 Control Fund under ORS 468.220 (1), the department shall transfer from the Water Pollution Control
25 Revolving Fund to the Pollution Control Sinking Fund amounts sufficient to pay the bonds that
26 funded the advance.
NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
New sections are in boldfaced type.
LC 584
A-Eng. HB 2451
1 SECTION 2. ORS 468.440 is amended to read:
2 468.440. (1) The Environmental Quality Commission shall establish by rule policies for estab-
3 lishing loan terms and interest rates for loans made from the Water Pollution Control Revolving
4 Fund that ensure that the objectives of ORS 468.423 to 468.440 are met and that adequate funds are
5 maintained in the Water Pollution Control Revolving Fund to meet future needs. In establishing the
6 policy, the commission shall take into consideration at least the following factors:
7 (a) The capability of the project to enhance or protect water quality.
8 (b) The ability of a public agency to repay a loan.
9 (c) Current market rates of interest.
10 (d) The size of the community or district to be served by the treatment works.
11 (e) The type of project financed.
12 (f) The ability of the applicant to borrow elsewhere.
13 (g) Whether advances have been made to the Water Pollution Control Revolving Fund from the
14 Pollution Control Fund that must be repaid to the Pollution Control Sinking Fund.
15 (2) The commission may establish an interest rate ranging from zero to the market rate. The
16 commission may establish the loan term, provided that the loans must be fully amortized not later
17 than [20] 30 years after project completion.
18 (3) The commission shall adopt by rule any procedures or standards necessary to carry out the
19 provisions of ORS 468.423 to 468.440.
20
[2]