Skip to content
← Find this measure

2009 REGULAR SESSION · HB 2864

Introduced — HB 2864 (2009R1)

This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.

Other indexed documents for this measure (2)
Recorded legislative activity (4)
  1. First Reading Of House Bills
  2. First reading. Referred to Speaker's desk.
  3. Referred to Land Use.
  4. In committee upon adjournment.
Citation and provenance

Oregon Legislature. Introduced — HB 2864 (2009R1). 2009 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2009R1/Downloads/MeasureDocument/HB2864/Introduced Retrieved 2026-09-02.

Document ID: doc_262352f80242caa88cde

Original SHA-256: d31d879d2917650ecea3b923ba933310d9e7f0d7f3a072c12b637b92d7a7e1d7

Extracted text SHA-256: db1a4adc24ecdf3ee547bb82355ffc605d88448b01108d39ddc73406aa30f8a4

                                 75th OREGON LEGISLATIVE ASSEMBLY--2009 Regular Session



                                              House Bill 2864
     Sponsored by Representative SCHAUFLER (at the request of Oregon Home Builders Association)


                                                             SUMMARY
     The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
     to consideration by the Legislative Assembly. It is an editor′s brief statement of the essential features of the
     measure as introduced.

         Permits city, notwithstanding charter, to annex land within urban growth boundary without
     election in city.
         Prohibits inclusion of land in inventory of buildable lands if, five years after inclusion of land
     within urban growth boundary of district, land use plan changes facilitating urban level development
     have not been made and acknowledged.
         Removes land from urban growth boundary and includes land within urban reserve if, 10 years
     after inclusion of land within urban growth boundary of district, land use plan changes facilitating
     urban level development have not been made and acknowledged.

 1                                                   A BILL FOR AN ACT
 2   Relating to land use planning for land included within urban growth boundary.
 3   Be It Enacted by the People of the State of Oregon:
 4        SECTION 1. After land is included within an urban growth boundary, notwithstanding a
 5   local charter provision to the contrary, a city annexing the land may not require a vote of
 6   the electors in the city.
 7        SECTION 2. Section 3 of this 2009 Act is added to and made a part of ORS 197.295 to
 8   197.314.
 9        SECTION 3. After land is included within an urban growth boundary for a metropolitan
10   service district, if changes in the regional framework plan and appropriate comprehensive
11   plans to facilitate urban level development of the land have not been made and acknowledged:
12        (1) Within five years after the decision to include the land in the urban growth boundary
13   becomes effective, local governments may not include the land in an inventory of buildable
14   lands.
15        (2) Within 10 years after the decision to include the land in the urban growth boundary
16   becomes effective, the land is automatically withdrawn from the urban growth boundary and
17   included within the urban reserve, as defined in ORS 195.137, of the metropolitan service
18   district.
19        SECTION 4. Section 3 of this 2009 Act applies to land that is included within an urban
20   growth boundary for a metropolitan service district on or after the effective date of this 2009
21   Act.
22




     NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
     New sections are in boldfaced type.

     LC 3284