← Find this measure
2009 REGULAR SESSION · HB 2864
Introduced — HB 2864 (2009R1)
This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.
Other indexed documents for this measure (2)
- Introduced — HB 2864 (2009R1) · open
- OLIS measure summary
Recorded legislative activity (4)
- First Reading Of House Bills
- First reading. Referred to Speaker's desk.
- Referred to Land Use.
- In committee upon adjournment.
Citation and provenance
Oregon Legislature. Introduced — HB 2864 (2009R1). 2009 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2009R1/Downloads/MeasureDocument/HB2864/Introduced Retrieved 2026-09-02.
Document ID: doc_262352f80242caa88cde
Original SHA-256: d31d879d2917650ecea3b923ba933310d9e7f0d7f3a072c12b637b92d7a7e1d7
Extracted text SHA-256: db1a4adc24ecdf3ee547bb82355ffc605d88448b01108d39ddc73406aa30f8a4
75th OREGON LEGISLATIVE ASSEMBLY--2009 Regular Session
House Bill 2864
Sponsored by Representative SCHAUFLER (at the request of Oregon Home Builders Association)
SUMMARY
The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
to consideration by the Legislative Assembly. It is an editor′s brief statement of the essential features of the
measure as introduced.
Permits city, notwithstanding charter, to annex land within urban growth boundary without
election in city.
Prohibits inclusion of land in inventory of buildable lands if, five years after inclusion of land
within urban growth boundary of district, land use plan changes facilitating urban level development
have not been made and acknowledged.
Removes land from urban growth boundary and includes land within urban reserve if, 10 years
after inclusion of land within urban growth boundary of district, land use plan changes facilitating
urban level development have not been made and acknowledged.
1 A BILL FOR AN ACT
2 Relating to land use planning for land included within urban growth boundary.
3 Be It Enacted by the People of the State of Oregon:
4 SECTION 1. After land is included within an urban growth boundary, notwithstanding a
5 local charter provision to the contrary, a city annexing the land may not require a vote of
6 the electors in the city.
7 SECTION 2. Section 3 of this 2009 Act is added to and made a part of ORS 197.295 to
8 197.314.
9 SECTION 3. After land is included within an urban growth boundary for a metropolitan
10 service district, if changes in the regional framework plan and appropriate comprehensive
11 plans to facilitate urban level development of the land have not been made and acknowledged:
12 (1) Within five years after the decision to include the land in the urban growth boundary
13 becomes effective, local governments may not include the land in an inventory of buildable
14 lands.
15 (2) Within 10 years after the decision to include the land in the urban growth boundary
16 becomes effective, the land is automatically withdrawn from the urban growth boundary and
17 included within the urban reserve, as defined in ORS 195.137, of the metropolitan service
18 district.
19 SECTION 4. Section 3 of this 2009 Act applies to land that is included within an urban
20 growth boundary for a metropolitan service district on or after the effective date of this 2009
21 Act.
22
NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
New sections are in boldfaced type.
LC 3284