Skip to content
← Find this measure

2011 Regular Session · SB 5513

Budget Report — SB 5513 (2011R1)

This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.

Other indexed documents for this measure (6)
Recorded legislative activity (37)
  1. Introduction and First Reading Of Senate Measures
  2. Introduction and first reading. Referred to President's desk.
  3. Referred to Ways and Means.
  4. Assigned to Subcommittee On Natural Resources.
  5. Heard
  6. Public Hearing held.
  7. Heard
  8. Public Hearing held.
  9. Heard
  10. Public Hearing held.
  11. Heard
  12. Public Hearing held.
  13. Not Heard
  14. Heard and Reported Out
  15. Work Session held.
  16. Returned to Full Committee.
  17. Heard and Reported Out with Amendments
  18. Work Session held.
  19. Recommendation: Do pass with amendments. (Printed A-Eng.)
  20. Second Reading Of Senate Measures
  21. Second reading.
  22. Third Reading Of Senate Measures
  23. Third reading. Carried by Edwards. Passed.
  24. First Reading Of Senate Bills
  25. First reading. Referred to the desks of the Co-Speakers.
  26. Referred to Ways and Means.
  27. Recommendation: Do pass.
  28. Second Reading Of Senate Bills
  29. Second reading.
  30. Rules suspended. Carried over to June 16, 2011 Calendar.
  31. Third reading. Carried by Jenson. Passed.
  32. Third Reading Of Senate Bills
  33. President signed.
  34. Co-Speakers signed.
  35. Governor signed.
  36. Chapter 573, 2011 Laws.
  37. Effective date, June 28, 2011.
Citation and provenance

Oregon Legislature. Budget Report — SB 5513 (2011R1). 2011 Regular Session. https://olis.oregonlegislature.gov/liz/2011R1/Downloads/MeasureAnalysisDocument/14228 Retrieved 2026-09-02.

Document ID: doc_35f1a2d5ac8f9f4a2e88

Original SHA-256: a470e8169a18ed150d9c93287fc6680efaec60c945d7f09a6279bdda973b4c51

Extracted text SHA-256: cdcab5696818fe2d0bb83634ff08cec13194d91e779b412d770533a98a0da430

                                                                                               Corrected Copy

76th OREGON LEGISLATIVE ASSEMBLY – 2011 Regular Session                                         MEASURE:            SB 5513-A
BUDGET REPORT AND MEASURE SUMMARY
                                                                                                Carrier – House: Rep. Jenson
JOINT COMMITTEE ON WAYS AND MEANS                                                               Carrier – Senate: Sen. Edwards


Action:   Do Pass as Amended and as Printed A-Engrossed

Vote:    23 – 1 – 1
 House – Yeas: Beyer, Buckley, Cowan, Freeman, Garrard, Komp, Kotek, McLane, Nathanson, Nolan, G. Smith, Whisnant
       – Nays: Thatcher
       – Exc: Richardson

Senate – Yeas: Bates, Devlin, Edwards, Girod, Johnson, Monroe, Nelson, Thomsen, Verger, Whitsett, Winters
       – Nays:
       – Exc:

Prepared By:    Art Ayre, Department of Administrative Services

Reviewed By:    Paul Siebert, Legislative Fiscal Office

Meeting Date: June 3, 2011

Agency                                                                 Budget Page              LFO Analysis Page           Biennium
Department of Fish and Wildlife                                           F-11                        135                    2011-13




                                                                                                                                 SB 5513-A
                                                                                                                                Page 1 of 18
Budget Summary*                                                                                                                                        Committee Change from
                                                   2009-11                   2011-13                   2011-13                    2011-13               2009-11 Leg Approved
                                            Legislatively Approved                                                              Committee
                                                                       Current Service Level       Governor's Budget                                  $ Change           % Change
                                                  Budget (1)                                                                  Recommendation
General Fund                              $               11,275,358 $            14,301,715 $               11,626,429 $               6,610,171 $      -4,665,187           -41.4%
General Fund Debt Service                 $                  355,543 $                350,262 $                 350,262 $                 338,094 $         -17,449            -4.9%
General Fund Capital Improvement          $                1,653,642 $                161,334 $                 157,553 $                 142,194 $      -1,511,448           -91.4%
Lottery Funds                             $                6,105,448 $              6,574,180 $               3,645,741 $               5,824,398 $        -281,050            -4.6%
Other Funds                               $             146,472,387 $            157,558,317 $              165,163,995 $            165,948,577 $       19,476,190           +13.3%
Other Funds Capital Improvement           $                6,522,836 $              6,349,960 $               7,591,722 $               7,711,722 $       1,188,886           +18.2%
Federal Funds                             $               96,306,314 $            98,718,380 $              112,376,592 $            109,798,650 $       13,492,336           +14.0%
Federal Funds Capital Improvement         $                  150,193 $                      0 $                 600,000 $                       0 $        -150,193          -100.0%

Total                                     $             268,841,721 $            284,014,148 $              301,512,294 $             296,373,806 $      27,532,085            +10.2%

Position Summary
Authorized Positions                                          1,379                    1,344                      1,493                     1,466                   87
Full-time Equivalent (FTE) Positions                       1,162.20                 1,141.76                   1,239.24                  1,227.32                65.12

(1) Includes adjustments through M arch 2011.
* Excludes Capital Construction expenditures


2009-11 Expenditure Limitation Adjustments
Other Funds                              $                            $                        $                          $               100,000 $
Federal Funds                            $                            $                        $                          $             1,750,000 $
Total                                    $                            $                        $                          $             1,850,000 $


Position Summary
Authorized Positions                                                                                                                           8
Full-time Equivalent (FTE) Positions                                                                                                        0.50



Summary of Revenue Changes
The Subcommittee approved a budget that includes a substantial increase in Federal Funds revenue from Mitchell Act funding for Oregon’s fish
hatchery system, the Federal Columbia River Power System Biological Opinion, the National Oceanic and Atmospheric Administration’s Biological
Opinion for the operation of the U.S. Army Corps of Engineers’ Willamette Project, and the Pittman-Robertson Wildlife Restoration Act. The budget

                                                                                                                                                                            SB 5513-A
                                                                                                                                                                           Page 2 of 18
also includes Other Funds revenues from the Pacific Coastal Salmon Recovery Fund. Projected revenues from Measure 76 dedicated Lottery Funds
are reduced in two divisions in Package 070 – Revenue Shortfalls.


Summary of Natural Resources Subcommittee Action
The Oregon Department of Fish and Wildlife (ODFW) protects and enhances Oregon’s fish and wildlife and their habitats for use and
enjoyment by present and future generations. The Subcommittee approved a budget of $296,373,806 total funds ($7,090,459 General
Fund, $5,824,398 Measure 76 Lottery Funds, $173,660,299 Other Funds, and $109,798,650 Federal Funds) and 1,227.32 FTE. The total
funds budget is 10.2 percent greater than the 2009-11 Legislatively Approved Budget through March 2011 and 4.4 percent greater than
the 2011-13 Current Service Level. General Fund, however, is 46.6 percent lower than 2009-11 LAB, a reduction of $6.2 million.

Fish Division - Propagation
The Fish Propagation program operates and administers hatcheries and remote rearing of adult fish collection facilities. The Subcommittee approved
a total funds budget of $49,994,647 and 236.59 FTE.

The Subcommittee approved Package 086 and Package 087 which eliminate most inflation and decrease projected personal services costs by 5.5
percent.

The Subcommittee approved Package 090, Analyst Adjustments. This package removes General Fund and position authority from the agency’s Eggs
and Carcass program. It also closes the Butte Falls Hatchery and reduces position authority. The package reduces Oregon’s hatchery production
capacity for trout and salmon. The package reduces General Fund by $804,891 and eliminates four positions (3.61 FTE).

The Subcommittee approved Package 092, Fund Shifts/Sweeps. This package increases Other Funds expenditure limitation by $439,607 and
establishes three positions (2.61 FTE) in Eggs and Carcass to restore reductions made in Package 090.

The Subcommittee approved Package 105, Restoration of Mitchell Act Funds – Propagation. This package establishes five limited-duration, full-time
positions; increases two seasonal positions; and provides Federal Funds limitation for these positions from restored federal Mitchell Act funding for
Oregon’s fish hatchery system. The package also reduces Other Funds due to the additional Federal Funds. The Subcommittee approved this package
on a one-time basis; the package is to be phased out during 2013-15 budget development. The package reduces General Fund by $61 and Other Funds
expenditure limitation by $519,535, increases Federal Funds expenditure limitation by $1,771,926, and establishes five positions (5.92 FTE).

The Subcommittee approved Package 801, Targeted Statewide Adjustments. This package implements a statewide reduction action included in
the Co-Chairs’ Budget, which is a 6.5 percent reduction from total General Fund and Lottery Funds Services and Supplies expenditures included
in the Governor’s Recommended Budget. This is in addition to Package 086, which eliminates most Services and Supplies inflation originally
built into the budget. This package reduces General Fund by $68,100.

                                                                                                                                           SB 5513-A
                                                                                                                                          Page 3 of 18
The Subcommittee approved Package 802, Vacant Position Savings. This package eliminates primarily long-term vacant positions that have been
reviewed and determined to not be critical for supporting the agency’s core programs. The package reduces General Fund by $61,288, Other
Funds expenditure limitation by $442,729, and Federal Funds expenditure limitation by $467,533, and eliminates 16 positions (8.60 FTE).

The Subcommittee approved Package 811, Position Alignment Actions. This adjustment combines two part-time seasonal positions into one part-
time seasonal position. The package eliminates one position (0.00 FTE).

The Subcommittee approved Package 819, Supplemental Statewide Ending Balance. This package includes, per the Co-Chairs’ budget plan, a
supplemental statewide ending balance hold back adjustment. The result is about a 3.5 percent across-the-board reduction to an agency’s total
biennial General Fund and/or Lottery Funds budget or approximately 7 percent to be taken from the second year of the budget. The package
reduces General Fund by $132,626.

Fish Division – Natural Production
This program directs fish inventory, regulation and assessment of fisheries, development and administration of fish regulations, and development
of fish conservation and management plans. It also manages the Salmon Trout Enhancement Program (STEP), the Restoration and Enhancement
(R&E) program, threatened and endangered species, and the Fish Screening Program. The Subcommittee approved a total funds budget of
$77,168,966 and 451.20 FTE.

The Subcommittee approved Package 070, Revenue Shortfalls. This package reduces total Lottery Funds expenditure limitation by $227,468 due to a
projected decline in Measure 76 dedicated Lottery Funds revenue.

The Subcommittee approved Package 086 and Package 087 which eliminate most inflation and decrease projected personal services costs by 5.5
percent.

The Subcommittee approved Package 090, Analyst Adjustments. This package reduces General Fund and positions that are restored in Package 092.
In its final version, this package restores General Fund and shifts funding from Lottery Funds to Pacific Coastal Salmon Recovery Funds (PCSRF)
while adding back earlier reductions. The package reduces General Fund by $255,760 and Lottery Funds expenditure limitation by $4,208,354, and
increases Other Funds expenditure limitation by $4,416,252 and Federal Funds expenditure limitation by $245,070, and eliminates three positions
(2.82 FTE).

The Subcommittee approved Package 092, Fund Shifts/Sweeps. This package increases Other Funds and Federal Funds expenditure limitation and
position authority to restore Conservation and Recovery funding and positions removed in Package 090 using Other Funds license fees and federal
funds. The package increases Other Funds expenditure limitation by $276,673 and Federal Funds expenditure limitation by $50,087 and establishes
two positions (1.82 FTE).

The Subcommittee approved Package 121, Coastal Chinook Salmon Monitoring and Evaluation. This package provides Federal Funds expenditure
limitation and position authority to implement the Oregon Coast Chinook Salmon Sentinel Stocks Program in the Siletz and Nehalem river basins.
                                                                                                                                        SB 5513-A
                                                                                                                                       Page 4 of 18
The package establishes four limited-duration, full-time positions and 20 limited-duration seasonal positions. The agency is currently receiving
Federal Funds from the Pacific Salmon Commission for this work and is double-filling existing Federal Funds positions to accomplish the work of the
program. The Subcommittee approved this package on a one-time basis, to be phased out during 2013-15 budget development. The package increases
Federal Funds expenditure limitation by $1,469,605, and establishes 24 positions (12.98 FTE).

The Subcommittee approved Package 122, Willamette Salmon/Steelhead Research, Monitoring, and Evaluation. This package provides Federal Funds
expenditure limitation and position authority to implement Research, Monitoring, and Evaluation activities as part of the National Oceanic and
Atmospheric Administration’s Biological Opinion for the operation of the U.S. Army Corps of Engineers’ Willamette Project. Success of
implementing Biological Opinion actions can only be measured through research and evaluation. Implementation of the Willamette Biological
Opinion and associated Research, Monitoring, and Evaluation is expected to continue through 2023. The package establishes 10 limited-duration, full-
time positions and 24 limited-duration seasonal positions. The Subcommittee approved this package on a one-time basis, to be phased out during
2013-15 budget development. The package increases Federal Funds expenditure limitation by $2,879,315, and establishes 34 positions (22.00 FTE).

The Subcommittee approved Package 123, John Day Spring Chinook Monitoring. This package provides Other Funds limitation to evaluate trends in
salmon populations in the John Day River. It makes no change to position authority. This work is currently done using Federal Funds from the
Bonneville Power Administration. The package shifts funding in the 2011-13 biennium to the Pacific Coastal Salmon Recovery Fund. The package
increases Other Funds expenditure limitation by $172,349 and reduces Federal Funds expenditure limitation by $171,776.

The Subcommittee approved Package 124, Northeast Oregon Salmon/Steelhead Research, Monitoring, and Evaluation. This package provides Federal
Funds limitation and position authority to implement monitoring of salmon and steelhead populations and habitats in the Interior Columbia River
Basin due to the Federal Columbia River Power System Biological Opinion. The package establishes 12 limited-duration, full-time positions and 26
limited-duration seasonal positions. The Subcommittee approved this package on a one-time basis, to be phased out during 2013-15 budget
development. The package increases Federal Funds expenditure limitation by $5,328,834 and establishes 38 positions (22.44 FTE).

The Subcommittee approved Package 125, Northeast Steelhead and Chinook Monitoring. This package provides Federal Funds limitation for four
limited-duration, full-time positions (4.00 FTE) to continue monitoring of Federal Endangered Species Act listed salmon and steelhead populations in
the John Day and Grande Ronde river basins and captive brood hatchery programs for Grande Ronde spring Chinook. Funding is from the Federal
Columbia River Power System Biological Opinion. The Subcommittee approved this package on a one-time basis, to be phased out during 2013-15
budget development. The package increases Federal Funds expenditure limitation by $544,000.

The Subcommittee approved Package 126, Lower Columbia Chum Monitoring. This package originally provided Federal Funds limitation and
position authority for four limited-duration, full-time positions (4.00 FTE) to monitor Lower Columbia River chum populations, with funding from
the Bonneville Power Administration. The revised package shifts funding to Other Funds from the Pacific Coastal Salmon Recovery Fund. The
Subcommittee approved this package on a one-time basis, to be phased out during 2013-15 budget development. The package increases Other Funds
expenditure limitation by $635,711, decreases Federal Funds expenditure limitation by $635,711, and establishes 4 positions (4.00 FTE).



                                                                                                                                           SB 5513-A
                                                                                                                                          Page 5 of 18
The Subcommittee approved Package 127, Lower Columbia Fish Habitat Monitoring. This package provides Other Funds limitation and position
authority to establish four limited-duration seasonal positions (1.00 FTE) and two limited-duration, full-time positions (2.00 FTE) to provide data on
water conditions, stream channel depths and sizes, riparian conditions, and capacity to rear and hold fish in the Oregon portion of the Lower Columbia
River. Funding is from the Pacific Coastal Salmon Recovery Fund (PCSRF). The Subcommittee approved this package for funding with PCSRF on a
one-time basis. The package increases Other Funds expenditure limitation by $500,000 and decreases Federal Funds expenditure limitation by
$500,000.

The Subcommittee approved Package 128, Lower Columbia Adult Steelhead Monitoring. This package provides Other Funds expenditure limitation
and position authority to establish 12 limited-duration positions (6.14 FTE) to gather information on the population of winter steelhead spawners in
nine areas of the Lower Columbia River basin. Funding is from the Pacific Coastal Salmon Recovery Fund (PCSRF). The Subcommittee approved
this package for funding with PCSRF on a one-time basis. The package increases Other Funds expenditure limitation by $1,300,000.

The Subcommittee approved Package 129, Lower Columbia and Sandy Chinook and Oregon Chub Monitoring. This package provides Federal Funds
expenditure limitation and position authority to continue 11 limited-duration, seasonal full-time positions (4.61 FTE) and one limited-duration, full-
time position (1.00 FTE) to monitor fall Chinook salmon in the Lower Columbia, to track stray rates of Chinook in the Sandy River basin, and to
conduct Oregon chub surveys. The Subcommittee approved this package on a one-time basis. The package increases Federal Funds expenditure
limitation by $531,409.

The Subcommittee approved Package 130, Salmon River Coho Recovery Research – OWEB. This package originally provided Lottery Funds
expenditure limitation and position authority to establish three limited-duration, full-time positions (1.42 FTE) and two limited-duration seasonal
positions (1.00 FTE) to complete a study of how the 2007 cessation of hatchery fish releases in the Salmon River system affects wild coho salmon
populations. The study started in the 2007-09 biennium. The additional two years of limitation will allow the agency to follow the first generation of
naturally spawned coho salmon in the absence of hatchery influence. The Subcommittee approved this package with Other Funds funding from
Pacific Coastal Salmon Recovery Funds on a one-time basis. The package increases Other Funds expenditure limitation by $336,000.

The Subcommittee approved Package 141, Fish Conservation and Recovery Positions. This package originally provided Other Funds expenditure
limitation and position authority to establish four permanent, full-time positions (4.00 FTE) to lead the agency’s development of recovery plans
required under the federal Endangered Species Act and conservation plans required under the state’s Native Fish Conservation Policy. The positions
will also provide direction and oversight to field staff implementing those plans. The Subcommittee approved this package with three limited-
duration, full-time positions (3.00 FTE) with Other Funds funding from Pacific Coastal Salmon Recovery Funds on a one-time basis. The package
increases Other Funds expenditure limitation by $169,750.

The Subcommittee approved Package 144, Fish Screens – Mitchell Act Limitation and LD Continued. This package provides Other Funds and
Federal Funds expenditure limitation and position authority to establish two limited-duration, full-time positions (2.00 FTE) and one limited-duration
seasonal position (0.42 FTE) to provide fish screens for water diversions on private property to help protect Endangered Species Act listed species of
fish. The Federal Funds are Mitchell Act Funds and the Other Funds are non-license. The Subcommittee approved this package on a one-time basis.
The package increases Other Funds expenditure limitation by $40,555 and Federal Funds expenditure limitation by $243,794.
                                                                                                                                              SB 5513-A
                                                                                                                                             Page 6 of 18
The Subcommittee approved Package 150, Wave Energy Specialist. This package provides Other Funds expenditure limitation and position authority
to establish one limited-duration, full-time position (1.00 FTE) to represent the agency and provide marine resource and habitat expertise in Federal
Energy Regulatory Commission permitting and licensing of wave energy projects as well as to negotiate settlement agreements and to participate in
post-licensing activities. Funding is from existing hydroelectric project annual fees. The Subcommittee approved this package on a one-time basis, to
be phased out in 2013-15 budget development. The package increases Other Funds expenditure limitation by $174,020.

The Subcommittee approved Package 801, Targeted Statewide Adjustments. This package implements a statewide reduction action included in
the Co-Chairs’ Budget, which is a 6.5 percent reduction from total General Fund and Lottery Funds Services and Supplies expenditures included
in the Governor’s Recommended Budget. This is in addition to Package 086, which eliminates most Services and Supplies inflation originally
built into the budget. This package reduces General Fund by $26,051 and Lottery Funds expenditure limitation by $2,131.

The Subcommittee approved Package 802, Vacant Position Savings. This package eliminates primarily long-term vacant positions that have been
reviewed and determined to not be critical for supporting the agency’s core programs. The package reduces General Fund by $22,977, Other
Funds expenditure limitation by $737,175, and Federal Funds expenditure limitation by $796,922, and eliminates 26 positions (15.11 FTE).

The Subcommittee approved Package 810, LFO Analyst Adjustments. This package shifts support for native fish conservation, research and
monitoring activities from General Fund to Measure 76 dedicated Lottery Funds as part of the Co-Chairs’ budget plan. The package reduces
General Fund by $2,735,599 and increases Lottery Funds expenditure limitation by $2,735,599.

The Subcommittee approved Package 811, Position Alignment Actions. This adjustment combines six part-time seasonal positions into three
part-time seasonal positions. The package eliminates three positions (0.00 FTE).

The Subcommittee approved Package 812: Technical Adjustments. This package adds Other Funds expenditure limitation for funding the
department has received commitments for after the Agency Request Budget was complete. Funding has been received for a bull trout study
($261,754), Lahontan Cutthroat Trout Study ($168,870), Hydroelectric reauthorization ($975,330), and Portland Harbor Cleanup Assessments
($162,019). The Subcommittee approved this package on a one-time basis, to be phased out in 2013-15 budget development. The package increases
Other Funds expenditure limitation by $1,212,784 and Federal Funds expenditure limitation by $337,189 and establishes 10 limited-duration positions
(3.00 FTE).

The Subcommittee approved Package 819, Supplemental Statewide Ending Balance. This package includes, per the Co-Chairs’ budget plan, a
supplemental statewide ending balance hold back adjustment. The result is about a 3.5 percent across-the-board reduction to an agency’s total
biennial General Fund and/or Lottery Funds budget or approximately 7 percent to be taken from the second year of the budget. The package
reduces General Fund by $12,220 and Lottery Funds expenditure limitation by $124,280.




                                                                                                                                            SB 5513-A
                                                                                                                                           Page 7 of 18
Fish Division – Marine Resources
The Marine Resources program manages marine fish and shellfish through inventories of marine fish, shellfish, and their habitats, collection of
biological information from commercial and sport fisheries, implementation of federal and state fishery rules, and protection of marine and
estuarine habitat. The Subcommittee approved a total funds budget of $17,400,114 and 93.38 FTE.

The Subcommittee approved Package 086 and Package 087 which eliminate most inflation and decrease projected personal services costs by 5.5
percent.

The Subcommittee approved Package 090, Analyst Adjustments. This package reduces General Fund and position authority, that is later restored with
Other Funds expenditure limitation in Package 092. The package reduces General Fund by $694,593 and eliminates four positions (4.82 FTE).

The Subcommittee approved Package 092, Fund Shifts/Sweeps. This package provides Other Funds expenditure limitation and position authority to
restore reductions made in Package 090 by using Commercial Fish Fund and license revenues. The package increases Other Funds expenditure
limitation by $694,593 and establishes four positions (4.82 FTE).

The Subcommittee approved Package 120, Marine Fisheries Logbook Evaluation. This package provides Other Funds expenditure limitation and
position authority to convert two limited-duration positions to permanent seasonal status (1.00 FTE) to enter and process data from commercial
fishing vessel logbooks. The information is used in fisheries management, stock assessment, and research. Funding is from the Commercial Fish
Fund. The package increases Other Funds expenditure limitation by $119,356.

The Subcommittee approved Package 146, Avian Predation – Research, Monitoring, and Evaluation. This package provides Other Funds expenditure
limitation and position authority to convert one limited-duration position to permanent, full-time status (1.00 FTE) to continue overseeing
development and implementation of management strategies to reduce impacts of avian predation on salmonids in the Lower Columbia River system.
The position also represents the agency in its interactions with other groups on the impacts of avian predation on salmonids. Funding is split between
the Commercial Fish Fund and license fees. The package increases Other Funds expenditure limitation by $253,020.

The Subcommittee approved Package 155, This package provides funding and position authority to establish one limited-duration, full-time position
(1.00 FTE), continue five limited-duration, full-time positions (5.00 FTE), and continue one limited-duration, part-time position (0.50 FTE). These
positions will implement the Oregon Nearshore Strategy, marine reserves, and other marine spatial planning activities. The package increases Lottery
Funds expenditure limitation by $1,144,004 and Other Funds expenditure limitation by $500,000.

The Subcommittee approved Package 801, Targeted Statewide Adjustments. This package implements a statewide reduction action included in
the Co-Chairs’ Budget, which is a 6.5 percent reduction from total General Fund and Lottery Funds Services and Supplies expenditures included
in the Governor’s Recommended Budget. This is in addition to Package 086, which eliminates most Services and Supplies inflation originally
built into the budget. This package reduces General Fund by $8,803 and Lottery Funds expenditure limitation by $26,191.



                                                                                                                                             SB 5513-A
                                                                                                                                            Page 8 of 18
The Subcommittee approved Package 802, Vacant Position Savings. This package eliminates primarily long-term vacant positions that have been
reviewed and determined to not be critical for supporting the agency’s core programs. The package reduces Other Funds expenditure limitation
by $18,238 and eliminates 1 position (0.20 FTE).

The Subcommittee approved Package 819, Supplemental Statewide Ending Balance. This package includes, per the Co-Chairs’ budget plan, a
supplemental statewide ending balance hold back adjustment. The result is about a 3.5 percent across-the-board reduction to an agency’s total
biennial General Fund and/or Lottery Funds budget or approximately 7 percent to be taken from the second year of the budget. The package
reduces General Fund by $16,543 and Lottery Funds expenditure limitation by $39,743.

Fish Division – Interjurisdictional Fisheries
This program is responsible for participation in regional and international management councils for the management of marine and migratory
fishes, management of Columbia River anadromous fisheries, statewide salmon and sturgeon fisheries, and coordination of Columbia Basin
issues. This program also includes the positions and budget for Fish Division and Regional administration. The Subcommittee approved a total
funds budget of $18,664,812 and 95.33 FTE.

The Subcommittee approved Package 086 and Package 087 which eliminate most inflation and decrease projected personal services costs by 5.5
percent.

The Subcommittee approved Package 802, Vacant Position Savings. This package eliminates primarily long-term vacant positions that have been
reviewed and determined to not be critical for supporting the agency’s core programs. The package reduces Other Funds expenditure limitation
by $89,346 and Federal Funds expenditure limitation by $897,306 and eliminates 14 positions (9.30 FTE).

Wildlife Division – Wildlife Management
The Wildlife Management program inventories game species, controls wildlife damage, develops harvest regulations, manages waterfowl and
upland bird hunter access, and researches game species. The Subcommittee approved a total funds budget of $45,747,519 and 156.03 FTE.

The Subcommittee approved Package 086 and Package 087 which eliminate most inflation and decrease projected personal services costs by 5.5
percent.

The Subcommittee approved Package 111, Migratory Waterfowl/Upland Bird Limitation. This package increases Other Funds expenditure limitation
for the Migratory Waterfowl and Upland Bird subaccounts and for fee pheasant permit sales to be consistent with increased revenue resulting from fee
increases beginning with the 2010 license year. Increased fuel cost is a major reason for the need for increased limitation. The three accounts are
dedicated Other Funds accounts. The package increases Other Funds expenditure limitation by $506,000.

The Subcommittee approved Package 112, Access and Habitat/Pittman-Robertson Funds – Limitation Increase. This package increases Other Funds
expenditure limitation in the Access and Habitat Program and makes a one-time increase in Federal Funds expenditure limitation for additional federal
match from the Pittman-Robertson Wildlife Restoration Act. Revenue in the Access and Habitat Subaccount supports this limitation increase. In 2009,
                                                                                                                                           SB 5513-A
                                                                                                                                          Page 9 of 18
the Legislature increased the surcharge in hunting fees that is dedicated to the Access and Habitat Program. The package increases Other Funds
expenditure limitation by $436,000 and Federal Funds expenditure limitation by $3,200,000.

The Subcommittee approved Package 116, Voluntary Public Access – Habitat Incentive. This package provides $2,303,448 Federal Funds
expenditure limitation to increase public hunting access to private land and to improve wildlife habitat on private land by providing financial
incentives to landowners. The agency expects the package to result in 100 to 125 additional landowners enrolled in the Access and Habitat Program,
about 200,000 additional acres of private land available to hunters, and about 3,000 additional acres of wildlife habitat improved. Funding is from a
grant from the USDA Farm Service Agency’s Voluntary Public Access and Habitat Incentive Program. The agency has received a grant award of $0.8
million and anticipates receiving an additional $1.5 million in grants under this program during the 2011-13 biennium. The Subcommittee approved
this package on a one-time basis, to be phased out during 2013-15 budget development.

The Subcommittee approved Package 136, Wildlife Area Parking Permit Limitation. This package increases Other Funds expenditure limitation by
$100,000 to allow the agency to expand its current Sauvie Island Wildlife Area Parking Permit program to each of its 16 wildlife areas in Oregon. A
$20 annual permit or a $5 daily permit would be required for each vehicle; hunters would receive an annual permit at no additional cost as part of their
initial license purchase.

The Subcommittee approved Package 145, Predator Control – Wildlife Services. This package provides funding to restore cuts to payments to the
U.S. Department of Agriculture Wildlife Service for the predator control program. The cuts were made in the 2009 legislative session. This package
accompanies a similar package in the Oregon Department of Agriculture. This package increases General Fund by $250,000.

The Subcommittee approved Package 801, Targeted Statewide Adjustments. This package implements a statewide reduction action included in
the Co-Chairs’ Budget, which is a 6.5 percent reduction from total General Fund and Lottery Funds Services and Supplies expenditures included
in the Governor’s Recommended Budget. This is in addition to Package 086, which eliminates most Services and Supplies inflation originally
built into the budget. This package reduces General Fund by $33,423.

The Subcommittee approved Package 802, Vacant Position Savings. This package eliminates primarily long-term vacant positions that have been
reviewed and determined to not be critical for supporting the agency’s core programs. The package reduces Other Funds expenditure limitation
by $50,697 and Federal Funds expenditure limitation by $30,102 and eliminates 3 positions (0.88 FTE).

The Subcommittee approved Package 810, LFO Analyst Adjustments. This package adds $260,000 Other Funds expenditure limitation and two
limited-duration positions (2.00 FTE) to work with the U.S. Department of Agriculture Natural Resources Conservation Service to enhance sage-
grouse habitat and implement the sage-grouse initiative. Last year the U.S. Fish and Wildlife Service determined sage-grouse were a candidate
for listing under the Endangered Species Act. The Subcommittee approved the package on a one-time basis, to be phased out during 2013-15
budget development.

The Subcommittee approved Package 811, Position Alignment Actions. This adjustment combines two part-time seasonal positions into one part-
time seasonal position. The package eliminates one position (0.00 FTE).
                                                                                                                                              SB 5513-A
                                                                                                                                            Page 10 of 18
The Subcommittee approved Package 819, Supplemental Statewide Ending Balance. This package includes, per the Co-Chairs’ budget plan, a
supplemental statewide ending balance hold back adjustment. The result is about a 3.5 percent across-the-board reduction to an agency’s total
biennial General Fund and/or Lottery Funds budget or approximately 7 percent to be taken from the second year of the budget. The package
reduces General Fund by $16,486.

Wildlife Division – Habitat Resources
The Habitat Resources program develops a variety of projects to maintain, restore and improve wildlife habitat on public and private land. Projects
that improve habitat include cover planting, wildlife food crops, range rehabilitation, protective fencing, water developments, and artificial nesting
sites. In addition, the program mitigates hydropower effects on wildlife. The Subcommittee approved a total funds budget of $11,075,041 and 44.29
FTE.

The Subcommittee approved Package 070, Revenue Shortfalls. This package reduces total Lottery Funds expenditure limitation by $1,032,942 and
eliminates nine positions (6.87 FTE) due to a projected decline in Measure 76 dedicated Lottery Funds revenue.

The Subcommittee approved Package 086 and Package 087 which eliminate most inflation and decrease projected personal services costs by 5.5
percent.

The Subcommittee approved Package 090, Analyst Adjustments. This package shifts some position expenditures from General Fund to Other Funds
from licenses. This package also restores some of the Lottery Funds and associated position authority removed in Package 070 with savings gained
from Package 086 and 087. The package reduces General Fund by $279,899, increases Lottery Funds expenditure limitation by $54,991 and Other
Funds expenditure limitation by $1,032,942, and establishes six positions (5.63 FTE).

The Subcommittee approved Package 092, Fund Shifts/Sweeps. This package increases Other Funds expenditure limitation by $279,899 and restores
four positions (3.53 FTE) removed in Package 090 using revenues from licenses. It does not restore staff to the Western Oregon Stream Restoration
Plan.

The Subcommittee approved Package 151, Electric Transmission Project Coordination. This package increases Other Funds expenditure limitation by
$810,000 and establishes two limited-duration, full-time positions (2.00 FTE) to work directly on and to coordinate the Oregon and federal siting
processes for two proposed electricity transmission lines. These siting processes are projected to take about three years and require agency input
across multiple fish and wildlife districts and agency coordination with other agencies and organizations. Funding for the positions comes equally
from Portland General Electric and the Idaho Power Company. The Subcommittee approved the package on a one-time basis, to be phased out during
2013-15 budget development.

The Subcommittee approved Package 801, Targeted Statewide Adjustments. This package implements a statewide reduction action included in
the Co-Chairs’ Budget, which is a 6.5 percent reduction from total General Fund and Lottery Funds Services and Supplies expenditures included
in the Governor’s Recommended Budget. This is in addition to Package 086, which eliminates most Services and Supplies inflation originally
built into the budget. This package reduces General Fund by $1,041.
                                                                                                                                            SB 5513-A
                                                                                                                                          Page 11 of 18
The Subcommittee approved Package 802, Vacant Position Savings. This package eliminates primarily long-term vacant positions that have been
reviewed and determined to not be critical for supporting the agency’s core programs. The package reduces Other Funds expenditure limitation
by $119,471 and Federal Funds expenditure limitation by $139,125 and eliminates two positions (2.00 FTE).

The Subcommittee approved Package 810, LFO Analyst Adjustments. This package shifts partial support for the Western Oregon Stream
Restoration Program from General Fund to Measure 76 dedicated Lottery Funds as part of the Co-Chairs’ budget plan. Includes correction to add
Federal Funds for position associated with the Conservation Strategy. The package reduces General Fund by $284,112 and increases Lottery
Funds expenditure limitation by $284,112 and Federal Funds expenditure limitation by $93,943.

The Subcommittee approved Package 819, Supplemental Statewide Ending Balance. This package includes, per the Co-Chairs’ budget plan, a
supplemental statewide ending balance hold back adjustment. The result is about a 3.5 percent across-the-board reduction to an agency’s total
biennial General Fund and/or Lottery Funds budget or approximately 7 percent to be taken from the second year of the budget. The package
reduces General Fund by $13,288 and Lottery Funds expenditure limitation by $9,870.

Wildlife Division – Conservation
This program maintains Oregon’s wildlife diversity by protecting and enhancing populations and habitats of native wildlife at self-sustaining
levels throughout natural geographic ranges. The Subcommittee approved a total funds budget of $5,023,005 and 19.86 FTE.

The Subcommittee approved Package 086 and Package 087 which eliminate most inflation and decrease projected personal services costs by 5.5
percent.

The Subcommittee approved Package 090, Analyst Adjustments. This package originally reduced Services and Supplies – primarily for travel,
training, field supplies, and equipment purchases – for the Oregon Conservation Strategy. It also reduced staffing for grassland bird surveys,
eliminating the agency’s ability to implement habitat projects and surveys for grassland birds in the Willamette Valley. The package was necessary to
achieve the agency’s required reduction in General Fund. In its final version, this package shifts Oregon Conservation Strategy funding for Personal
Services to Lottery Funds, adds Services and Supplies, and adds Federal Funds special payments. The package reduces General Fund by $53,093 and
increases Federal Funds expenditure limitation by $1,567,125.

The Subcommittee approved Package 135, Aquatic Invasive Species Program. This package increases Other Funds expenditure limitation by
$750,757 and continues 11 limited-duration positions (6.36 FTE). Other Funding is from obligated Oregon State Marine Board funds. The
Subcommittee approved this package on a one-time basis, to be phased out during 2013-15 budget development.

The Subcommittee approved Package 137, Habitat Conservation Stamp. This package increases Other Funds expenditure limitation by $50,000
for revenues to be received from the sale of habitat conservation stamps.



                                                                                                                                            SB 5513-A
                                                                                                                                          Page 12 of 18
The Subcommittee approved Package 801, Targeted Statewide Adjustments. This package implements a statewide reduction action included in
the Co-Chairs’ Budget, which is a 6.5 percent reduction from total General Fund and Lottery Funds Services and Supplies expenditures included
in the Governor’s Recommended Budget. This is in addition to Package 086, which eliminates most Services and Supplies inflation originally
built into the budget. This package reduces Lottery Funds expenditure limitation by $24,666.

The Subcommittee approved Package 810, LFO Analyst Adjustments. This package removes $1,567,125 enhancement to the wildlife
conservation strategy program. It removes all General Fund in the program ($1,081,165) and replaces it with Measure 76 dedicated Lottery
Funds. It removes the remaining $485,960 Lottery Funds from the Governor’s recommended enhancement as part of the Co-Chairs’ budget plan.
It also moves Federal Funds expenditures from Special Payments to Personal Services.

The Subcommittee approved Package 819, Supplemental Statewide Ending Balance. This package includes, per the Co-Chairs’ budget plan, a
supplemental statewide ending balance hold back adjustment. The result is about a 3.5 percent across-the-board reduction to an agency’s total
biennial General Fund and/or Lottery Funds budget or approximately 7 percent to be taken from the second year of the budget. The package
reduces Lottery Funds expenditure limitation by $37,560.

State Police Enforcement
This program, provided by contract with the Department of State Police (OSP), assures compliance with laws that protect and enhance the long-term
health and equitable utilization of fish and wildlife resources. The Subcommittee approved a total funds budget of $21,275,954 and no FTE. All
positions are at OSP.

The Subcommittee approved Package 090, Analyst Adjustments. This package reduces the Other Funds expenditure limitation by $1,048,070 to
reflect a reduced special payment to the Department of State Police to match OSP’s reduced inter-agency transfer in from ODFW resulting from
standard budget reduction packages.

The Subcommittee approved Package 100, Department of State Police – Reclass Request. This package increases Other Funds expenditure limitation
by $72,955 to reclassify an existing OSP Fish and Wildlife Division trooper position to the classification of sergeant. The sergeant position will
supervise and oversee pilots and aircraft assigned to the statewide Aircraft Program. The agency expects this package to reduce risk related to the
Aircraft Program and to improve the ability of OSP to enforce fish and wildlife laws. Funding is from license fees.

Administration Division
The Administration Division provides accounting, budgeting, license and tag sales, personnel management, information systems, and information and
education services for the Department. It includes the Director’s Office. The Subcommittee approved a total funds budget of $41,831,738 and 128.64
FTE.

The Subcommittee approved Package 086 and Package 087, which eliminate most inflation and decrease projected personal services costs by 5.5
percent.


                                                                                                                                          SB 5513-A
                                                                                                                                        Page 13 of 18
The Subcommittee approved Package 090, Analyst Adjustments. This package increases General Fund by $53,093 and Lottery Funds expenditure
limitation by $90,653 for Personal Services as part of the adjustments to align with the Natural Resources Workgroup budget plan.

The Subcommittee approved Package 113, Marketing Initiatives. This package increases Other Funds expenditure limitation by $190,400 and
establishes one permanent, full-time position (1.00 FTE). The position was formerly a limited-duration position established in the 2007-09 budget to
assist in marketing angling and hunting opportunities. This package also provides additional funds to increase marketing efforts with the goal of
increasing license sales and participation in agency programs and activities. Funding for the package is from license fees.

The Subcommittee approved Package 114, Limitation for Grants and Donations. This package increases Other Funds expenditure limitation by
$100,000 to allow the agency to use grants, sponsorships, and other outside funding in support of agency marketing, outreach, and education efforts.
The Information and Education Division has applied for and received several small grants. It has also solicited donations, marketed products, and
sought other outside funding to support outreach and education efforts. This package allows the agency to use those outside funds without shifting
expenditure limitation from other budgets.

The Subcommittee approved Package 115, Final Phase – Migrate Critical Info Systems. This package increases Other Funds expenditure limitation by
$191,183 and establishes one limited-duration, full-time position (1.00 FTE) to move at least 16 of the agency’s essential computer-based business
systems from an outdated computer system to a computer system using current technology and programming language. This package will allow the
move to be complete by the end of 2013. Funding for the package is from license fees. The Subcommittee approved this package on a one-time basis,
to be phased out during 2013-15 budget development.

The Subcommittee approved Package 131, Contract Specialist Workload – LD to Permanent. This package increases Other Funds expenditure
limitation by $161,400 and establishes one permanent, full-time position (1.00 FTE) to replace a limited-duration position. The position will allow the
Contract Services section to apply for and receive grants at the increased level experienced recently and expected for the foreseeable future without
shifting contracts work onto other staff. Funding for the position is from Other Funds originating as the administrative overhead portion of federal
grant funds.

The Subcommittee approved Package 133, Human Resources Analyst – LD. This package increases Other Funds expenditure limitation by $170,778
and establishes one limited-duration, full-time position (1.00 FTE) to more quickly and effectively open and fill the agency’s recruitment and job
rotation opportunities. Funding for the position is from Other Funds originating as the administrative overhead portion of federal grant funds.

The Subcommittee approved Package 160, Agency Program Network Support – LD to Permanent. This package increases Other Funds expenditure
limitation by $152,145 and establishes one permanent, full-time position (1.00 FTE) to support the agency’s computer programs and systems at their
current level.

The Subcommittee approved Package 161, Fiscal Workload and Integrity – LD Continued. This package increases Other Funds expenditure limitation
by $140,020 and establishes one limited-duration, full-time position (1.00 FTE) in the 2011-13 biennium to continue projects that increase agency


                                                                                                                                             SB 5513-A
                                                                                                                                           Page 14 of 18
efficiency and strengthen internal controls. Funding is from license fees. The Subcommittee approved this package on a one-time basis, to be phased
out during 2013-15 budget development.

The Subcommittee approved Package 175, Department of Justice Billing Pilot. This package increases Other Funds expenditure limitation by
$224,324 to reflect historical trends in Attorney General costs. The Services and Supplies line item for Attorney General expenses has been
historically underfunded and the agency has had to use other Services and Supplies line items to cover Attorney General costs in the past. Funding is
from license fees.

The Subcommittee approved Package 801, Targeted Statewide Adjustments. This package implements a statewide reduction action included in
the Co-Chairs’ Budget, which is a 6.5 percent reduction from total General Fund and Lottery Funds Services and Supplies expenditures included
in the Governor’s Recommended Budget. This is in addition to Package 086, which eliminates most Services and Supplies inflation originally
built into the budget. This package reduces General Fund by $29,470.

The Subcommittee approved Package 802, Vacant Position Savings. This package eliminates primarily long-term vacant positions that have been
reviewed and determined to not be critical for supporting the agency’s core programs. The package reduces Other Funds expenditure limitation
by $41,285 and eliminates 1 position (0.43 FTE).

The Subcommittee approved Package 810: LFO Analyst Adjustments. This package shifts $600,000 in the Services and Supplies category on a
one-time basis from General Fund to Other Funds expenditure limitation from administrative indirect charges on new Federal Funds and Other
Funds contracts. It also shifts $90,653 in the Personal Services category from Measure 76 dedicated Lottery Funds expenditure limitation back to
Federal Funds expenditure limitation for a position in Administration that works on the Conservation Strategy. The two shifts reflect the agency’s
significant new Federal Funds and Other Funds revenues for work to be conducted on behalf of other entities. This package uses administrative
revenues from indirect charges to backfill agency administrative expenses. The Subcommittee approved this package on a one-time basis, to be
phased out during 2013-15 budget development.

The Subcommittee approved Package 812, Technical Adjustments. This package increases Other Funds expenditure limitation by $300,000 for
contracts associated with planning and project oversight for locating a site and designing a new headquarters building in Salem.

The Subcommittee approved Package 819, Supplemental Statewide Ending Balance. This package includes, per the Co-Chairs’ budget plan, a
supplemental statewide ending balance hold back adjustment. The result is about a 3.5 percent across-the-board reduction to an agency’s total
biennial General Fund and/or Lottery Funds budget or approximately 7 percent to be taken from the second year of the budget. The package
reduces General Fund by $23,066.

Debt Service
This program repays monies borrowed for deferred maintenance projects, such as maintenance of Wildlife Area field offices, hatchery facilities and
residences, and other properties owned by the Department. The Subcommittee approved a budget of $338,094 General Fund.


                                                                                                                                             SB 5513-A
                                                                                                                                           Page 15 of 18
The Subcommittee approved Package 819, Supplemental Statewide Ending Balance. This package includes, per the Co-Chairs’ budget plan, a
supplemental statewide ending balance hold back adjustment. The result is about a 3.5 percent across-the-board reduction to an agency’s total
biennial General Fund and/or Lottery Funds budget or approximately 7 percent to be taken from the second year of the budget. The package
reduces General Fund by $12,168.

Capital Improvement
This program funds projects that restore fisheries, such as diking, nesting, water control, installation of bird netting, enlargement of release
channels, road repair, and repairs to intakes and pond bottoms. The Subcommittee approved a total funds budget of $7,853,916 and 2.00 FTE.

The Subcommittee approved Package 086 and Package 087, which eliminate most inflation and decrease projected personal services costs by 5.5
percent.

The Subcommittee approved Package 165, Marine Program Building Purchase in Newport. This package increases Other Funds expenditure
limitation on a one-time basis by $600,000 to purchase the agency’s currently leased building in Newport. Purchase of the building will help alleviate
crowding at the Marine Resources Program, which is located on the campus of Oregon State University’s Hatfield Marine Science Center in Newport.
Funds for the purchase are from three sources: Marine Reserves donations and grants, the recreational shellfish fund, and the Commercial Fish Fund.

The Subcommittee approved Package 167, Clackamas Hatchery Intake. This package increases Other Funds expenditure limitation on a one-time
basis by $750,000 to design and construct an improved water intake and water delivery system for the agency’s Clackamas Fish Hatchery. Funding is
from Portland General Electric (PGE) as a condition of the relicensing Settlement Agreement for PGE’s Federal Energy Regulatory Commission
Hydroelectric License for the PGE Clackamas Hydroelectric Project.

The Subcommittee approved Package 801, Targeted Statewide Adjustments. This package implements a statewide reduction action included in
the Co-Chairs’ Budget, which is a 6.5 percent reduction from total General Fund and Lottery Funds Services and Supplies expenditures included
in the Governor’s Recommended Budget. This is in addition to Package 086, which eliminates most Services and Supplies inflation originally
built into the budget. This package reduces General Fund by $10,241.

The Subcommittee approved Package 810, LFO Analyst Adjustments. This package adds $120,000 Other Funds expenditure limitation for
monies the Department received to upgrade the fish ladder at Steamboat Creek. About once every three years the ladder becomes inoperable due
to silt and debris due to its remote location. The Subcommittee approved this package on a one-time basis, to be phased out during 2013-15 budget
development.

The Subcommittee approved Package 819, Supplemental Statewide Ending Balance. This package includes, per the Co-Chairs’ budget plan, a
supplemental statewide ending balance hold back adjustment. The result is about a 3.5 percent across-the-board reduction to an agency’s total
biennial General Fund and/or Lottery Funds budget or approximately 7 percent to be taken from the second year of the budget. The package
reduces General Fund by $5,118.


                                                                                                                                            SB 5513-A
                                                                                                                                          Page 16 of 18
Capital Construction
The Subcommittee reviewed and approved three Capital Construction packages. Expenditure limitation for Capital Construction projects will be
included in House Bill 5006, the statewide capital construction bill. Bonding authority for Package 170 will be included in House Bill 5005, the
statewide bonding bill. The packages are:

   •   Package 170, Building and Land Purchases. This package provides $16,000,000 Other Funds capital construction expenditure limitation
       for the purchase and renovation of a building to house the agency’s headquarters staff. The lease of the agency’s current building will end
       within three years. The agency will be able to save money in the long run by purchasing its own building. The bonds will be repaid using
       Other Funds from license and tag revenues. Debt service on the bonds for the 2011-13 biennium is included in the amount being
       borrowed.

   •   Package 171, Sandy Hatchery Fish Passage. This package provides $3,700,000 Other Funds capital construction expenditure limitation to
       provide fish passage around the Sandy Hatchery dam in order to comply with state and federal law. The passage will restore anadromous
       fish to their historical range. Funding is from the City of Portland.

   •   Package 810, LFO Analyst Adjustments. This package recommends capital construction expenditure authority in House Bill 5006 for two
       projects that will occur during the 2011-13 biennium and that, due to their nature, should be categorized as capital construction
       expenditures. Both projects will be paid for in full with no money being borrowed or debt incurred. The two projects are:

           o Rock Creek Fish Passage – The purpose of this project is to improve fish passage to Rock Creek, a major tributary of the North
             Umpqua River. In 1949, a diversion dam and intake facility was constructed at the Rock Creek Fish Hatchery to supply water for
             the hatchery. A fish ladder constructed at the dam is a partial barrier to salmon, steelhead, and trout habitat at certain flows and
             needs to be improved. Due to design changes and time constraints, the project has been forced into a second in-water work period,
             resulting in the cost of the project increasing. ODFW needs Capital Construction limitation of $1,500,000 to complete the project.

           o Ruby Pipeline Mitigation – As part of the Ruby Pipeline Mitigation agreement, ODFW was provided $2,000,000 to acquire real
             property for wildlife habitat. Acquisition of real property that provides wildlife habitat and public access to fish and wildlife in
             southeast Oregon is a part of the contract with Ruby Pipeline LLC to partially mitigate impacts to fish and wildlife habitat due to
             construction of their pipeline. ODFW has received these funds from Ruby Pipeline LLD. The funding is expected to be adequate
             to acquire up to 1,070 acres of upland and riparian habitat in southeast Oregon.

The recommended budget for this agency includes a reduction of General and Lottery Funds for a supplemental ending balance. The reduction is
intended to be applied against spending levels in the second year of the biennium and to not affect program delivery in the first year. To reinforce
that intent, the agency’s budget bill includes specific language allowing the agency to expend up to 54 percent of its total biennial General Fund
appropriation in the first year of the biennium.



                                                                                                                                          SB 5513-A
                                                                                                                                        Page 17 of 18
The amount of the reduction for the supplemental ending balance may be restored during the February 2012 session to the agency for the second
year of the biennium depending on economic conditions. Therefore, the Co-Chairs of the Joint Committee on Ways and Means expect the
agency director to closely monitor the quarterly revenue forecast and other economic indicators to gauge adequacy of funding in the second year
and manage the budget accordingly.

2009-11 Expenditure Limitation Adjustments
The Subcommittee approved three changes to the Department’s 2009-11 biennium budget:

   •   Fish Division – Fish Propagation. Increase Federal Funds expenditure limitation in Fish Propagation by $1,350,000. The U.S. Army Corps
       of Engineers has increased the operating budgets for fish hatcheries by approximately $850,000 over the past two years. These hatcheries
       are for mitigation caused by the operations of dams owned by the Corps. This increased funding was not anticipated in the Department’s
       2009-11 budget.

   •   Wildlife Division – Wildlife Habitat. Increase Federal Funds expenditure limitation in Wildlife Habitat by $400,000. The Wildlife
       Restoration, Pittman-Robertson Program (PR) purpose is to restore, conserve, manage, and enhance wild birds and mammals and their
       habitats; provide public use to wildlife resources; and educate hunters. Revenue is obtained from federal excise taxes on sporting arms and
       ammunition and apportioned to states using a formula based on the number of licensed hunters and land area. A recent increase in
       apportionment of federal PR dollars to Oregon, based on increased sales of sporting arms and ammunition nationwide, gave ODFW the
       opportunity to fund new projects. The required state match will come from existing license funds. New projects include on-the-ground
       habitat projects to support the Mule Deer Initiative, a pilot black-tailed deer research project, and enhanced big game surveys.

   •   Wildlife Division – Wildlife Diversity. Increase Other Funds expenditure limitation in Wildlife Diversity by $100,000. The 2009
       Legislature established the Aquatic Invasive Species program funded from new revenues managed by the Oregon State Marine Board
       (OSMB). However, the program was only funded for one year, due to the uncertainty of the new revenues, and this funding has been
       spent. The 2011 boating season unofficially begins Memorial Day weekend. Both ODFW and OSMB desire to have the program
       operational by then, however ODFW does not have enough Other Funds expenditure limitation in the program to accommodate the
       increased workload. OSMB has received enough revenue ($100,000) to fund ODFW operations for this additional time. This request
       includes authority to hire 8 limited-duration positions for a total of 12 months (0.50 FTE).


Summary of Performance Measure Action
See attached Legislatively Adopted 2011-13 Key Performance Measures form.




                                                                                                                                        SB 5513-A
                                                                                                                                      Page 18 of 18
DETAIL OF JOINT COMMITTEE ON WAYS AND MEANS ACTION                                                                                                                               SB 5513-A
Oregon Department of Fish and Wildlife
Art Ayre -- (503) 378-3108
                                                                                                    OTHER FUNDS                FEDERAL FUNDS            TOTAL
                                                                 GENERAL        LOTTERY                                                                  ALL
                         DESCRIPTION                              FUND           FUNDS        LIMITED        NONLIMITED    LIMITED        NONLIMITED    FUNDS          POS            FTE



2009-11 Legislatively Approved Budget at March 2011 *            $13,284,543    $6,105,448   $152,995,223            $0    $96,456,507           $0    $268,841,721    1,379         1,162.20

2011-13 ORBITS printed Current Service Level (CSL)*              $14,813,311    $6,574,180   $163,908,277            $0    $98,718,380           $0    $284,014,148    1,344         1,141.76

2011-13 Governor's Recommended Budget *                          $12,134,244    $3,645,741   $172,755,717            $0   $112,976,592           $0    $301,512,294    1,493         1,239.24

SUBCOMMITTEE ADJUSTMENTS (from GRB)

Propagation - 010-01

Package 801: Targeted Statewide Adjustments
  Services and Supplies: 6.5% reduction                              (68,100)           0               0             0              0            0         (68,100)         0           0.00

Package 802: Vacant Position Savings
  Personal Services                                                  (61,288)           0        (442,729)            0       (467,533)           0        (971,550)     (16)           (8.60)

Package 811: Position Alignment Actions
  Personal Services                                                        0            0               0             0              0            0               0       (1)            0.00

Package 819: Supplemental Statewide Ending Balance
  Personal Services                                                  (96,500)           0               0             0              0            0         (96,500)         0           0.00
  Services and Supplies                                              (35,204)           0               0             0              0            0         (35,204)
  Capital Outlay                                                        (922)           0               0             0              0            0            (922)

Natural Production - 010-02

Package 090: Analyst Adjustments
  Personal Services                                                        0            0      (2,773,258)            0       194,981             0      (2,578,277)      (1)           (1.00)
  Services and Supplies                                                    0            0          50,089             0        50,089             0         100,178

Package 123: John Day Adult Spring Chinook Monitoring
  Personal Services                                                        0            0        158,649              0       (158,076)           0             573          0           0.00
  Services and Supplies                                                    0            0         13,700              0        (13,700)           0               0

Package 125: NE Steelhead & Chinook Monitoring (one-time)
  Personal Services                                                        0            0               0             0       404,971             0        404,971           4           4.00
  Services and Supplies                                                    0            0               0             0       139,029             0        139,029

Package 126: Lower Columbia Chum Monitoring (one-time)
  Personal Services                                                        0            0        417,329              0     (1,053,040)           0        (635,711)         0           0.00
  Services and Supplies                                                    0            0        218,382              0       (218,382)           0               0


Package 127: Lower Columbia Fish Habitat Monitoring (one-time)
  Personal Services                                                        0            0        362,452              0       (500,000)           0        (137,548)         6           3.00



                                                                                                   1                                                                     SB 5513-A
                                                                                                OTHER FUNDS              FEDERAL FUNDS           TOTAL
                                                               GENERAL       LOTTERY                                                              ALL
                          DESCRIPTION                           FUND          FUNDS        LIMITED       NONLIMITED   LIMITED       NONLIMITED   FUNDS         POS           FTE

  Services and Supplies                                                 0             0       137,548             0             0           0      137,548

Package 128: Lower Columbia Adult Steelhead Monitoring (one-
time)
   Personal Services                                                    0             0       755,071             0             0           0      755,071       12            6.14
   Services and Supplies                                                0             0       544,929             0             0           0      544,929

Package 130: Salmon River Coho Recovery Research - OWEB
(one-time)
  Personal Services                                                     0             0       274,594             0             0           0      274,594           5         2.42
  Services and Supplies                                                 0             0        61,406             0             0           0       61,406


Package 140: Klamath Restoration - Settlement Implementation
  Personal Services                                                     0             0              0            0     (170,051)           0     (170,051)       (1)         (1.00)

Package 141: Fish Conservation & Recovery Positions
  Personal Services                                                     0             0       434,158             0             0           0      434,158           3         3.00
  Services and Supplies                                                 0             0      (264,408)            0             0           0     (264,408)

Package 176: Federal Revenue as Other Funds
  Personal Services                                                     0             0      (806,459)            0     801,649             0        (4,810)         0         0.00

Package 801: Targeted Statewide Adjustments
  Services and Supplies: 6.5% reduction                          (26,051)        (2,131)             0            0             0           0       (28,182)         0         0.00

Package 802: Vacant Position Savings
  Personal Services                                                    0              0      (737,175)            0     (796,922)           0    (1,534,097)     (26)        (15.11)
  Services and Supplies                                          (22,977)             0             0             0            0            0       (22,977)       0           0.00

Package 810: LFO Analyst Adjustments
  Personal Services                                            (2,735,599)    2,735,599              0            0             0           0             0          0         0.00

Package 811: Package Position Alignment Actions
  Personal Services                                                     0             0              0            0             0           0             0       (3)          0.00

Package 812: Technical Adjustments (one-time)
  Personal Services                                                     0             0        75,435             0     259,308             0       334,743      10            3.00
  Services and Supplies                                                 0             0     1,137,349             0      77,881             0     1,215,230

Package 819: Supplemental Statewide Ending Balance
  Personal Services                                                    0      (124,280)              0            0             0           0     (124,280)          0         0.00
  Services and Supplies                                          (12,220)            0               0            0             0           0      (12,220)

Marine Resources - 010-03

Package 090: Analyst Adjustments
  Personal Services                                                     0     (741,070)              0            0    1,545,971            0      804,901           0         0.00
  Services and Supplies                                                 0     (402,934)              0            0    1,090,029            0      687,095




                                                                                               2                                                                 SB 5513-A
                                                                                          OTHER FUNDS              FEDERAL FUNDS           TOTAL
                                                           GENERAL      LOTTERY                                                             ALL
                               DESCRIPTION                  FUND         FUNDS       LIMITED       NONLIMITED   LIMITED       NONLIMITED   FUNDS        POS           FTE



Package 147: Pinniped Predation - Research, Management &
Monitoring
  Personal Services                                                0            0              0            0     (345,261)           0     (345,261)      (3)         (2.00)

Package 155: Nearshore Marine Management Program
  Personal Services                                                0      750,049             0             0   (1,460,943)           0     (710,894)      (5)         (5.00)
  Services and Supplies                                            0      393,955       500,000             0   (1,090,029)           0     (196,074)

Package 801: Targeted Statewide Adjustments
  Services and Supplies: 6.5% reduction                       (8,803)     (26,191)             0            0             0           0      (34,994)         0         0.00

Package 802: Vacant Position Savings
  Personal Services                                                0            0       (18,238)            0             0           0      (18,238)      (1)         (0.20)

Package 819: Supplemental Statewide Ending Balance
  Personal Services                                          (11,838)     (25,745)             0            0             0           0      (37,583)         0         0.00
  Services and Supplies                                       (4,705)     (13,998)             0            0             0           0      (18,703)

Interjurisdictional - 010-04

Package 802: Vacant Position Savings
  Personal Services                                                0            0       (89,346)            0     (897,306)           0     (986,652)     (14)         (9.30)

Wildlife Management - 020-01

Package 090: Analyst Adjustments
  Services and Supplies                                     (100,000)           0              0            0             0           0     (100,000)

Package 110: Upland Bird Program Seasonal Technicians
  Personal Services                                                0            0      (159,335)            0             0           0     (159,335)      (3)         (1.00)

Package 145: Predator Control - Wildlife Services
  Services and Supplies                                      250,000            0              0            0             0           0      250,000          0         0.00

Package 801: Targeted Statewide Adjustments
  Services and Supplies: 6.5% reduction                      (33,423)           0              0            0             0           0      (33,423)         0         0.00

Package 802: Vacant Position Savings
  Personal Services                                                0            0       (50,697)            0      (30,102)           0      (80,799)      (3) (1)     (0.88)

Package 810: LFO Analyst Adjustments (one-time)
  Personal Services                                                0            0       260,000             0             0           0      260,000          2         2.00

Package 811: Package Position Alignment Actions
  Personal Services                                                0            0              0            0             0           0            0       (1)          0.00

Package 819: Supplemental Statewide Ending Balance
  Personal Services                                           (3,833)           0              0            0             0           0       (3,833)         0         0.00




                                                                                         3                                                                SB 5513-A
                                                                                    OTHER FUNDS              FEDERAL FUNDS           TOTAL
                                                     GENERAL      LOTTERY                                                             ALL
                          DESCRIPTION                 FUND         FUNDS       LIMITED       NONLIMITED   LIMITED       NONLIMITED   FUNDS          POS           FTE

  Services and Supplies                                (12,653)           0              0            0             0           0      (12,653)

Habitat Resources - 020-02

Package 090: Analyst Adjustments
  Personal Services                                          0            0              0            0             0           0              0      10            9.16

Package 092: Fund Shifts/Sweeps
  Services and Supplies                                      0            0              0            0             0           0              0          2         1.88

Package 801: Targeted Statewide Adjustments
  Services and Supplies: 6.5% reduction                 (1,041)           0              0            0             0           0       (1,041)           0         0.00

Package 802: Vacant Position Savings
  Personal Services                                          0            0      (119,471)            0     (139,125)           0     (258,596)       (2) (1)      (2.00)

Package 810: LFO Analyst Adjustments
  Personal Services                                   (282,613)     282,613              0            0      93,943             0       93,943            0         0.00
  Services and Supplies                                 (1,499)       1,499              0            0           0             0            0

Package 819: Supplemental Statewide Ending Balance
  Personal Services                                    (13,288)      (9,870)             0            0             0           0      (23,158)           0         0.00

Conservation - 020-03

Package 176: Federal Revenue as Other Funds
  Personal Services                                          0            0       (14,108)            0      14,024             0            (84)         0         0.00

Package 801: Targeted Statewide Adjustments
  Services and Supplies: 6.5% reduction                      0      (24,666)             0            0             0           0      (24,666)           0         0.00

Package 810: LFO Analyst Adjustments
  Personal Services                                   (701,691)    (712,429)             0            0      870,043            0     (544,077)           0         0.00
  Services and Supplies                               (379,474)     226,469              0            0            0            0     (153,005)           0
  Special Payments Account 6995                              0            0              0            0     (870,043)           0     (870,043)           0         0.00

Package 819: Supplemental Statewide Ending Balance
  Personal Services                                          0      (24,377)             0            0             0           0      (24,377)           0         0.00
  Services and Supplies                                      0      (13,183)             0            0             0           0      (13,183)

State Police Enforcement - 030-00

  None

Administration - 040-00

Package 801: Targeted Statewide Adjustments
  Services and Supplies: 6.5% reduction                (29,470)           0              0            0             0           0      (29,470)           0         0.00




                                                                                   4                                                                  SB 5513-A
                                                                                          OTHER FUNDS                 FEDERAL FUNDS            TOTAL
                                                      GENERAL        LOTTERY                                                                    ALL
                         DESCRIPTION                   FUND           FUNDS         LIMITED        NONLIMITED     LIMITED        NONLIMITED    FUNDS          POS              FTE

Package 802: Vacant Position Savings
  Personal Services                                             0             0         (41,285)            0               0            0         (41,285)      (1) (1)         (0.43)

Package 810: LFO Analyst Adjustments
  Personal Services                                            0        (90,653)             0              0          90,653            0               0          0            0.00
  Services and Supplies                                 (600,000)             0        600,000              0               0            0               0

Package 812: Technical Adjustments
  Services and Supplies                                         0             0        300,000              0               0            0        300,000           0   (1)      0.00

Package 819: Supplemental Statewide Ending Balance
  Personal Services                                        (4,281)            0               0             0               0            0          (4,281)         0            0.00
  Services and Supplies                                   (18,785)            0               0             0               0            0         (18,785)

Debt Service - 050-00

Package 819: Supplemental Statewide Ending Balance
  Debt Service - account 7995                             (12,168)            0               0             0               0            0         (12,168)

Capital Improvement - 088

Package 166: Willamette Falls Fish Ladder Repairs
  Services and Supplies                                         0             0               0             0        (600,000)           0        (600,000)         0            0.00

Package 801: Targeted Statewide Adjustments
  Services and Supplies: 6.5% reduction                   (10,241)            0               0             0               0            0         (10,241)         0            0.00

Package 810: LFO Analyst Adjustments (one-time)
  Capital Outlay                                                0             0        120,000              0               0            0        120,000

Package 819: Supplemental Statewide Ending Balance
  Services and Supplies                                    (5,118)            0               0             0               0            0          (5,118)




TOTAL ADJUSTMENTS                                     ($5,043,785)   $2,178,657       $904,582             $0     ($3,177,942)          $0     ($5,138,488)     (27)            (11.92)



SUBCOMMITTEE RECOMMENDATION *                         $7,090,459     $5,824,398    $173,660,299            $0    $109,798,650           $0    $296,373,806    1,466           1,227.32



% Change from 2009-11 Leg Approved Budget                 -46.63%        -4.60%          13.51%          0.00%         13.83%         0.00%         10.24%     6.31%             5.60%
% Change from 2011-13 Current Service Level               -52.13%       -11.40%           5.95%          0.00%         11.22%         0.00%          4.35%     9.08%             7.49%
% Change from 2011-13 Governor's Recommended Budget       -41.57%        59.76%           0.52%          0.00%         -2.81%         0.00%         -1.70%    -1.81%            -0.96%



* Excludes Capital Construction Expenditures




                                                                                         5                                                                       SB 5513-A
                                                                      OTHER FUNDS              FEDERAL FUNDS           TOTAL
                                             GENERAL   LOTTERY                                                          ALL
                              DESCRIPTION     FUND      FUNDS    LIMITED       NONLIMITED   LIMITED       NONLIMITED   FUNDS        POS           FTE

2009-11 EXPENDITURE LIMITATION ADJUSTMENTS

Fish Propagation - 010-01

  Services and Supplies                            0         0             0            0    1,350,000            0     1,350,000         0         0.00

Wildlife Habitat - 020-02

  Services and Supplies                            0         0             0            0     400,000             0      400,000          0         0.00

Wildlife Diversity - 020-03

  Personal Services                                0         0       34,548             0             0           0       34,548          8         0.50
  Capital Outlay                                   0         0       65,452             0             0           0       65,452          0         0.00



TOTAL ADJUSTMENTS                                  0         0      100,000             0    1,750,000            0     1,850,000         8         0.50




                                                                     6                                                                SB 5513-A
                                                          Legislatively Approved 2011-2013 Key Performance Measures


Agency:      FISH and WILDLIFE, DEPARTMENT of
  Mission:    To protect and enhance Oregon's fish and wildlife and their habitats for use and enjoyment by present and future generations.



                    Legislatively Proposed KPMs                                           Customer Service                   Agency Request   Most Current    Target    Target
                                                                                              Category                                           Result        2012      2013

1 - Hunting License Purchases - Percent of the license buying                                                                  Approved KPM       9.00        10.00      10.00
population with hunting licenses and/or tags
2 - Angling License Purchases - Percent of the license buying                                                                  Approved KPM       19.10       21.40      21.40
population with angling licenses and/or tags.
3 - Oregon Listed Species - Percent of species listed as threatened or                                                         Approved KPM       0.00         2.00       2.00
endangered under the Oregon Endangered Species Act that have been
delisted in the last year.
4 - Coho Hatchery Fish - Percent of hatchery coho surviving from                                                               Approved KPM       4.70         2.70       2.70
smolt to adult.
5 - Commercial Fisheries - Personal income in millions generated                                                               Approved KPM      217.80      234.80     234.80
from commercial fishery landings.
6 - Wildlife Damage - Number of wildlife damage complaints                                                                     Approved KPM     3,977.00     4,310.00   4,310.00
addressed annually.
7 - Oregon Species of Concern - Percent of fish species of concern                                                             Approved KPM       81.00       90.00      90.00
(listed as threatened, endangered, or sensitive) being monitored
8 - Oregon Species of Concern Percent of wildlife species of concern                                                           Approved KPM       45.00       48.00      49.00
(listed as threatened, endangered, or sensitive) being monitored.
9 - Decreasing the Number of Unscreened Water Diversions - Number                                                              Approved KPM     2,057.00     1,856.00   1,781.00
of unscreened priority water diversions.
10 - Customer Service - Percent of customers rating their overall                                                              Approved KPM                   92.00      92.00
satisfaction with the agency above average or excellent. Percent of
customers rating their satisfaction with the agency's customer service
as "good" or "excellent" for timeliness, accuracy, helpfulness,
expertise and availability of information.




 Print Date: 6/2/2011                                                                                                                                                    Page 1 of 3
Agency:      FISH and WILDLIFE, DEPARTMENT of
  Mission:    To protect and enhance Oregon's fish and wildlife and their habitats for use and enjoyment by present and future generations.



                    Legislatively Proposed KPMs                                           Customer Service                   Agency Request   Most Current   Target   Target
                                                                                              Category                                           Result       2012     2013
10 - Customer Service - Percent of customers rating their overall                             Accuracy                         Approved KPM       74.30      92.00    92.00
satisfaction with the agency above average or excellent. Percent of
customers rating their satisfaction with the agency's customer service
as "good" or "excellent" for timeliness, accuracy, helpfulness,
expertise and availability of information.
10 - Customer Service - Percent of customers rating their overall                     Availability of Information              Approved KPM       68.30      92.00    92.00
satisfaction with the agency above average or excellent. Percent of
customers rating their satisfaction with the agency's customer service
as "good" or "excellent" for timeliness, accuracy, helpfulness,
expertise and availability of information.
10 - Customer Service - Percent of customers rating their overall                              Expertise                       Approved KPM       74.90      92.00    92.00
satisfaction with the agency above average or excellent. Percent of
customers rating their satisfaction with the agency's customer service
as "good" or "excellent" for timeliness, accuracy, helpfulness,
expertise and availability of information.
10 - Customer Service - Percent of customers rating their overall                            Helpfulness                       Approved KPM       91.50      92.00    92.00
satisfaction with the agency above average or excellent. Percent of
customers rating their satisfaction with the agency's customer service
as "good" or "excellent" for timeliness, accuracy, helpfulness,
expertise and availability of information.
10 - Customer Service - Percent of customers rating their overall                              Overall                         Approved KPM       72.30      92.00    92.00
satisfaction with the agency above average or excellent. Percent of
customers rating their satisfaction with the agency's customer service
as "good" or "excellent" for timeliness, accuracy, helpfulness,
expertise and availability of information.
10 - Customer Service - Percent of customers rating their overall                             Timeliness                       Approved KPM       74.80      92.00    92.00
satisfaction with the agency above average or excellent. Percent of
customers rating their satisfaction with the agency's customer service
as "good" or "excellent" for timeliness, accuracy, helpfulness,
expertise and availability of information.
11 - Boards and Commissions - Percent of total best practices met by                                                           Approved KPM      100.00      100.00   100.00
the Department of Fish and Wildlife, State Fish and Wildlife
Commission.




 Print Date: 6/2/2011                                                                                                                                                  Page 2 of 3
LFO Recommendation:

Delete KPMs 3, 4, and 5. Develop a better outcome measure of hatchery operations.
Develop two new measures based on your young hunter/angler recruitment efforts similar to the following:
New – Percentage of License Buying Population age 12-21 with hunting licenses and/or tags.New – Percentage of License Buying Population age 14-21 with fishing licenses and/or tags.

Sub-Committee Action:
Approved the LFO recommendations

Print Date: 6/2/2011                                                                                                                                                                   Page 3 of 3