← Find this measure
2011 Regular Session · HB 2352
Introduced — HB 2352 (2011R1)
This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.
Other indexed documents for this measure (2)
- Introduced — HB 2352 (2011R1) · open
- OLIS measure summary
Recorded legislative activity (6)
- First Reading Of House Bills
- First reading. Referred to the desks of the Co-Speakers.
- Referred to Transportation and Economic Development.
- Heard
- Public Hearing held.
- In committee upon adjournment.
Citation and provenance
Oregon Legislature. Introduced — HB 2352 (2011R1). 2011 Regular Session. https://olis.oregonlegislature.gov/liz/2011R1/Downloads/MeasureDocument/HB2352/Introduced Retrieved 2026-09-02.
Document ID: doc_39f77d7f1949d75ab863
Original SHA-256: 56defee7b408b37a45a14312bbd1076b0a07131cb180853cdbf9042621e0b9ad
Extracted text SHA-256: 4638cce3ad2ab548ba53e5af52a73f371a12944d4bd926443b1451efdf44c7c3
76th OREGON LEGISLATIVE ASSEMBLY--2011 Regular Session
House Bill 2352
Ordered printed by the Speaker pursuant to House Rule 12.00A (5). Presession filed (at the request of House In-
terim Committee on Business and Labor)
SUMMARY
The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
to consideration by the Legislative Assembly. It is an editor’s brief statement of the essential features of the
measure as introduced.
Requires city that reduces available prime industrial land within urban growth boundary to re-
place land or mitigate impact so that development capacity to satisfy need for prime industrial land
is not reduced or compromised.
1 A BILL FOR AN ACT
2 Relating to prime industrial land.
3 Be It Enacted by the People of the State of Oregon:
4 SECTION 1. (1) As used in this section:
5 (a) “Prime industrial land” has the meaning given that term by rule of the Land Con-
6 servation and Development Commission.
7 (b) “Serviceable” has the meaning given that term by rule of the commission.
8 (c) “Short-term suitability” has the meaning given that term by rule of the commission.
9 (2) When a city takes action that reduces the amount or usability of prime industrial land
10 within the urban growth boundary, the city shall take additional action to replace the prime
11 industrial land or to mitigate the impact of the action to ensure that the development ca-
12 pacity to satisfy the need for prime industrial land is not reduced or compromised.
13 (3) To satisfy this section, a city must replace prime industrial land with other prime
14 industrial land that is similar in terms of its size and short-term suitability and is similarly
15 serviceable.
16
NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
New sections are in boldfaced type.
LC 1241