← Find this measure
2009 REGULAR SESSION · HB 3467
Introduced — HB 3467 (2009R1)
This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.
Other indexed documents for this measure (2)
- Introduced — HB 3467 (2009R1) · open
- OLIS measure summary
Recorded legislative activity (4)
- First Reading Of House Bills
- First reading. Referred to Speaker's desk.
- Referred to Sustainability and Economic Development.
- In committee upon adjournment.
Citation and provenance
Oregon Legislature. Introduced — HB 3467 (2009R1). 2009 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2009R1/Downloads/MeasureDocument/HB3467/Introduced Retrieved 2026-09-02.
Document ID: doc_44d6255492182fafd86a
Original SHA-256: fd9bf9f9d90fb3d3f24e2f8aedb96e0f85aae8fe1ca994cac086df2d9fd2caab
Extracted text SHA-256: 46cb85b9d392648d25861bf0acc14864d66c76bd6315733a2c6bfa865153f3f6
75th OREGON LEGISLATIVE ASSEMBLY--2009 Regular Session
House Bill 3467
Sponsored by Representative BERGER; Representatives GREENLICK, KOTEK
SUMMARY
The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
to consideration by the Legislative Assembly. It is an editor′s brief statement of the essential features of the
measure as introduced.
Initiates Oregon Community Power activation to acquire Portland General Electric Company.
Grants power given to acquisition review committee to Oregon Community Power Board of Direc-
tors. Allows use of eminent domain by Oregon Community Power to acquire Portland General
Electric Company.
Declares emergency, effective on passage.
1 A BILL FOR AN ACT
2 Relating to electric utilities; and declaring an emergency.
3 Be It Enacted by the People of the State of Oregon:
4 SECTION 1. Notwithstanding provisions of ORS 757.814 to the contrary:
5 (1) The Governor shall activate Oregon Community Power under ORS 757.814 (7) within
6 30 days of the effective date of this 2009 Act for the purposes of acquiring the Portland
7 General Electric Company.
8 (2) The Oregon Community Power Board of Directors created under ORS 757.834 shall
9 have the authority granted to the acquisition review committee under ORS 757.812 to 757.950,
10 including the authority to negotiate with the Portland General Electric Company and pur-
11 chase the company. The board shall give notice to all cities and counties within the service
12 area of the Portland General Electric Company as provided in ORS 757.814 (1)(b), but is not
13 required to follow any of the other acquisition procedures within ORS 757.814.
14 (3) Notwithstanding ORS 757.852 and 757.890, Oregon Community Power may use eminent
15 domain to acquire the Portland General Electric Company.
16 SECTION 2. This 2009 Act being necessary for the immediate preservation of the public
17 peace, health and safety, an emergency is declared to exist, and this 2009 Act takes effect
18 on its passage.
19
NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
New sections are in boldfaced type.
LC 3698