Skip to content
← Find this measure

2009 REGULAR SESSION · HB 3467

Introduced — HB 3467 (2009R1)

This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.

Other indexed documents for this measure (2)
Recorded legislative activity (4)
  1. First Reading Of House Bills
  2. First reading. Referred to Speaker's desk.
  3. Referred to Sustainability and Economic Development.
  4. In committee upon adjournment.
Citation and provenance

Oregon Legislature. Introduced — HB 3467 (2009R1). 2009 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2009R1/Downloads/MeasureDocument/HB3467/Introduced Retrieved 2026-09-02.

Document ID: doc_44d6255492182fafd86a

Original SHA-256: fd9bf9f9d90fb3d3f24e2f8aedb96e0f85aae8fe1ca994cac086df2d9fd2caab

Extracted text SHA-256: 46cb85b9d392648d25861bf0acc14864d66c76bd6315733a2c6bfa865153f3f6

                                 75th OREGON LEGISLATIVE ASSEMBLY--2009 Regular Session



                                              House Bill 3467
     Sponsored by Representative BERGER; Representatives GREENLICK, KOTEK


                                                             SUMMARY
     The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
     to consideration by the Legislative Assembly. It is an editor′s brief statement of the essential features of the
     measure as introduced.

          Initiates Oregon Community Power activation to acquire Portland General Electric Company.
     Grants power given to acquisition review committee to Oregon Community Power Board of Direc-
     tors. Allows use of eminent domain by Oregon Community Power to acquire Portland General
     Electric Company.
          Declares emergency, effective on passage.

 1                                                   A BILL FOR AN ACT
 2   Relating to electric utilities; and declaring an emergency.
 3   Be It Enacted by the People of the State of Oregon:
 4        SECTION 1. Notwithstanding provisions of ORS 757.814 to the contrary:
 5        (1) The Governor shall activate Oregon Community Power under ORS 757.814 (7) within
 6   30 days of the effective date of this 2009 Act for the purposes of acquiring the Portland
 7   General Electric Company.
 8        (2) The Oregon Community Power Board of Directors created under ORS 757.834 shall
 9   have the authority granted to the acquisition review committee under ORS 757.812 to 757.950,
10   including the authority to negotiate with the Portland General Electric Company and pur-
11   chase the company. The board shall give notice to all cities and counties within the service
12   area of the Portland General Electric Company as provided in ORS 757.814 (1)(b), but is not
13   required to follow any of the other acquisition procedures within ORS 757.814.
14        (3) Notwithstanding ORS 757.852 and 757.890, Oregon Community Power may use eminent
15   domain to acquire the Portland General Electric Company.
16        SECTION 2. This 2009 Act being necessary for the immediate preservation of the public
17   peace, health and safety, an emergency is declared to exist, and this 2009 Act takes effect
18   on its passage.
19




     NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
     New sections are in boldfaced type.

     LC 3698