← Find this measure
2011 Regular Session · HB 2481
Introduced — HB 2481 (2011R1)
This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.
Other indexed documents for this measure (2)
- Introduced — HB 2481 (2011R1) · open
- OLIS measure summary
Recorded legislative activity (4)
- First Reading Of House Bills
- First reading. Referred to the desks of the Co-Speakers.
- Referred to General Government and Consumer Protection.
- In committee upon adjournment.
Citation and provenance
Oregon Legislature. Introduced — HB 2481 (2011R1). 2011 Regular Session. https://olis.oregonlegislature.gov/liz/2011R1/Downloads/MeasureDocument/HB2481/Introduced Retrieved 2026-09-02.
Document ID: doc_4eda8a8af228fdc211e1
Original SHA-256: c2d40de5f6b38f801ef87450df7f4454abaaa8adf2a6b306247b132f0c8ddef6
Extracted text SHA-256: 84750fc2e5b8e2fe57edb801c18a82c0320285889ac689eb72b903da2372031e
76th OREGON LEGISLATIVE ASSEMBLY--2011 Regular Session
House Bill 2481
Ordered printed by the Speaker pursuant to House Rule 12.00A (5). Presession filed (at the request of House In-
terim Committee on Consumer Protection and Government Accountability)
SUMMARY
The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
to consideration by the Legislative Assembly. It is an editor’s brief statement of the essential features of the
measure as introduced.
Requires that moisture sensitive components of one and two family dwellings pass moisture
content testing before enclosure in location that prevents normal drying.
1 A BILL FOR AN ACT
2 Relating to moisture in residential structures.
3 Be It Enacted by the People of the State of Oregon:
4 SECTION 1. Section 2 of this 2011 Act is added to and made a part of ORS chapter 455.
5 SECTION 2. (1) As used in this section:
6 (a) “General contractor” means:
7 (A) A licensed contractor that is a general contractor as defined in ORS 701.005; or
8 (B) A person not described in subparagraph (A) of this paragraph who signs a statement
9 described in ORS 701.325 (2).
10 (b) “Moisture sensitive component” means an item that is:
11 (A) Capable of containing more than 19 percent moisture by weight; and
12 (B) Intended for enclosure in a location where drying in service cannot readily occur.
13 (2) The general contractor for a new one or two family dwelling shall ensure that each
14 moisture sensitive component of the dwelling is tested for moisture content. The testing
15 must be conducted by a building inspector or by an independent tester acceptable to the
16 Department of Consumer and Business Services or the municipality inspecting the dwelling.
17 If testing is performed by an independent tester, the general contractor shall ensure that a
18 copy of the test results are provided to the building inspector for the dwelling.
19 (3) The general contractor may not allow the installation of interior finishes in the
20 dwelling until any moisture sensitive components to be enclosed by those finishes have been
21 tested and found to contain no more than 19 percent moisture content.
22 (4) Framing, trusses, joists, structural sheeting and other structural components that
23 are made of wood or wood products, and all insulation materials, are conclusively presumed
24 to be moisture sensitive components.
25 (5) The department may adopt rules to carry out this section. The rules may include,
26 but need not be limited to, rules that identify:
27 (a) Acceptable moisture testing methods and procedures;
28 (b) Types of components and materials that are capable of containing more than 19 per-
29 cent moisture by weight; and
30 (c) Types of enclosures and locations that may prevent drying in normal service.
31 SECTION 3. Section 2 of this 2011 Act applies to new one and two family dwellings for
NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
New sections are in boldfaced type.
LC 1321
HB 2481
1 which an initial building permit is issued on or after the effective date of this 2011 Act.
2
[2]