← Find this measure
2007 REGULAR SESSION · HB 3241
Introduced — HB 3241 (2007R1)
This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.
Other indexed documents for this measure (3)
- Staff Measure Summary — HB 3241 (2007R1)
- Introduced — HB 3241 (2007R1) · open
- OLIS measure summary
Recorded legislative activity (20)
- First Reading Of House Bills
- First reading. Referred to Speaker's desk.
- Referred to Judiciary.
- Heard
- Public Hearing held.
- Not Heard
- Not Heard
- Heard and Reported Out
- Work Session held.
- Recommendation: Do pass.
- Second Reading Of House Bills
- Second reading.
- Rules suspended. Carried over to May 16, 2007 Calendar.
- Third Reading Of House Bills
- First Reading Of House Measures
- Third reading. Carried by Cameron. Passed.
- Potential conflict(s) of interest declared by Bruun, Schaufler, Scott, Thatcher.
- First reading. Referred to President's desk.
- Referred to Rules.
- In committee upon adjournment.
Citation and provenance
Oregon Legislature. Introduced — HB 3241 (2007R1). 2007 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2007R1/Downloads/MeasureDocument/HB3241/Introduced Retrieved 2026-09-02.
Document ID: doc_81b0d4da0c5cf0ba9b0a
Original SHA-256: e66aa2fb78b3a2595a14d26ab243bc37f5d727a566552697ac585f215ac5890e
Extracted text SHA-256: 2a6a831b5d712125a89cc2bbaa2a1db8c2fcae76a27b17fe1d7a4bcaf0b15c1c
74th OREGON LEGISLATIVE ASSEMBLY--2007 Regular Session
House Bill 3241
Sponsored by Representatives SCHAUFLER, RILEY; Representatives BRUUN, GILLIAM (at the request of
Oregon-Columbia Chapter of Associated General Contractors, Oregon State Building and Construction Trades
Council)
SUMMARY
The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
to consideration by the Legislative Assembly. It is an editor′s brief statement of the essential features of the
measure as introduced.
Requires that certain causes of action related to improvement to large commercial structures
be commenced within six years after substantial completion or abandonment of construction, alter-
ation or repair.
1 A BILL FOR AN ACT
2 Relating to actions involving improvements to real property; creating new provisions; and amending
3 ORS 12.135.
4 Be It Enacted by the People of the State of Oregon:
5 SECTION 1. ORS 12.135 is amended to read:
6 12.135. (1) An action against a person, whether in contract, tort or otherwise, arising from such
7 person having performed the construction, alteration or repair of any improvement to real property
8 or the supervision or inspection thereof, or from such person having furnished the design, planning,
9 surveying, architectural or engineering services for such improvement, [shall] must be commenced
10 [within] before the earliest of:
11 (a) The applicable period of limitation otherwise established by law;
12 (b) [but in any event such action shall be commenced within 10] Ten years [from] after substan-
13 tial completion or abandonment of [such] construction, alteration or repair of [the improvement to
14 real property] a small commercial structure as defined in ORS 701.005, or a residential struc-
15 ture as defined in ORS 701.005; or
16 (c) Six years after substantial completion or abandonment of construction, alteration or
17 repair of a large commercial structure as defined in ORS 701.005.
18 (2) Notwithstanding subsection (1) of this section, an action against a person for the practice
19 of architecture, as defined in ORS 671.010, the practice of landscape architecture, as defined in ORS
20 671.310, or the practice of engineering, as defined in ORS 672.005, to recover damages for injury to
21 a person, property or to any interest in property, including damages for delay or economic loss, re-
22 gardless of legal theory, arising from the construction, alteration or repair of any improvement to
23 real property shall be commenced within two years from the date the injury or damage is first dis-
24 covered or in the exercise of reasonable care should have been discovered; but in any event the
25 action shall be commenced within 10 years from substantial completion or abandonment of the con-
26 struction, alteration or repair.
27 (3) For purposes of this section, “substantial completion” means the date when the contractee
28 accepts in writing the construction, alteration or repair of the improvement to real property or any
29 designated portion thereof as having reached that state of completion when it may be used or oc-
30 cupied for its intended purpose or, if there is no such written acceptance, the date of acceptance
NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
New sections are in boldfaced type.
LC 2713
HB 3241
1 of the completed construction, alteration or repair of such improvement by the contractee.
2 (4) For the purposes of this section, an improvement to real property shall be considered aban-
3 doned on the same date that the improvement is considered abandoned under ORS 87.045.
4 (5) This section:
5 (a) Applies, in addition to other actions, to actions brought in the name of the state or any
6 county or other public corporation therein, or for its benefit; and
7 (b) Does not apply to actions against any person in actual possession and control of the im-
8 provement, as owner, tenant or otherwise, at the time such cause of action accrues.
9 SECTION 2. The amendments to ORS 12.135 by section 1 of this 2007 Act apply only to
10 causes of action arising on or after the effective date of this 2007 Act.
11
[2]