Skip to content
← Find this measure

2009 REGULAR SESSION · SB 50

A-Engrossed — SB 50 (2009R1)

This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.

Other indexed documents for this measure (7)
Recorded legislative activity (29)
  1. Introduction and First Reading Of Senate Measures
  2. Introduction and first reading. Referred to President's desk.
  3. Referred to Business and Transportation.
  4. Heard
  5. Public Hearing held.
  6. Heard and Reported Out with Amendments
  7. Work Session held.
  8. Recommendation: Do pass with amendments. (Printed A-Eng.)
  9. Second Reading Of Senate Measures
  10. Second reading.
  11. Third Reading Of Senate Measures
  12. Third reading. Carried by Schrader. Passed.
  13. First Reading Of Senate Bills
  14. First reading. Referred to Speaker's desk.
  15. Referred to Business and Labor.
  16. Heard and Reported Out
  17. Public Hearing and Work Session held.
  18. Recommendation: Do pass.
  19. Second Reading Of Senate Bills
  20. Second reading.
  21. Rules suspended. Carried over to May 11, 2009 Calendar.
  22. Rules suspended. Carried over to May 12, 2009 Calendar.
  23. Third Reading Of Senate Bills
  24. Third reading. Carried by Edwards C.. Passed.
  25. President signed.
  26. Speaker signed.
  27. Governor signed.
  28. Chapter 160, 2009 Laws.
  29. Effective date, May 26, 2009.
Citation and provenance

Oregon Legislature. A-Engrossed — SB 50 (2009R1). 2009 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2009R1/Downloads/MeasureDocument/SB50/A-Engrossed Retrieved 2026-09-02.

Document ID: doc_885303100d1502331de9

Original SHA-256: 5d57c2999f156c80f856a7bb9d9b69673d6fe7527882c23595ef52744e3a8d9e

Extracted text SHA-256: 106992ddc9671e9a204f5f4808564819b3ff4d2bbdfc885b996d0bc705549c48

                                 75th OREGON LEGISLATIVE ASSEMBLY--2009 Regular Session



                                                       A-Engrossed
                                                Senate Bill 50
                                                Ordered by the Senate February 20
                                         Including Senate Amendments dated February 20

     Printed pursuant to Senate Interim Rule 213.28 by order of the President of the Senate in conformance with pre-
          session filing rules, indicating neither advocacy nor opposition on the part of the President (at the request
          of Commissioner of the Bureau of Labor and Industries Brad Avakian)


                                                             SUMMARY
     The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
     to consideration by the Legislative Assembly. It is an editor′s brief statement of the essential features of the
     measure.

         Sets [uniform] deadline of 180 days for notices of claim made on contractor′s payment bond in
     connection with work performed on public contract. Sets deadline of 200 days for notices of claim
     for required contribution to fund of employee benefit plan.
         Declares emergency, effective on passage.

 1                                                   A BILL FOR AN ACT
 2   Relating to deadlines for notices of claim on contractor′s payment bonds; creating new provisions;
 3        amending ORS 279C.605; and declaring an emergency.
 4   Be It Enacted by the People of the State of Oregon:
 5        SECTION 1. ORS 279C.605 is amended to read:
 6        279C.605. (1) The notice of claim required by ORS 279C.600 must be sent by registered or cer-
 7   tified mail or hand delivered no later than [120] 180 days after the day the person last provided labor
 8   or furnished materials or [120] 180 days after the worker listed in the notice of claim by the Com-
 9   missioner of the Bureau of Labor and Industries last provided labor. The notice may be sent or de-
10   livered to the contractor or subcontractor at any place the contractor or subcontractor maintains
11   an office or conducts business or at the residence of the contractor or subcontractor.
12        (2) Notwithstanding subsection (1) of this section, if the claim is for a required contribution to
13   a fund of [any] an employee benefit plan, the notice required by ORS 279C.600 must be sent or de-
14   livered within [150] 200 days after the employee last provided labor or materials.
15        (3) The notice must be in writing substantially as follows:
16   _______________________________________________________________________________________
17
18        To (here insert the name of the contractor or subcontractor and the name of the public body):
19        Notice hereby is given that the undersigned (here insert the name of the claimant) has a claim
20   for (here insert a brief description of the labor or materials performed or furnished and the person
21   by whom performed or furnished; if the claim is for other than labor or materials, insert a brief
22   description of the claim) in the sum of (here insert the amount) dollars against the (here insert
23   public works bond or payment bond, as applicable) taken from (here insert the name of the principal
24   and, if known, the surety or sureties upon the public works bond or payment bond) for the work of
25   (here insert a brief description of the work concerning which the public works bond or payment
26   bond was taken). Such material or labor was supplied to (here insert the name of the contractor


     NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
     New sections are in boldfaced type.

     LC 821
                                           A-Eng. SB 50


 1   or subcontractor).
 2
 3
 4                                                                                     (here to be signed)
 5   _______________________________________________________________________________________
 6
 7       (4) When notice of claim is given by the commissioner and if the claim includes a worker who
 8   is then unidentified, the commissioner shall include in the notice a statement that the claim includes
 9   an unidentified worker for whom the commissioner has received information indicating that the
10   worker has not been paid in full at the prevailing rate of wage required by ORS 279C.840 or over-
11   time wages required by ORS 279C.540.
12       (5) The person making the claim or giving the notice shall sign the notice.
13       SECTION 2. The amendments to ORS 279C.605 by section 1 of this 2009 Act apply to no-
14   tices of claim sent in connection with public contracts first advertised or, if not advertised,
15   entered into on or after the effective date of this 2009 Act.
16       SECTION 3. This 2009 Act being necessary for the immediate preservation of the public
17   peace, health and safety, an emergency is declared to exist, and this 2009 Act takes effect
18   on its passage.