← Find this measure
2011 Regular Session · SB 178
Enrolled — SB 178 (2011R1)
This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.
Other indexed documents for this measure (5)
- Staff Measure Summary — SB 178 (2011R1)
- Staff Measure Summary — SB 178 (2011R1)
- Enrolled — SB 178 (2011R1) · open
- Introduced — SB 178 (2011R1)
- OLIS measure summary
Recorded legislative activity (30)
- Introduction and First Reading Of Senate Measures
- Introduction and first reading. Referred to President's desk.
- Referred to Business, Transportation and Economic Development.
- Heard
- Public Hearing and Work Session held.
- Heard and Reported Out
- Work Session held.
- Second Reading Of Senate Measures
- Recommendation: Do pass.
- Second reading.
- Third Reading Of Senate Measures
- Third reading. Carried by Beyer. Passed.
- First Reading Of Senate Bills
- First reading. Referred to the desks of the Co-Speakers.
- Referred to Judiciary.
- Heard
- Public Hearing held.
- Heard and Reported Out
- Work Session held.
- Recommendation: Do pass.
- Second Reading Of Senate Bills
- Second reading.
- Third Reading Of Senate Bills
- Third reading. Carried by Schaufler. Passed.
- Potential conflict(s) of interest declared by Bentz.
- President signed.
- Co-Speakers signed.
- Governor signed.
- Chapter 265, 2011 Laws.
- Effective date, June 7, 2011.
Citation and provenance
Oregon Legislature. Enrolled — SB 178 (2011R1). 2011 Regular Session. https://olis.oregonlegislature.gov/liz/2011R1/Downloads/MeasureDocument/SB178/Enrolled Retrieved 2026-09-02.
Document ID: doc_8b354b8fce1d929dc8bc
Original SHA-256: f08a52091034daabf53bfe0f739bb79b75535bff90a099fb195c033f94d8ecb9
Extracted text SHA-256: 5f7ab4fa3854185432926e51f31ef7c57398126cf865bc9fc892c148bf4a7f74
76th OREGON LEGISLATIVE ASSEMBLY--2011 Regular Session
Enrolled
Senate Bill 178
Printed pursuant to Senate Interim Rule 213.28 by order of the President of the Senate in conform-
ance with presession filing rules, indicating neither advocacy nor opposition on the part of the
President (at the request of Senate Interim Committee on Commerce and Workforce Develop-
ment)
CHAPTER .................................................
AN ACT
Relating to prevailing rate of wage applicable to public works contracts; creating new provisions;
amending ORS 279C.815, 279C.830 and 279C.855; and declaring an emergency.
Be It Enacted by the People of the State of Oregon:
SECTION 1. ORS 279C.815 is amended to read:
279C.815. (1) As used in this section, “person” [includes any] means an employer, a labor or-
ganization or [any] an official representative of an employee or employer association.
(2)(a) The Commissioner of the Bureau of Labor and Industries at least once each year shall
determine the prevailing rate of wage for workers in each trade or occupation in each locality de-
scribed in ORS 279C.800 [at least once each year] by means of an independent wage survey and shall
make this information available at least twice each year. The commissioner may amend the rate at
any time.
(b) If [it appears to the commissioner that] the data derived only from the survey described in
paragraph (a) of this subsection [are] appear to the commissioner to be insufficient to determine
the prevailing rate of wage, the commissioner [also] shall consider additional information such as
collective bargaining agreements, other independent wage surveys and the prevailing rates of wage
determined by appropriate federal agencies or agencies of adjoining states. If there is not a majority
in the same trade or occupation paid at the same rate, the average rate of hourly wage, including
all fringe benefits, paid in the locality to workers in the same trade or occupation [shall be] is the
prevailing rate. If the wage [paid by any] a contractor or subcontractor pays to workers on [any]
a public works is based on [some] a period of time other than an hour, the hourly wage [shall] must
be mathematically determined by the number of hours worked in that period of time.
[(c) The commissioner shall compare the prevailing rate of wage determined under paragraph (a)
of this subsection with the federal prevailing rate of wage required under the Davis-Bacon Act (40
U.S.C. 3141 et seq.) and determine which rate is higher for workers in each trade or occupation in each
locality. The commissioner shall make this information, showing which prevailing rate of wage is
higher for workers in each trade or occupation in each locality, available at the same time as the
commissioner makes information available under paragraph (a) of this subsection.]
(3) A person shall make [such] reports and returns to the Bureau of Labor and Industries [as]
that the commissioner [may require] requires to determine the prevailing rates of wage[. The re-
ports and returns shall be made upon forms furnished by], using forms the bureau provides and
Enrolled Senate Bill 178 (SB 178-INTRO) Page 1
within the time [prescribed by] the commissioner prescribes. The person or an authorized repre-
sentative of the person shall certify to the accuracy of the reports and returns.
(4) Notwithstanding ORS 192.410 to 192.505, [all] reports and returns or other information pro-
vided to the commissioner under this section are confidential and not available for inspection by the
public.
(5) [In order to assist the commissioner in making determinations of the prevailing rates of
wage,] The commissioner may enter into [contracts] a contract with a public or private [parties]
party to obtain [relevant] data and information the commissioner needs to determine the pre-
vailing rate of wage. [Any such] The contract may [include provisions] provide for the manner and
extent of the market review of affected trades and occupations and [such] for other requirements
regarding timelines of reports, accuracy of data and information and supervision and review as the
commissioner [may prescribe] prescribes.
SECTION 2. ORS 279C.830 is amended to read:
279C.830. (1)(a) Except as provided in paragraph [(d)] (e) of this subsection, the specifications
for every contract for public works [shall] must contain a provision [stating] that states the ex-
isting state prevailing rate of wage and, if applicable, the federal prevailing rate of wage required
under the Davis-Bacon Act (40 U.S.C. 3141 et seq.) that [may] must be paid to workers in each trade
or occupation [required for the public works employed in the performance of the contract either by]
that the contractor or subcontractor or other person who is a party to the contract uses in
performing all or part of the contract. [doing or contracting to do the whole or any part of the
work contemplated by the contract. When] If the prevailing rates of wage are available electronically
or are accessible on the Internet, the rates may be incorporated into the specifications by referring
to the electronically accessible or Internet-accessible rates and by providing adequate information
about how to access the rates.
(b) If a public agency [is required] under paragraph (a) of this subsection [to] must include the
state and federal prevailing rates of wage in the specifications, the public agency [also shall include
in the specifications information showing which prevailing rate of wage is higher for workers in each
trade or occupation in each locality, as determined by the Commissioner of the Bureau of Labor and
Industries under ORS 279C.815 (2)(c).] shall also require the contractor to pay the higher of the
applicable state or federal prevailing rate of wage to all workers on the public works.
(c) Every contract and subcontract [shall contain a provision] must provide that the workers
[shall] must be paid not less than the specified minimum hourly rate of wage in accordance with
ORS 279C.838 and 279C.840.
(d) If a public works project is subject both to ORS 279C.800 to 279C.870 and to the
Davis-Bacon Act, every contract and subcontract must provide that workers on the public
works must be paid not less than the higher of the applicable state or federal prevailing rate
of wage.
[(d)] (e) A public works project described in ORS 279C.800 (6)(a)(B) or (C) is subject to the ex-
isting state prevailing rate of wage or, if applicable, the federal prevailing rate of wage required
under the Davis-Bacon Act that is in effect at the time a public agency enters into an agreement
with a private entity for the project. After that time, the specifications for [any] a contract for the
public works [shall] must include the applicable prevailing rate of wage.
(2) The specifications for [every] a contract for public works [shall contain a provision stating]
must provide that the contractor and every subcontractor must have a public works bond filed with
the Construction Contractors Board before starting work on the project, unless exempt under ORS
279C.836 (4), (7), (8) or (9). Every contract [awarded by] that a contracting agency awards must
require [shall contain a provision requiring] the contractor to:
(a) [To] Have a public works bond filed with the Construction Contractors Board before starting
work on the project, unless exempt under ORS 279C.836 (4), (7), (8) or (9).
(b) [To include in] Require, in every subcontract, [a provision requiring the subcontractor to]
that the subcontractor have a public works bond filed with the Construction Contractors Board
before starting work on the project, unless exempt under ORS 279C.836 (4), (7), (8) or (9).
Enrolled Senate Bill 178 (SB 178-INTRO) Page 2
SECTION 3. ORS 279C.855 is amended to read:
279C.855. (1) [Any] A contractor or subcontractor or contractor’s or subcontractor’s surety that
violates the provisions of ORS 279C.840 is liable to the workers affected in the amount of [their] the
workers’ unpaid minimum wages, including all fringe benefits, and in an additional amount equal
to the unpaid wages as liquidated damages.
(2) Actions to enforce liability to workers under subsection (1) of this section may be brought
as actions on contractors’ bonds as provided for in ORS 279C.610.
(3) If a public agency fails to [include a provision that the contractor and any subcontractor shall
comply with ORS 279C.840] provide in the advertisement for bids, the request for bids, the contract
specifications, the accepted bid or elsewhere in the contract documents that the contractor and
any subcontractor must comply with ORS 279C.840, the liability of the public agency for unpaid
minimum wages, as described in subsection (1) of this section, is joint and several with [any] a
contractor or subcontractor that had notice of the requirement to comply with ORS 279C.840.
(4) [When] If a public works project is subject to the Davis-Bacon Act, [(]40 U.S.C. 3141 et
seq.[)], and a public agency fails to include the state and federal prevailing rates of wage in the
specifications for the contract for public works as required under ORS 279C.830 (1)(a), or fails to
[include in the specifications information showing which prevailing rate of wage is higher for workers
in each trade or occupation in each locality as required under ORS 279C.830 (1)(b)] provide in the
contract that workers on the public works must be paid not less than the higher of the ap-
plicable state or federal prevailing rate of wage as required under ORS 279C.830 (1)(d), the
public agency is liable to each affected worker for:
(a) The worker’s unpaid minimum wages, including fringe benefits, in an amount that equals, for
each hour worked, the difference between the applicable higher rate of wage and the lower rate of
wage; and
(b) An additional amount, equal to the amount of unpaid minimum wages due under paragraph
(a) of this subsection, as liquidated damages.
(5) The Commissioner of the Bureau of Labor and Industries may enforce the provisions of
subsections (3) and (4) of this section by a civil action under ORS 279C.850 (4), by a civil action on
an assigned wage claim under ORS 652.330, or by an administrative proceeding on an assigned wage
claim under ORS 652.332.
SECTION 4. The amendments to ORS 279C.830 and 279C.855 by sections 2 and 3 of this
2011 Act apply to contracts for public works that a contracting agency first advertises or
solicits on or after the effective date of this 2011 Act or, if the contracting agency does not
advertise or solicit the contract, to a contract that the contracting agency enters into on
or after the effective date of this 2011 Act.
SECTION 5. This 2011 Act being necessary for the immediate preservation of the public
peace, health and safety, an emergency is declared to exist, and this 2011 Act takes effect
on its passage.
Enrolled Senate Bill 178 (SB 178-INTRO) Page 3
Passed by Senate March 21, 2011 Received by Governor:
........................M.,........................................................., 2011
..................................................................................
Robert Taylor, Secretary of Senate Approved:
........................M.,........................................................., 2011
..................................................................................
Peter Courtney, President of Senate
..................................................................................
Passed by House May 25, 2011 John Kitzhaber, Governor
Filed in Office of Secretary of State:
..................................................................................
Bruce Hanna, Speaker of House ........................M.,........................................................., 2011
.................................................................................. ..................................................................................
Arnie Roblan, Speaker of House Kate Brown, Secretary of State
Enrolled Senate Bill 178 (SB 178-INTRO) Page 4