← Find this measure
2007 REGULAR SESSION · SB 149
A-Engrossed — SB 149 (2007R1)
This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.
Other indexed documents for this measure (7)
Recorded legislative activity (32)
- Introduction and First Reading Of Senate Measures
- Introduction and first reading. Referred to President's desk.
- Referred to Environment and Natural Resources.
- Heard
- Public Hearing held.
- Heard and Reported Out
- Public Hearing and Work Session held.
- Recommendation: Do pass with amendments. (Printed A-Eng.)
- Second Reading Of Senate Measures
- Second reading.
- Carried over to 04-11 by unanimous consent.
- Taken from 04-11 Calendar and placed on 04-18 Calendar on voice vote.
- Taken from 04-18 Calendar and placed on 04-23 Calendar on voice vote.
- Third Reading Of Senate Measures
- Third reading. Carried by Beyer. Passed.
- Morse declared potential conflict of interest.
- First Reading Of Senate Bills
- First reading. Referred to Speaker's desk.
- Referred to Agriculture and Natural Resources.
- Not Heard
- Heard and Reported Out
- Public Hearing and Work Session held.
- Recommendation: Do pass and be placed on Consent Calendar.
- Second Reading Of Senate Bills
- Second reading.
- Consent Calendar
- Read third time under Consent Calendar. Passed.
- President signed.
- Speaker signed.
- Governor signed.
- Chapter 318, 2007 Laws.
- Effective date, January 1, 2008.
Citation and provenance
Oregon Legislature. A-Engrossed — SB 149 (2007R1). 2007 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2007R1/Downloads/MeasureDocument/SB149/A-Engrossed Retrieved 2026-09-02.
Document ID: doc_a37d232d4cc835b2eadf
Original SHA-256: 40e624e8725454fced046eb4f249a5610dd784e77fae8b1e8411ee1b85db718c
Extracted text SHA-256: 947ad92c4ecb07a3662267ffd7071b42dda79a9b2950478ba8b9bedf8702af25
74th OREGON LEGISLATIVE ASSEMBLY--2007 Regular Session
A-Engrossed
Senate Bill 149
Ordered by the Senate April 5
Including Senate Amendments dated April 5
Printed pursuant to Senate Interim Rule 213.28 by order of the President of the Senate in conformance with pre-
session filing rules, indicating neither advocacy nor opposition on the part of the President (at the request
of Governor Theodore R. Kulongoski for State Department of Geology and Mineral Industries)
SUMMARY
The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
to consideration by the Legislative Assembly. It is an editor′s brief statement of the essential features of the
measure.
Modifies statutes relating to mine reclamation. Revises definitions. Establishes when State De-
partment of Geology and Mineral Industries may revoke, terminate or refuse to renew operating
permit. Specifies when department shall transfer operating permit. Specifies when department may
modify operating permit or reclamation plan, and when department may not issue operating permit.
Allows governing board of department to adopt rules related to surveying or marking of
surface mining operations.
Creates crime of knowingly or recklessly causing substantial harm to human health or envi-
ronment. Punishes by maximum of [one year′s imprisonment, $6,250 fine, or both] $10,000 fine.
1 A BILL FOR AN ACT
2 Relating to the State Department of Geology and Mineral Industries; creating new provisions;
3 amending ORS 517.750, 517.755, 517.780, 517.790, 517.800, 517.820, 517.830, 517.835, 517.840,
4 517.850, 517.860, 517.865, 517.870, 517.880, 517.910, 517.930, 517.940, 517.950, 517.956, 517.984,
5 517.987, 517.990 and 517.992; and repealing ORS 517.785.
6 Be It Enacted by the People of the State of Oregon:
7 SECTION 1. Sections 2, 3, 4 and 4a of this 2007 Act are added to and made a part of ORS
8 517.750 to 517.901.
9 SECTION 2. (1) Except as provided in subsection (2) of this section, the State Department
10 of Geology and Mineral Industries may not revoke, terminate or refuse to renew an operat-
11 ing permit if marketable reserves exist at the permitted site and if there is a significant
12 potential for continued mining opportunities given reasonably foreseeable economic condi-
13 tions.
14 (2) The department may revoke, terminate or refuse to renew an operating permit if the
15 operator:
16 (a) Requests termination, provided that all reclamation requirements in the operating
17 permit and reclamation plan have been satisfied;
18 (b) Fails to pay a fee as required by ORS 517.800 within 60 days of the due date;
19 (c) Fails to provide or maintain a bond or security as required by ORS 517.810;
20 (d) Fails to comply with an order issued under ORS 517.860; or
21 (e) Fails to comply with a suspension order issued under ORS 517.880.
22 (3) If an operating permit is revoked, terminated or not renewed, the operator may not
23 perform any actions at the permitted site, except that the operator may, after receiving
NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
New sections are in boldfaced type.
LC 618
A-Eng. SB 149
1 written approval from the department:
2 (a) Perform actions at the permitted site that are necessary to comply with reclamation
3 requirements in the operating permit or reclamation plan, including but not limited to re-
4 moval of mining-related stockpiles;
5 (b) Excavate materials at the permitted site that are necessary for reclamation; and
6 (c) Remove any excavated materials from buffers, setbacks or other areas not approved
7 for disturbance and restore the areas to the approximate pre-mining contours with materials
8 approved by the department.
9 (4) The department, in lieu of or in addition to revoking, terminating or refusing to renew
10 an operating permit for the reasons specified in subsection (2) of this section, may recover
11 against the bond or security filed pursuant to ORS 517.810 and reclaim the area affected by
12 surface mining.
13 SECTION 3. (1) A person who by sale, assignment, lease or other means has succeeded
14 in interest to an uncompleted surface mining operation may request that the State Depart-
15 ment of Geology and Mineral Industries release the existing operator from any reclamation
16 obligations and transfer the operating permit to the successor. The department shall trans-
17 fer the operating permit, unless:
18 (a) The successor does not agree to full assumption of the reclamation requirements in
19 the operating permit and reclamation plan;
20 (b) The successor fails to provide a bond or security as required by ORS 517.810;
21 (c) More than one person has a claim to the property or operating permit and there is
22 a dispute between the claimants that presents a justiciable controversy; or
23 (d) The successor, as the operator of another permitted site in this state, has failed to
24 substantially comply with the conditions of an operating permit or reclamation plan, the
25 provisions of ORS 517.702 to 517.989 or the rules adopted by the department to carry out the
26 purposes of ORS 517.702 to 517.989.
27 (2) The governing board of the State Department of Geology and Mineral Industries may
28 adopt rules relating to the responsibilities and duties of a person requesting a transfer of an
29 operating permit under this section.
30 SECTION 4. (1) Except as provided in subsection (2) of this section, the State Department
31 of Geology and Mineral Industries may not modify an operating permit or reclamation plan
32 without the consent of the operator.
33 (2) The department may modify an operating permit or reclamation plan without the
34 consent of the operator if, because of changed conditions at the permitted site or because
35 of information otherwise not available to the department at the time of permit issuance or
36 reclamation plan establishment, the department finds, by substantial evidence, that a mod-
37 ification is justified due to the potential for:
38 (a) Substantial harm to off-site property;
39 (b) Harm to threatened or endangered species; or
40 (c) Channel changes or unstable pit walls.
41 (3) Modification of an operating permit or reclamation plan without the consent of the
42 operator must be limited to the areas or matters affected by the changed conditions or new
43 information.
44 (4) If the department modifies an operating permit or reclamation plan without the con-
45 sent of the operator, the department must provide the operator with an opportunity for al-
[2]
A-Eng. SB 149
1 ternative dispute resolution in the manner provided in ORS 183.502.
2 SECTION 4a. (1)(a) The governing board of the State Department of Geology and Mineral
3 Industries may adopt rules requiring the surveying or marking of surface mining operations.
4 (b) The rules may include, but are not limited to, requirements for maps or diagrams
5 showing areas excavated or approved for excavation, setbacks or buffers established by the
6 operating permit and the location of buildings, wells, ponds, haul roads, stockpiles, bodies of
7 water and floodways.
8 (c) The rules may require that information required under this subsection be updated if
9 the mining operations are subject to:
10 (A) A notice of violation under ORS 517.860;
11 (B) A suspension order under ORS 517.880; or
12 (C) A significant modification of the operating permit or reclamation plan under section
13 4 of this 2007 Act.
14 (d) The rules may exempt mining operations from survey or marking requirements based
15 on the size or location of the operations or on the distance of the operations from ground
16 and surface waters.
17 (e) The rules must allow for reasonable compliance schedules for existing mining oper-
18 ations.
19 (2) The governing board may adopt rules requiring surface mining operators to collect
20 and report information relating to amount and nature of materials excavated or processed
21 at a surface mining operation and the impacts of mining operations on ground or surface
22 water.
23 SECTION 5. ORS 517.750 is amended to read:
24 517.750. As used in ORS 517.702 to 517.989, unless the context requires otherwise:
25 (1) “Board” means the governing board of the State Department of Geology and Mineral Indus-
26 tries.
27 (2) “Completion” means termination of surface mining activities including reclamation of the
28 surface-mined land in accordance with the approved reclamation plan and operating permit.
29 (3) “Department” means the State Department of Geology and Mineral Industries.
30 (4) “Exploration” means all activities conducted on or beneath the surface of the earth for the
31 purpose of determining presence, location, extent, grade or economic viability of a deposit. “Explo-
32 ration” does not include prospecting or chemical processing of minerals.
33 (5) “Explorer” means, notwithstanding the provisions of ORS 517.810 (2), any individual, public
34 or private corporation, political subdivision, agency, board or department of this state, any munici-
35 pality, partnership, association, firm, trust, estate or any other legal entity whatsoever that is en-
36 gaged in exploration.
37 (6) “Landowner” means:
38 (a) The person possessing fee title to the natural mineral deposit being surface mined or
39 explored[.]; and
40 (b) The owner of an equitable interest in land that is subject to a deed of trust.
41 (7) “Minerals” includes soil, coal, clay, stone, sand, gravel, metallic ore and any other solid
42 material or substance excavated for commercial, industrial or construction use from natural deposits
43 situated within or upon lands in this state.
44 (8) “Operator” means any individual, public or private corporation, political subdivision, agency,
45 board or department of this state, any municipality, partnership, association, firm, trust, estate or
[3]
A-Eng. SB 149
1 any other legal entity whatsoever that is engaged in surface mining operations.
2 (9) “Overburden” means the soil, rock and similar materials that lie above natural deposits of
3 minerals.
4 (10) “Person” means any person, any federal agency or any public body, as defined in ORS
5 174.109.
6 [(10)] (11) “Processing” includes, but is not limited to, crushing, washing, milling and screening
7 as well as the batching and blending of mineral aggregate into asphalt and portland cement concrete
8 located within the operating permit area.
9 [(11)] (12) “Reclamation” means the employment in a surface mining operation or exploration
10 of procedures[,] reasonably designed to:
11 (a) Minimize, as much as practicable [the disruption from], the adverse effects of the surface
12 mining operation or exploration on land, air and water resources; and [to]
13 (b) Provide for the rehabilitation of [any such] surface resources adversely affected by [such]
14 the surface mining operations or exploration through the rehabilitation of plant cover, soil
15 stability[,] and water resources and through other measures [appropriate] that contribute to the
16 subsequent beneficial use of [such] the explored [or], mined [and] or reclaimed lands.
17 [(12)] (13) “Reclamation plan” means a written proposal, submitted to the department as re-
18 quired by ORS 517.702 to 517.989 and subsequently approved by the department as provided in ORS
19 517.702 to 517.989, for the reclamation of the land area adversely affected by a surface mining op-
20 eration or exploration and including, but not limited to the following information:
21 (a) Proposed measures to be undertaken by the operator in protecting the natural resources of
22 adjacent lands.
23 (b) Proposed measures for the rehabilitation of the explored or surface-mined lands and the
24 procedures to be applied.
25 (c) The procedures to be applied in the surface mining operation or exploration to control the
26 discharge of contaminants and the disposal of surface mining refuse.
27 (d) The procedures to be applied in the surface mining operation or exploration in the rehabili-
28 tation of affected stream channels and stream banks to a condition minimizing erosion,
29 sedimentation and other factors of pollution.
30 (e) The map required by ORS 517.790 (1)(e) and such other maps and supporting documents as
31 may be requested by the department.
32 (f) A proposed time schedule for the completion of reclamation operations.
33 (g) Requirements of the exploration permit.
34 [(13) “Spoil bank” means a deposit of excavated overburden or mining refuse.]
35 (14) “Surface impacts of underground mining” means all waste materials produced by
36 underground mining and placed upon the surface including, but not limited to, waste dumps,
37 mill tailings, washing plant fines and all surface subsidence related to underground mining.
38 [(14)(a)] (15)(a) “Surface mining” includes all or any part of the process of mining minerals by
39 the removal of overburden and the extraction of natural mineral deposits thereby exposed by any
40 method by which more than 5,000 cubic yards of minerals are extracted or by which at least one
41 acre of land is affected within a period of 12 consecutive calendar months, including open-pit mining
42 operations, auger mining operations, processing, surface impacts of underground mining, production
43 of surface mining refuse and the construction of adjacent or off-site borrow pits (except those con-
44 structed for use as access roads).
45 (b) “Surface mining” does not include:
[4]
A-Eng. SB 149
1 (A) Excavations of sand, gravel, clay, rock or other similar materials conducted by the land-
2 owner or tenant for the primary purpose of construction, reconstruction or maintenance of access
3 roads on the same parcel or on an adjacent parcel that is under the same ownership as the
4 parcel that is being excavated;
5 (B) [and] Excavation or grading operations [conducted in the process of farming or cemetery op-
6 erations, on-site road construction or other on-site construction,] reasonably necessary for farming;
7 (C) [or] Nonsurface [impacts] effects of underground [mines;] mining; or
8 (D) [and also does not include] Removal of rock, gravel, sand, silt or other similar substances
9 removed from the beds or banks of any waters of this state pursuant to a permit issued under ORS
10 196.800 to [196.825 and 196.835 to 196.870] 196.900.
11 [(15)] (16) “Surface mining refuse” means all waste materials, soil, rock, mineral, liquid, vege-
12 tation and other materials resulting from or displaced by surface mining operations within the op-
13 erating permit area, including all waste materials deposited in or upon lands within [such] the
14 operating permit area.
15 [(16) “Surface impacts of underground mining” means all waste materials produced by under-
16 ground mining and placed upon the surface including, but not limited to, waste dumps, mill tailings,
17 washing plant fines, and all surface subsidence related to underground mining.]
18 (17) “Underground mining” means all human-made excavations below the surface of the ground
19 through shafts or adits for the purpose of exploring for, developing or producing valuable minerals.
20 SECTION 6. ORS 517.780 is amended to read:
21 517.780. (1) The provisions of ORS 517.702 to 517.989 and the rules and regulations adopted
22 thereunder [shall] do not supersede any zoning laws or ordinances in effect on July 1, 1972. How-
23 ever, if [such] the zoning laws or ordinances are repealed on or after July 1, 1972, the provisions
24 of ORS 517.702 to 517.989 and the rules and regulations adopted thereunder [shall be] are control-
25 ling. The governing board of the State Department of Geology and Mineral Industries may adopt
26 rules and regulations with respect to matters [presently] covered by [such] zoning laws and ordi-
27 nances in effect on July 1, 1972.
28 [(2) In lieu of the permit required by ORS 517.790, an operator may conduct surface mining pro-
29 vided such surface mining is done pursuant to a valid permit issued by the appropriate authority of a
30 city or county in which the mining is taking place, if such authority has adopted an ordinance, ap-
31 proved by the board prior to July 1, 1984, requiring reclamation of land that has been surface mined.
32 If such county ordinance is repealed on or after July 1, 1984, the provisions of ORS 517.702 to 517.989
33 and the rules and regulations adopted thereunder shall be controlling. The board may adopt rules and
34 regulations with respect to matters presently covered by such zoning laws and ordinances. A county
35 ordinance adopted for the purpose specified in this subsection may apply to surface mining within a
36 city in the county if the city consents thereto. On or after July 1, 1984, surface mining shall be con-
37 ducted only pursuant to the permit required under ORS 517.790 in all counties which have not received
38 approval of an ordinance prior to that date.]
39 [(3)] (2) City or county operated surface mining operations [which] that sell less than 5,000 cubic
40 yards of minerals within a period of 12 consecutive calendar months[,] are exempt from the state
41 mining permit requirements of ORS 517.702 to 517.989 if the city or county adopts an ordinance
42 [which shall include] that includes a general reclamation scheme establishing the means and meth-
43 ods of achieving reclamation for city or county operated surface mining sites exempted from the
44 state permit requirements by this subsection.
45 [(4) A city or county may determine and collect fees for any function performed pursuant to sub-
[5]
A-Eng. SB 149
1 section (2) of this section. However, no such fee shall exceed the amounts prescribed in ORS 517.800.
2 A city or county shall issue a permit for each regulated surface mining activity within its jurisdiction,
3 and all such permittees are subject to the payment of any fee charged by the city or county. However,
4 those activities described in ORS 517.770 are not required to comply with mined land reclamation
5 plans. City or county fees shall be in lieu of any surface mining permit fees assessed by the State De-
6 partment of Geology and Mineral Industries.]
7 SECTION 7. ORS 517.790 is amended to read:
8 517.790. (1) [Except as otherwise provided by ORS 517.780 (2), after July 1, 1972, no] A landowner
9 or operator [shall permit] may not allow or engage in surface mining on land not surface mined on
10 July 1, 1972, without [having first applied for and received an] holding a valid operating permit from
11 the State Department of Geology and Mineral Industries for [such] the surface mining operation. A
12 separate permit [shall be] is required for each separate surface mining operation. [Prior to
13 receiving] A person seeking an operating permit from the department [the landowner or operator
14 must] shall submit an application on a form provided by the department that contains the following
15 information [considered by the department to be pertinent in its review of the application, including
16 but not limited to]:
17 (a) The name and address of the landowner and the operator and the names and addresses of
18 any persons designated by them as their agents for the service of process.
19 (b) The materials for which the [surface mining] operation is to be conducted.
20 (c) The type of surface mining to be employed in [such] the operation.
21 (d) The proposed date for the initiation of [such] the operation.
22 (e) The size and legal description of the lands that will be affected by [such] the operation, and,
23 if more than 10 acres of land will be affected by [such] the operation and if the department [con-
24 siders] determines that the conditions [to] warrant it, a map of the lands to be surface mined that
25 [shall include] includes the boundaries of the affected lands, topographic details of [such] the lands,
26 the location and names of all streams, roads, railroads, [and] utility facilities, wells, irrigation
27 ditches, ponds, stockpiles, buffers, setbacks and excavation boundaries within or adjacent to
28 [such] the lands, the location of all proposed access roads to be protected or constructed in con-
29 ducting [such] the operation and the names and addresses of the owners of all surface and mineral
30 interests of the lands included within the surface mining area.
31 (f) If [economically] practicable, a plan for visual screening by vegetation or otherwise that will
32 be established and maintained on the lands within [such] the operation for the purpose of screening
33 [such] the operation from the view of persons using adjacent public highways, public parks and
34 residential areas.
35 (g) The type of monitoring well abandonment procedures.
36 [(2)] (h) [The application referred to in subsection (1) of this section must also contain] A proposed
37 reclamation plan that is acceptable to and approved by the department.
38 (i) Any other information that the department considers pertinent in its review of the
39 application.
40 (2) The department may waive the requirement for preparation and approval of a recla-
41 mation plan if:
42 (a) The operation is conducted as part of the on-site construction of a building, public
43 works project or other physical improvement of the subject property;
44 (b) The operation is reasonably necessary for such construction; and
45 (c) The proposed improvements are authorized by the local jurisdiction with land use
[6]
A-Eng. SB 149
1 authority.
2 (3) The department may not issue an operating permit to an operator other than the
3 owner or owners of the surface and mineral interests of the lands included within the surface
4 mining area unless the operator:
5 (a) Has written approval from the owner or owners of all surface and mineral interests
6 of the lands included within the surface mining area; and
7 (b) Maintains a legal interest in the lands that is sufficient to ensure that the operator
8 has the authority to operate and reclaim the lands as provided in the operating permit and
9 reclamation plan.
10 (4) The department may refuse to issue an operating permit to a person who has not, in
11 the determination of the department, substantially complied with the conditions of an oper-
12 ating permit or reclamation plan, the provisions of this chapter or the rules adopted by the
13 department to carry out the purposes of this chapter.
14 SECTION 8. ORS 517.830 is amended to read:
15 517.830. (1) [Except as provided in subsection (3)(a) and (b) of this section,] Upon receipt of an
16 application for an operating permit, the State Department of Geology and Mineral Industries shall
17 [cause] inspect the operating site described [therein to be inspected] in the application. Within [45]
18 90 days after the date [on which such] that the application [is received] and [upon receipt of] the
19 required permit fee are received, the department shall issue the operating permit applied for or, if
20 it considers [such] the application incomplete, return the application to the applicant for correction
21 of the deficiencies indicated by the department.
22 (2) Failure by the department to act upon the reclamation plan submitted with an application
23 for an operating permit within the [45-day] 90-day period referred to in subsection (1) of this section
24 [shall not be considered] is not a denial by the department of the operating permit applied for. The
25 department, pending final approval of a reclamation plan, may issue a provisional permit subject to
26 reasonable limitations that may be prescribed by the department and conditioned upon the appli-
27 cant′s compliance with the bond and security requirements established by ORS 517.810.
28 (3)(a) Notwithstanding [the provisions of] subsections (1) and (2) of this section, if an application
29 involves an aggregate site that requires a permit issued pursuant to ORS 215.427 or 227.178, and if
30 the local jurisdiction requests that the application not be decided until the local jurisdiction has
31 taken final action, the department shall make a final decision on the operating permit and recla-
32 mation plan no later than 165 days after the date a complete land use application is submitted to
33 the local jurisdiction, unless the applicant agrees to allow additional time under ORS 215.427,
34 215.429, 227.178 or 227.179. If a plan amendment is required as part of issuance of a permit, the
35 provisions of paragraph (b) of this subsection apply. The department [shall] may not approve an
36 operating permit and reclamation plan if the land use application is denied.
37 (b) Notwithstanding [the provisions of] subsections (1) and (2) of this section, if an application
38 involves an aggregate site that requires [a comprehensive plan] amendment to a comprehensive
39 plan, as defined in ORS 197.015, and if the local jurisdiction requests that the application not be
40 decided until the local jurisdiction has taken final action on the plan amendment, the department
41 [shall] may not make a final decision on the operating permit and reclamation plan until the local
42 jurisdiction has taken final action on the plan amendment. The department shall make its final de-
43 cision within 45 days of the date that the local jurisdiction has taken final action on the plan
44 amendment. The department [shall] may not approve an operating permit and reclamation plan if
45 the plan amendment is denied.
[7]
A-Eng. SB 149
1 [(c)] (4) Conditions and requirements imposed on an operating permit and reclamation plan, and
2 modifications thereto, issued subsequent to issuance of a local jurisdiction permit shall be compat-
3 ible with the requirements and conditions of the local government permit, unless more stringent
4 requirements are necessary to comply with the provisions of ORS 517.750 to 517.901.
5 [(d)] (5) If a local jurisdiction does not request that the department delay a decision on an op-
6 erating permit and reclamation plan as provided in [paragraphs (a) and (b) of this subsection] sub-
7 section (3) of this section, the department shall:
8 (a) Give the local jurisdiction the opportunity to review and comment on the application[,]; and
9 [shall]
10 (b) Notify the local jurisdiction of the decision and requirements and conditions imposed by the
11 department.
12 [(4)] (6) If the department refuses to approve a submitted reclamation plan [in the form sub-
13 mitted by the applicant], it shall notify the applicant, in writing, of its reasons for the refusal to ap-
14 prove [such] the reclamation plan, including additional requirements as may be prescribed by the
15 department for inclusion in [such] the reclamation plan. Within 60 days after the receipt of [such]
16 the notice, the applicant shall comply with the additional requirements prescribed by the depart-
17 ment for [such] the reclamation plan or file with the department a notice of appeal from the decision
18 of the department with respect to [such] the reclamation plan. If a notice of appeal is filed with the
19 department by the applicant, the department may issue a provisional permit to [such] the applicant.
20 [(5) An operating permit issued by the department under this section shall be granted for the period
21 required to mine the land described in such permit and shall be valid, subject to payment of the re-
22 newal fee, until the surface mining operation described in the operating permit is completed or mining
23 operations cease and the site is reclaimed. Each such operating permit shall provide that the operating
24 permit and the reclamation plan described therein may be modified upon agreement between the de-
25 partment and the permittee to change the reclamation plan included within the operating permit. In
26 addition, for operating permits first issued or expanded after October 23, 1999, the department may
27 modify an operating permit and reclamation plan as necessary to address new information or changed
28 conditions for site conditions that will result in substantial harm to off-site public or private property
29 and that relate to slope stability, surface mining activities that will result in a taking of endangered
30 species or channel changes that threaten pit wall stability. Upon a determination that the activity will
31 result in substantial harm, the department shall meet with the permittee to discuss the proposed mod-
32 ifications to the operating permit and reclamation plan. A final determination by the department to
33 require a unilateral modification of an operating permit and reclamation plan shall be based on clear
34 and convincing scientific evidence. Any modification required by the department shall be limited to
35 those areas and matters affected by the new information or changed conditions.]
36 [(6) The department may not require a unilateral modification of an operating permit and recla-
37 mation plan under subsection (5) of this section without first providing the permittee an opportunity for
38 an alternative means of dispute resolution as authorized by ORS 183.502.]
39 [(7) When a person succeeds to the interest of a permittee in any uncompleted surface mining op-
40 eration by sale, assignment, lease or other means, the department shall release the permittee from the
41 duties imposed upon the permittee under the operating permit if a successor assumes fully the duties
42 of the former permittee with respect to the reclamation of the surface-mined lands. Upon the assumption
43 by such person of the duties of the permittee as provided in this subsection, the department shall
44 transfer the operating permit to the successor upon the approval of such successor′s bond or security
45 as required under ORS 517.702 to 517.989.]
[8]
A-Eng. SB 149
1 [(8)] (7) If an application is submitted as part of the consolidated application process under ORS
2 517.952 to 517.989, review of the application and approval or denial of the application shall be in
3 accordance with ORS 517.952 to 517.989. However, [such] the review and approval or denial shall
4 take into consideration all policy considerations for issuing a permit under ORS 517.702 to 517.989.
5 SECTION 9. ORS 517.835 is amended to read:
6 517.835. (1) Notwithstanding [ORS 517.830 (5)] section 4 of this 2007 Act, the State Department
7 of Geology and Mineral Industries may require conditions on any new or existing surface mining
8 operating permit or reclamation plan sufficient to prevent or mitigate off-site impacts to ground
9 water resources from the removal of water from surface mining operations. The department may
10 include ground water monitoring as one of the conditions.
11 (2) The department shall consult with the [permittee] operator and the Water Resources De-
12 partment in assessing off-site impacts and in developing prevention or mitigation measures prior to
13 imposing any conditions on an operating permit or reclamation plan pursuant to this section.
14 SECTION 10. ORS 517.840 is amended to read:
15 517.840. (1) The governing board of the State Department of Geology and Mineral Industries
16 shall administer and enforce the provisions of ORS 517.702 to 517.989 and:
17 (a) May conduct or cause to be conducted investigations, research, experiments and demon-
18 strations and may collect and disseminate information related to surface mining and the reclamation
19 of surface-mined lands.
20 (b) May cooperate with other governmental and private agencies of this state or of other states
21 and with agencies of the federal government, including the reimbursement for any services provided
22 by such agencies to the State Department of Geology and Mineral Industries at its request.
23 (c) May apply for, accept and expend public and private funds made available for the reclama-
24 tion of lands affected by surface mining in accordance with the purposes of ORS 517.702 to 517.989.
25 (d) May, in accordance with the applicable provisions of ORS chapter 183, adopt rules [consid-
26 ered by the board to be necessary in carrying] to carry out the provisions of ORS 517.702 to 517.989.
27 [However, such rules shall be subject to existing rights under any permit, license, lease or other valid
28 authorization granted or issued by a governmental entity.]
29 (e) Shall establish by rule a program to encourage voluntary reclamation practices that exceed
30 the normal reclamation standards to provide maximum enhancement and benefits from mined lands.
31 The program shall include incentives and other actions that will encourage voluntary reclamation
32 practices.
33 (f) May receive and manage abandoned mined land funds received for abandoned mined land
34 reclamation from the federal government.
35 (2) [Not later than one year after October 3, 1989, the board, after] In consultation with the De-
36 partment of Environmental Quality, the board shall identify [initially] those naturally occurring
37 hazardous or toxic metals and minerals [which] that, if present in sufficient concentrations at a
38 surface mining site, subject the [permittee] operator to the increased bond or security requirements
39 of ORS 517.950. The metals and minerals shall include, but need not be limited to, arsenic, mercury,
40 lead, uranium and asbestos.
41 SECTION 11. ORS 517.860 is amended to read:
42 517.860. (1) If, from inspections conducted pursuant to ORS 517.850[,] or from any other
43 source, the State Department of Geology and Mineral Industries determines that the [permittee]
44 operator has not complied with or is not complying with the operating permit, the reclamation plan,
45 the provisions of this chapter or the rules of the department, the department may issue either or
[9]
A-Eng. SB 149
1 both of the following to the operator:
2 (a) Written notice of the violation [to the permittee,]. The notice shall specifically [outlining]
3 outline the deficiencies.
4 (b) [The notice] A compliance order. The order may specify a date by which the [a period
5 during which the permittee shall commence action to rectify those deficiencies and diligently proceed
6 with such action until all deficiencies are corrected. The notice may include a date by which all defi-
7 ciencies must be corrected. However,] operator shall rectify any deficiencies. The department may
8 extend [performance periods for] the period if delays occasioned for causes beyond the [permittee′s]
9 operator′ s control necessitate more time, but only when the [permittee] operator is, in the opin-
10 ion of the department, making a reasonable effort to comply with the order.
11 (2) [The department may issue an order requiring compliance with the operating permit, reclama-
12 tion plan, this chapter or the rules of the department, or] The department may recover against the
13 bond or alternative form of financial security and reclaim the area affected by surface mining if the
14 department determines that an operator:
15 (a) [A permittee] Has failed to comply with a department [notice] order issued under subsection
16 (1) of this section;
17 (b) [A permittee] Fails to complete reclamation in conformance with the reclamation plan on any
18 segment of the [permit area] permitted site or fails to complete reclamation in a timely manner; or
19 (c) [A permittee] Fails to maintain an operating permit and pay all fees required under ORS
20 517.800.
21 (3) If the department makes a claim on the bond or security filed pursuant to ORS
22 517.810, the surety on the bond or holder of the other security shall pay to the department the
23 amount of the bond or other security required [for such completion to the department upon the de-
24 partment′s demand under subsection (2) of this section]. The department may reclaim the surface-
25 mined land in a manner determined by the department, including by public or private contractor.
26 If the amount [specified in the demand] is not paid within 30 days, [following such demand] the At-
27 torney General, upon request of the department, shall institute proceedings to recover the amount
28 [specified in the demand].
29 (4) If the landowner has given security as provided in ORS 517.810 (3) and the [permittee] op-
30 erator is in default as specified in subsection (2) of this section, the landowner shall be held re-
31 sponsible for complying with the reclamation plan of the [permittee] operator. The department shall
32 furnish written notice of the default to the landowner and require the landowner to complete the
33 reclamation as specified in the [permittee′s] operator′ s reclamation plan acceptable to the depart-
34 ment. If the landowner has not commenced action to rectify the deficiencies within 30 days after
35 receiving notice, or if the landowner fails to diligently pursue reclamation in conformance with the
36 plan, the department may demand payment of the amount of the bond or other security from the
37 surety or other holder and otherwise proceed as provided in [subsection (2)] subsections (2) and (3)
38 of this section [, including requesting the Attorney General to institute proceedings to recover the
39 amount specified in the demand].
40 (5) The department, in performing reclamation of surface-mined land, shall pursue a goal for
41 reclamation designed to [be at the level necessary to]:
42 (a) Remove hazards;
43 (b) Protect from drainage problems and from pollution;
44 (c) Meet local land use requirements for reclamation; and
45 (d) Comply with all federal and state laws.
[10]
A-Eng. SB 149
1 (6) The department may [refuse to issue or renew an operating permit to any person if the de-
2 partment determines that the person has not substantially complied with an operating permit, a recla-
3 mation plan, the provisions of this chapter or rules adopted by the department pursuant to this
4 chapter] delay, for a reasonable time not to exceed one year, all or part of any reclamation
5 activities if the department determines that it is likely that:
6 (a) Marketable mineral reserves exist at the permitted site; and
7 (b) A new operator will seek an operating permit for the site and assume all reclamation
8 responsibilities.
9 SECTION 12. ORS 517.880 is amended to read:
10 517.880. (1) When the State Department of Geology and Mineral Industries finds that an operator
11 is conducting a surface mining operation for which an operating permit is required by ORS 517.702
12 to 517.989 or by rules adopted by the department, but has not been issued by the department
13 [under the provisions of ORS 517.702 to 517.989 or by the rules adopted under ORS 517.702 to
14 517.989], the department may issue an order to the operator to suspend [such] the operation until
15 an operating permit has been issued by the department for [such] the surface mining operation or
16 until [such time as] the department is assured that [such] the operator will comply with the re-
17 quirement to obtain a permit.
18 (2) The department may issue an order to an operator to suspend operations if the operator has
19 not complied with or is not complying with the operating permit, reclamation plan, this chapter or
20 rules of the department. Failure to comply includes, but is not limited to, disturbing land
21 within the permit boundary that has not been approved by the department for excavation,
22 placement of debris or removal of vegetation.
23 (3) If the operator fails or refuses to comply with a suspension order, the Attorney General, at
24 the request of the department, shall initiate any necessary legal proceeding to enjoin [such] the
25 surface mining operation and to provide for [the] completion of the reclamation of the lands affected
26 by [such] the operation, including the restoration of buffers, setbacks or other areas not ap-
27 proved for disturbance.
28 SECTION 13. ORS 517.990 is amended to read:
29 517.990. (1) [Any landowner or operator] A person who conducts a surface mining operation[, for
30 which a permit is required by ORS 517.750 to 517.901,] without a valid operating permit [therefor]
31 as required by ORS 517.750 to 517.901 commits a Class A violation.
32 (2) Subject to ORS 153.022, violation of any provision of ORS 517.750 to 517.901, or any rules
33 promulgated pursuant thereto, or of any conditions of an operating permit is a Class A violation.
34 (3) Subject to ORS 153.022, violation of ORS 517.910 to 517.951, or any rules promulgated pur-
35 suant thereto, or of any conditions of an operating permit for a nonaggregate surface mining oper-
36 ation is punishable, upon conviction, by a fine of not more than $10,000.
37 (4) Notwithstanding any other provision of the law, [any landowner or operator] a person who
38 conducts a nonaggregate surface mining operation[,] without a valid operating permit as required
39 by ORS 517.910 to 517.951 shall be punished, upon conviction, by a fine of not more than $10,000.
40 (5) A person commits a violation subject to a fine of not more than $10,000 if the person
41 knowingly or recklessly causes substantial harm to human health or the environment while:
42 (a) Conducting a surface mining operation without a valid operating permit as required
43 by ORS 517.750 to 517.901 or 517.905 to 517.951; or
44 (b) Violating an operating permit, a reclamation plan, a provision of this chapter or any
45 rule adopted by the State Department of Geology and Mineral Industries to carry out the
[11]
A-Eng. SB 149
1 provisions of this chapter.
2 (6) For purposes of this section, “substantial harm to human health or the
3 environment” means:
4 (a) Physical injury, as defined in ORS 161.015, or risk of serious physical injury, as defined
5 in ORS 161.015, to humans; or
6 (b) Substantial damage to wildlife, plants, aquatic and marine life, habitat or stream
7 buffers.
8 SECTION 14. ORS 517.992 is amended to read:
9 517.992. (1) In addition to any other sanction authorized by law, the governing board of the State
10 Department of Geology and Mineral Industries may impose a civil penalty of not less than $200 per
11 day and not more than $50,000 per day for any violation of ORS 517.702 to 517.989 related to a
12 chemical process mine, of any rules adopted under those provisions related to a chemical process
13 mine, of any orders issued under those provisions related to a chemical process mine or of any
14 conditions of a permit issued under those provisions related to a chemical process mine. A penalty
15 may be imposed under this section without regard to whether the violation occurs on property
16 covered by a permit issued under ORS 517.702 to 517.989.
17 (2)(a) In addition to any other sanction authorized by law, and subject to the limitations of
18 paragraph (b) of this subsection, the governing board of the State Department of Geology and Min-
19 eral Industries may impose a civil penalty of not more than $10,000 per day for any violation of ORS
20 517.702 to 517.740, 517.750 to 517.901 and 517.905 to 517.951 not related to a chemical process mine,
21 of any rules adopted under those provisions not related to a chemical process mine, of any orders
22 issued under those provisions not related to a chemical process mine or of any conditions of a per-
23 mit issued under those provisions not related to a chemical process mine.
24 (b) A penalty may be imposed under this subsection only if a landowner or operator fails to
25 complete erosion stabilization as required by ORS 517.775 or board rules adopted to implement that
26 section, if the operator has failed to comply with [a final] an order issued under ORS 517.860 or
27 517.880, if the operation is being conducted in violation of conditions imposed on an operating permit
28 or reclamation plan pursuant to ORS 517.835 or if the operation is being conducted:
29 (A) Without a permit;
30 (B) Outside the permit boundary; or
31 (C) Outside a permit condition regarding boundaries, setbacks, buffers or the placement of sur-
32 face mining refuse.
33 [(3) A civil penalty imposed under this section shall become due and payable 10 days after the or-
34 der imposing the civil penalty becomes final by operation of law or on appeal. A person against whom
35 a civil penalty is to be imposed shall be served with a notice in the form provided in ORS 183.415.
36 Service of the notice shall be accomplished in the manner provided by ORS 183.415.]
37 [(4) The person to whom the notice provided for in subsection (3) of this section is addressed shall
38 have 20 days from the date of service of the notice in which to make written application for a hearing.
39 If no application for a hearing is made, the agency may make a final order imposing the penalty.]
40 [(5) Any person who makes application as provided for in subsection (4) of this section shall be
41 entitled to a hearing. The hearing shall be conducted as a contested case hearing pursuant to the ap-
42 plicable provisions of ORS 183.413 to 183.470.]
43 [(6) Judicial review of an order made after a hearing under subsection (5) of this section shall be
44 as provided in ORS 183.480 to 183.497 for judicial review of contested cases.]
45 [(7) When an order assessing a civil penalty under this section becomes final by operation of law
[12]
A-Eng. SB 149
1 or on appeal, and the amount of penalty is not paid within 10 days after the order becomes final, the
2 order may be recorded with the county clerk in any county of this state. The clerk shall thereupon re-
3 cord the name of the person incurring the penalty and the amount of the penalty in the County Clerk
4 Lien Record.]
5 (3) Civil penalties under this section shall be imposed in the manner provided by ORS
6 183.745.
7 [(8)] (4) Failure to pay a civil penalty that has become final under this section shall be grounds
8 for revocation of any permit issued under ORS 517.702 to 517.989 to the person against whom the
9 penalty has been assessed.
10 [(9)] (5) Any civil penalty received by the State Treasurer under this section shall be deposited
11 in the General Fund to the credit of the Geology and Mineral Industries Account and is contin-
12 uously appropriated to the State Department of Geology and Mineral Industries to the extent nec-
13 essary for the administration and enforcement of the laws, rules and orders under which the penalty
14 was assessed.
15 [(10)] (6) A reclamation fund shall be established into which funds not used [to administer] as
16 described in subsection [(9)] (5) of this section shall be deposited. This money shall be used by the
17 State Department of Geology and Mineral Industries for the purpose of the reclamation of aban-
18 doned mine and drill sites.
19 [(11)] (7) When a single incident violates statutes, rules, board orders or permit conditions ad-
20 ministered by more than one agency, the department shall coordinate with the other agencies having
21 civil penalty authority before imposing a civil penalty.
22 [(12)] (8) In implementing this section, the department shall adopt rules that provide civil pen-
23 alties that are commensurate with the severity of violations. [and allow for a written warning at
24 least 48 hours prior to imposing a penalty when there is no immediate threat to human health, safety
25 or the environment. The written warning may be personally served on the person incurring the penalty
26 or may be sent by registered or certified mail. The warning shall include:]
27 [(a) A reference to the particular sections of the statute, rule, order or permit involved; and]
28 [(b) A short and plain statement of the matters asserted or charged.]
29 [(13)] (9) A civil penalty may be imposed against the board of directors and high managerial
30 agents of a corporation if those persons engage in, authorize, solicit, request, command or knowingly
31 tolerate the conduct for which the penalty is to be imposed. As used in this subsection, “agent” and
32 “high managerial agent” have [those] the meanings given those terms in ORS 161.170.
33 SECTION 15. ORS 517.755 is amended to read:
34 517.755. Notwithstanding the yard and acre limitations of ORS 517.750 [(14)] (15), as soon as any
35 mining operation begun after July 1, 1975, affects more than five acres of land the provisions of ORS
36 517.702 to 517.989 apply to the mining operation.
37 SECTION 16. ORS 517.800 is amended to read:
38 517.800. (1)(a) Except for an application for a chemical process mining operation submitted under
39 ORS 517.952 to 517.989, each applicant for an operating permit under ORS 517.702 to 517.989 shall
40 pay to the State Department of Geology and Mineral Industries a fee established by the State
41 Geologist in an amount not to exceed $1,260.
42 (b) If an application for a new permit or an amendment to an existing permit requires extraor-
43 dinary department resources because of concerns about slope stability or proximity to waters of the
44 state or other environmentally sensitive areas, the applicant shall pay to the department an addi-
45 tional fee in an amount determined by the State Geologist to be adequate to cover the additional
[13]
A-Eng. SB 149
1 costs for staff and other related expenses. The State Geologist shall consult with the applicant when
2 determining the amount of the fee.
3 (2) Annually, each holder of an operating permit shall pay to the department a base fee of $635,
4 plus $0.0075 per ton of aggregate or mineral ore extracted during the previous 12-month period.
5 (3) If a reclamation plan is changed, the [permittee] operator may be assessed for staff time and
6 other related costs an amount not to exceed $1,260 in addition to the annual renewal fee.
7 (4) If, at operator request, the department responds to requests for information required by a
8 local government in making a land use planning decision on behalf of the operator for a specific site,
9 the State Geologist may require the operator to pay the department a fee for staff time and related
10 costs. The department shall notify the operator in advance of the estimated costs of providing the
11 information, and the actual amount assessed shall not exceed the estimate provided by the depart-
12 ment.
13 (5) The State Geologist may require the operator of a site to pay to the department a special
14 inspection fee in an amount not to exceed $200 for an inspection conducted under the following
15 circumstances:
16 (a) Investigation of surface mining operations conducted without the operating permit required
17 under ORS 517.790; or
18 (b) Investigation of surface mining operations conducted outside the area authorized in an op-
19 erating permit.
20 (6) Upon request of an applicant[, permittee] or operator, the department shall provide an item-
21 ized list and documentation of expenses used to determine a fee under subsection (1)(b), (3) or (4)
22 of this section.
23 (7) Notwithstanding the per ton fee established in subsection (2) of this section, the governing
24 board of the department may lower to zero or raise the per ton fee up to $0.0085 if necessary to
25 provide financial certainty to the department or to reflect actual expenses of the department in ad-
26 ministering ORS 517.702 to 517.951. If the per ton fee established in subsection (2) of this section is
27 raised by the governing board, the additional amount of money collected by the department shall
28 be deposited in the Mined Land Regulation and Reclamation Program Subaccount within the
29 Geology and Mineral Industries Account.
30 (8) The governing board of the State Department of Geology and Mineral Industries:
31 (a) Shall adopt by rule a procedure for the administrative review of the determinations of fees
32 under this section.
33 (b) Shall adopt rules establishing the payment date for annual fees required under this section.
34 (c) May adopt rules establishing a late fee of up to five percent of the unpaid amount of an
35 annual fee owed under this section if the annual fee is more than 60 days past due.
36 SECTION 17. ORS 517.820 is amended to read:
37 517.820. (1) Upon good cause shown, the State Department of Geology and Mineral Industries
38 may grant reasonable extensions of time for the completion by the landowner or operator and the
39 submission to the department of a proposed reclamation plan required by ORS 517.790 [(2)]. Each
40 reclamation plan submitted to the department must provide that all reclamation activities shall be
41 completed within three years after the termination of mineral extraction from the surface mining
42 operation conducted within each separate area for which an operating permit is requested. Each
43 such reclamation plan shall be approved by the department if it adequately provides for the recla-
44 mation of surface-mined lands.
45 (2) The department, prior to approving a proposed reclamation plan, shall consult with all other
[14]
A-Eng. SB 149
1 interested state agencies and appropriate local planning authorities.
2 SECTION 18. ORS 517.850 is amended to read:
3 517.850. At such reasonable times as the State Department of Geology and Mineral Industries
4 may elect, the department, after reasonable advance notice has been given to the [permittee] oper-
5 ator, may cause the [permit area] permitted site to be inspected to determine if the [permittee]
6 operator has complied with the operating permit, reclamation plan, this chapter and the rules of the
7 department.
8 SECTION 19. ORS 517.865 is amended to read:
9 517.865. (1) If [a permittee] an operator fails to faithfully perform the reclamation required by
10 the reclamation plan and if the bond or security required by ORS 517.810 is not sufficient to com-
11 pensate the State Department of Geology and Mineral Industries for all reasonably necessary costs
12 and expenses incurred by it in reclaiming the surface-mined land, the amount due shall be a lien in
13 favor of the department upon all property, whether real or personal, belonging to the [permittee]
14 operator. However, for any [permittee which] operator that is first issued a permit after June 30,
15 1989, the lien shall not exceed $2,500 for each site plus $1,500 per acre.
16 (2) The lien shall attach upon the filing of a notice of claim of lien with the county clerk of the
17 county in which the property is located. The notice of lien claim shall contain a true statement of
18 the demand, the insufficiency of the bond or security to compensate the department and the failure
19 of the [permittee] operator to perform the reclamation required.
20 (3) The lien created by this section is prior to all other liens and encumbrances, except that the
21 lien shall have equal priority with tax liens.
22 (4) The lien created by this section may be foreclosed by a suit in the circuit court in the
23 manner provided by law for the foreclosure of other liens on real or personal property.
24 SECTION 20. ORS 517.870 is amended to read:
25 517.870. Upon request of the [permittee] operator, and when in the judgment of the State De-
26 partment of Geology and Mineral Industries the reclamation has been completed in accordance with
27 the reclamation plan, the [permittee] operator shall be notified that the work has been found to be
28 satisfactorily performed and is acceptable and the bond or security of the [permittee] operator shall
29 be adjusted accordingly.
30 SECTION 21. ORS 517.910 is amended to read:
31 517.910. For the purposes of ORS 517.910 to 517.989:
32 (1) Notwithstanding ORS 517.750 [(11)] (12), “reclamation” means the employment in a surface
33 mining operation of procedures reasonably designed to minimize as much as practicable the dis-
34 ruption from the surface mining operation or surface mining processing operation, including cyanide
35 leaching or any other chemical leaching processing at a processing site removed from the mining
36 site and to provide for the rehabilitation of any such surface resources through the use of plant
37 cover, soil stability techniques, and through the use of measures to protect the surface and subsur-
38 face water resources, including but not limited to domestic water use and agricultural water use,
39 and other measures appropriate to the subsequent beneficial use of any land or water resource af-
40 fected by a surface mining or processing operation.
41 (2) “Nonaggregate minerals” means coal and metal-bearing ores, including but not limited to
42 ores that contain nickel, cobalt, lead, zinc, gold, molybdenum, uranium, silver, aluminum, chrome,
43 copper or mercury.
44 SECTION 22. ORS 517.930 is amended to read:
45 517.930. (1) Notwithstanding ORS 517.850, if the State Department of Geology and Mineral In-
[15]
A-Eng. SB 149
1 dustries has reason to believe that the provisions of an operating permit are being violated or that
2 a surface mining operation is being conducted without a valid operating permit, it may inspect such
3 surface mining areas without prior notice.
4 (2) In addition to the department′s authority to inspect under ORS 517.850 and subsection (1)
5 of this section, for a chemical process mine operating under a permit issued under ORS 517.952 to
6 517.989, a cooperating agency also may inspect the mining operation to assure that the [permittee]
7 operator is complying with conditions imposed on the operating permit by the cooperating agency
8 under ORS 517.982 (2).
9 SECTION 23. ORS 517.940 is amended to read:
10 517.940. Notwithstanding ORS 517.860, for the purposes of ORS 517.910 to 517.989 the expendi-
11 ture by the State Department of Geology and Mineral Industries for reclamation not completed by
12 the [permittee] operator shall not exceed $10,000 per acre.
13 SECTION 24. ORS 517.950 is amended to read:
14 517.950. (1) Notwithstanding ORS 517.810, for the purposes of ORS 517.905 to 517.951 the bond
15 or security deposit required shall not exceed $10,000 per acre of land to be surface mined under the
16 terms of the operating permit.
17 (2) The State Department of Geology and Mineral Industries may increase the amount of the
18 bond or security required under subsection (1) of this section to an amount not to exceed the lower
19 of actual cost of reclamation or $100,000 per acre of land to be mined under the terms of the oper-
20 ating permit if the operating permit applies to extraction, processing or beneficiation techniques the
21 result of which:
22 (a) Will increase the concentration of naturally occurring hazardous or toxic metals and min-
23 erals identified by the governing board of the State Department of Geology and Mineral Industries
24 under ORS 517.840 to a significantly higher level than that occurring naturally within the [permit
25 area] permitted site; and
26 (b) Is reasonably likely to present a threat to public health, safety or the environment.
27 (3) The increased bond or security deposit under subsection (2) of this section may be required
28 only when the department determines that a threat to surface or subsurface waters is reasonably
29 likely to exist as a result of the permitted activity.
30 SECTION 25. ORS 517.956 is amended to read:
31 517.956. Any chemical process mining operation in Oregon shall comply with the following
32 standards:
33 (1) Chemical process mining, including extraction, processing and reclamation, shall be under-
34 taken in a manner that minimizes environmental damage through the use of the best available,
35 practicable and necessary technology to ensure compliance with environmental standards.
36 (2) Protection measures for fish and wildlife shall be consistent with policies of the State De-
37 partment of Fish and Wildlife, including:
38 (a) Protective measures to maintain an objective of zero wildlife mortality. All chemical pro-
39 cessing solutions and associated waste water shall be covered or contained to preclude access by
40 wildlife or maintained in a condition that is not harmful to wildlife.
41 (b) On-site and off-site mitigation ensuring that there is no overall net loss of habitat value.
42 (c) No loss of existing critical habitat of any state or federally listed threatened or endangered
43 species.
44 (d) Fish and wildlife mortality shall be reported in accordance with a monitoring and reporting
45 plan approved by the State Department of Fish and Wildlife.
[16]
A-Eng. SB 149
1 (e) The State Department of Fish and Wildlife shall establish by rule standards for review of a
2 proposed chemical process mining operation for the purpose of developing conditions for fish and
3 wildlife habitat protection that satisfy the terms of this section for inclusion in a consolidated permit
4 by the State Department of Geology and Mineral Industries.
5 (3) Surface reclamation of a chemical process mine site shall:
6 (a) Ensure protection of human health and safety, as well as that of livestock, fish and wildlife;
7 (b) Ensure environmental protection;
8 (c) Require certification to the [permittee] operator, by the State Department of Fish and
9 Wildlife and the State Department of Agriculture, that a self-sustaining ecosystem, comparable to
10 undamaged ecosystems in the area, has been established in satisfaction of the [permittee′s] opera-
11 tor′ s habitat restoration obligations; and
12 (d) Include backfilling or partial backfilling as determined on a case-by-case basis by the State
13 Department of Geology and Mineral Industries when necessary to achieve reclamation objectives
14 that cannot be achieved through other mitigation activities.
15 SECTION 26. ORS 517.984 is amended to read:
16 517.984. (1) The [permittee] operator, the State Department of Geology and Mineral Industries,
17 any other permitting agency or a cooperating agency may request modification of a permit issued
18 under the process established under ORS 517.952 to 517.989.
19 (2) If a permitting agency is requested to make a permit modification that the permitting agency
20 or a cooperating agency finds is a significant permit modification under the provisions of ORS
21 517.952 to 517.989, the agency shall notify the State Department of Geology and Mineral Industries.
22 The department shall coordinate the organization of a project coordinating committee. The project
23 coordinating committee shall review the proposed modification and determine those portions of ORS
24 517.952 to 517.989 with which the applicant must comply. The decision of the project review com-
25 mittee shall be:
26 (a) Limited to those portions of the chemical process mine operation to be modified; and
27 (b) Consistent with public participation as set forth in ORS 517.952 to 517.989.
28 SECTION 27. ORS 517.987 is amended to read:
29 517.987. (1) At the time of submitting a consolidated application under ORS 517.971, the appli-
30 cant shall estimate the total cost of reclamation consistent with the standards imposed under ORS
31 517.702 to 517.989. Using the reclamation estimate and a credible accident analysis as a guide, the
32 State Department of Geology and Mineral Industries shall make an initial determination as to the
33 amount of the reclamation bond necessary to protect human health and the environment. The de-
34 partment shall distribute a bond proposal to all permitting and cooperating agencies. The amount
35 of the bond that the department may require to cover the actual cost of reclamation shall not be
36 limited.
37 (2) The reclamation bond or alternative security acceptable to the department shall be posted
38 before the start of mining operations. The bond shall be issued by a bonding company licensed to
39 operate in Oregon. A mining operation may not satisfy the requirements for a bond through self-
40 insurance.
41 (3) The department shall assess annually the overall cost of reclamation. If changes in the op-
42 eration or modifications to a permit cause the cost of reclamation to exceed the amount of the
43 reclamation bond currently held by the state, the [permittee] operator shall post an additional bond
44 for the difference. All reclamation calculations shall be approved by the department. Incremental
45 surety increases shall be provided for, with the level of surety being consistent with the degree and
[17]
A-Eng. SB 149
1 forms of surface disturbance anticipated within a time period specified by the department. When the
2 actual surface area to be disturbed approaches the level expected by the department, the
3 [permittee] operator shall notify the department sufficiently in advance of reaching the acreage limit
4 specified to allow for a review of surety requirements and posting of additional surety by the
5 [permittee] operator prior to exceeding the acreage limit set by the department.
6 (4) If reclamation costs will exceed the posted bond and the operator does not increase the bond
7 amount, the department and other permitting agencies shall suspend all permits until the
8 [permittee] operator posts the additional bond security.
9 (5) The department may seek a lien against the assets of the [permittee] operator to cover the
10 cost of reclamation if the bond posted is insufficient. The amount of the lien shall be the amount
11 of the costs incurred by the department to complete reclamation. All current operating permits of
12 the [permittee] operator shall be suspended and the department shall deny immediately all pending
13 applications of the [permittee] operator to conduct mining operations.
14 (6)(a) The [permittee] operator shall submit to the department a written request for the release
15 of its reclamation bond. If the [permittee] operator has conducted concurrent reclamation, the
16 [permittee] operator shall submit an application for bond reduction which estimates the percentage
17 of reclamation done to date and the corresponding percentage of reclamation funds that the
18 [permittee] operator believes should be returned. A bond release or reduction request shall state in
19 unambiguous terms all measures taken to reclaim the site and any problem or potential problems
20 that may inhibit reclamation in accordance with permit requirements.
21 (b) The department shall distribute the request to each permitting or cooperating agency, to
22 members of the public who participated in the consolidated application under ORS 517.952 to
23 517.989, and to any person who requests notification. In addition, the department shall publish a
24 notice as provided in ORS 517.959 announcing receipt of a request for bond release or bond re-
25 duction.
26 (c) No sooner than 60 days after distributing the request and providing notice of the receipt of
27 the request, the department shall conduct an informal public hearing to determine whether to allow
28 the bond release or bond reduction.
29 (7) The department may require security or an annuity for post-reclamation monitoring and care
30 to be paid before the final bond release. The security or annuity shall be sufficient to cover long-
31 term site care and monitoring needs. The department shall determine the amount of the proposed
32 security or annuity and distribute a proposal to all permitting and cooperating agencies.
33 SECTION 28. ORS 517.785 is repealed.
34
[18]