Skip to content
← Find this measure

2010 Special Session · HB 3680

A-Engrossed — HB 3680 (2010S1)

This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.

Other indexed documents for this measure (9)
Recorded legislative activity (33)
  1. First Reading Of House Bills
  2. First reading. Referred to Speaker's desk.
  3. Referred to Revenue.
  4. Heard
  5. Public Hearing held.
  6. Heard and Reported Out with Amendments
  7. Public Hearing and Work Session held.
  8. Recommendation: Do pass with amendments and be printed A-Engrossed.
  9. Second Reading Of House Bills
  10. Second reading.
  11. Third Reading Of House Bills
  12. Third reading. Carried by Barnhart. Passed.
  13. Potential conflict(s) of interest declared by Bailey, Bentz, Cameron, Smith G..
  14. First Reading Of House Measures
  15. First reading. Referred to President's desk.
  16. Referred to Finance and Revenue.
  17. Heard
  18. Public Hearing held.
  19. Not Heard
  20. Heard and Reported Out with Amendments
  21. Work Session held.
  22. Recommendation: Do pass with amendments to the A-Eng. bill. (Printed B-Eng.)
  23. Second Reading Of House Measures
  24. Second reading.
  25. Third Reading Of House Measures
  26. Third reading. Carried by Burdick. Passed.
  27. Possible Consideration Of Senate Amendments
  28. House concurred in Senate amendments and repassed bill.
  29. Potential conflict(s) of interest declared by Bailey, Bentz, Smith G.
  30. Speaker signed.
  31. President signed.
  32. Governor signed.
  33. Chapter 76, (2010 Laws): Effective date May 27, 2010.
Citation and provenance

Oregon Legislature. A-Engrossed — HB 3680 (2010S1). 2010 Special Session. https://olis.oregonlegislature.gov/liz/2010S1/Downloads/MeasureDocument/HB3680/A-Engrossed Retrieved 2026-09-02.

Document ID: doc_ad1c8f2e815e2065abc1

Original SHA-256: 36beac1336143ea82db23912a5091c3b9804b1ae36735061206ed295eb6c612e

Extracted text SHA-256: 3b914d2845c31fddf314af0c4e2f5b1027e10ae4cfd517b37ab8dc1bf15b585c

                                 75th OREGON LEGISLATIVE ASSEMBLY--2010 Special Session



                                                       A-Engrossed
                                              House Bill 3680
                                                 Ordered by the House February 8
                                          Including House Amendments dated February 8

     Sponsored by COMMITTEE ON REVENUE


                                                             SUMMARY
     The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
     to consideration by the Legislative Assembly. It is an editor’s brief statement of the essential features of the
     measure.

          [Prohibits State Department of Energy from issuing preliminary certification to applicant seeking
     tax credit for erection, construction, installation or acquisition of large facility unless applicant meets
     specified conditions. Authorizes Director of State Department of Energy to revoke certificate if holder
     of certificate fails to comply with conditions.]
          [Prohibits Department of Revenue, if large facility tax credit is transferred, from paying interest
     on amounts claimed by transferee in amended income tax return.]
          [For certain types of facilities, lowers limit on cost eligible for preliminary certification.]
          [Authorizes State Department of Energy to treat certain multiple applications for preliminary cer-
     tification as single application under specified circumstances.]
          For facilities using or producing renewable energy resources, limits, per biennium, the
     total amount of potential tax credits for which preliminary certifications may be issued to
     applicants. Directs Director of State Department of Energy to develop system to allocate
     issuance of certifications within limitation, based on certain criteria as defined by rule.
          Requires taxpayer to provide additional information to department to support application
     for certification for energy tax credit.
          Modifies procedures and criteria for issuance, suspension and revocation of certification.
          Modifies definition of renewable energy resource to include renewable energy storage
     device. Modifies definition of “transportation facility” to include purchase of efficient truck
     technology for commercial motor vehicles.
          Extends sunsets for energy tax credits.
          For facilities using wind technology that have installed capacity of more than 10 mega-
     watts, reduces amount of available tax credits in each of three tax years, beginning with tax
     years beginning on or after January 1, 2010.
          Provides that, for facility using or producing renewable energy resources with certified
     cost in excess of $10 million, taxpayer may not begin to claim tax credit until tax year fol-
     lowing final certification.
          Takes effect on 91st day following adjournment sine die.

 1                                                   A BILL FOR AN ACT
 2   Relating to tax credits; creating new provisions; amending ORS 315.354, 315.357, 469.185, 469.195,
 3        469.197, 469.200, 469.205, 469.210, 469.215, 469.220 and 469.225; prescribing an effective date; and
 4        providing for revenue raising that requires approval by a three-fifths majority.
 5   Be It Enacted by the People of the State of Oregon:
 6        SECTION 1. Section 2 of this 2010 Act is added to and made a part of ORS 469.185 to
 7   469.225.
 8        SECTION 2. (1) The total amount of potential tax credits for all facilities using or
 9   producing renewable energy resources in this state may not, at the time of preliminary cer-
10   tification under ORS 469.210, exceed:
11        (a) $300 million for the biennium ending June 30, 2011.
12        (b) $150 million for the year beginning July 1, 2011, and ending June 30, 2012.
13        (2) In the event that the Director of the State Department of Energy receives applica-



     NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
     New sections are in boldfaced type.

     LC 66
                                           A-Eng. HB 3680


 1   tions for preliminary certification with a total cost in excess of the limitations in subsection
 2   (1) of this section, the director shall allocate the issuance of preliminary certifications ac-
 3   cording to the criteria required by ORS 469.195.
 4       (3) The director shall review applications and issue preliminary certifications:
 5       (a) Within 90 days of the date on which the application is received, in the case of an ap-
 6   plication for certification with a cost of less than $6 million.
 7       (b) Within six months of the date on which the application is received, in the case of an
 8   application for certification with a cost of $6 million or more.
 9       SECTION 3. ORS 315.354 is amended to read:
10       315.354. (1) A credit is allowed against the taxes otherwise due under ORS chapter 316 (or, if
11   the taxpayer is a corporation, under ORS chapter 317 or 318), based upon the certified cost of the
12   facility during the period for which that facility is certified under ORS 469.185 to 469.225. The credit
13   is allowed as follows:
14       (a) Except as provided in paragraph (b) or (c) of this subsection, the credit allowed in each of
15   the first two tax years in which the credit is claimed shall be 10 percent of the certified cost of the
16   facility, but may not exceed the tax liability of the taxpayer. The credit allowed in each of the
17   succeeding three years shall be five percent of the certified cost, but may not exceed the tax liability
18   of the taxpayer.
19       (b) If the certified cost of the facility does not exceed $20,000, the total amount of the credit
20   allowable under subsection (4) of this section may be claimed in the first tax year for which the
21   credit may be claimed, but may not exceed the tax liability of the taxpayer.
22       (c) If the facility uses or produces renewable energy resources or is a renewable energy re-
23   source equipment manufacturing facility, the credit allowed in each of five succeeding tax years
24   shall be 10 percent of the certified cost of the facility, but may not exceed the tax liability of the
25   taxpayer.
26       (2) Notwithstanding subsection (1) of this section:
27       (a) If the facility is one or more renewable energy resource systems installed in a single-family
28   dwelling, the amount of the credit for each system shall be determined as if the facility was con-
29   sidered a residential alternative energy device under ORS 316.116, but subject to the maximum
30   credit amount under subsection (4)(b) of this section;
31       (b) If the facility is a high-performance home, the amount of the credit shall equal the amount
32   determined under paragraph (a) of this subsection plus $3,000; and
33       (c) If the facility is a high-performance home or a homebuilder-installed renewable energy sys-
34   tem, the total amount of the credit may be claimed in the first tax year for which the credit is
35   claimed, but may not exceed the tax liability of the taxpayer.
36       (3) In order for a tax credit to be allowable under this section:
37       (a) The facility must be located in Oregon;
38       (b) The facility must have received final certification from the Director of the State Department
39   of Energy under ORS 469.185 to 469.225;
40       (c) The taxpayer must be an eligible applicant under ORS 469.205 (1)(c); and
41       (d) If the alternative fuel vehicle is a gasoline-electric hybrid vehicle not designed for electric
42   plug-in charging, it must be purchased before January 1, 2010.
43       (4) The total amount of credit allowable to an eligible taxpayer under this section may not ex-
44   ceed:
45       (a) 50 percent of the certified cost of a renewable energy resources facility, a renewable energy


                                                  [2]
                                           A-Eng. HB 3680


 1   resource equipment manufacturing facility or a high-efficiency combined heat and power facility;
 2       (b) $9,000 per single-family dwelling for homebuilder-installed renewable energy systems;
 3       (c) $12,000 per single-family dwelling for homebuilder-installed renewable energy systems, if the
 4   dwelling also constitutes a high-performance home; or
 5       (d) 35 percent of the certified cost of any other facility.
 6       (5)(a) Upon any sale, termination of the lease or contract, exchange or other disposition of the
 7   facility, notice thereof shall be given to the Director of the State Department of Energy, who shall
 8   revoke the certificate covering the facility as of the date of such disposition.
 9       (b) The new owner, or upon re-leasing of the facility, the new lessor, may apply for a new cer-
10   tificate under ORS 469.215[, but]. The new lessor or owner must meet the requirements of ORS
11   469.185 to 469.225 and may claim a tax credit under this section only if all moneys owed to
12   the State of Oregon have been paid, the facility continues to operate and all conditions in the
13   final certification are met. The tax credit available to the new owner shall be limited to the
14   amount of credit not claimed by the former owner or, for a new lessor, the amount of credit not
15   claimed by the lessor under all previous leases.
16       [(b)] (c) The State Department of Energy may not revoke the certificate covering a facility un-
17   der paragraph (a) of this subsection if the tax credit associated with the facility has been transferred
18   to a taxpayer who is an eligible applicant under ORS 469.205 (1)(c)(A).
19       (6) Any tax credit otherwise allowable under this section that is not used by the taxpayer in a
20   particular year may be carried forward and offset against the taxpayer’s tax liability for the next
21   succeeding tax year. Any credit remaining unused in that next succeeding tax year may be carried
22   forward and used in the second succeeding tax year, and likewise, any credit not used in that second
23   succeeding tax year may be carried forward and used in the third succeeding tax year, and likewise,
24   any credit not used in that third succeeding tax year may be carried forward and used in the fourth
25   succeeding tax year, and likewise, any credit not used in that fourth succeeding tax year may be
26   carried forward and used in the fifth succeeding tax year, and likewise, any credit not used in that
27   fifth succeeding tax year may be carried forward and used in the sixth succeeding tax year, and
28   likewise, any credit not used in that sixth succeeding tax year may be carried forward and used in
29   the seventh succeeding tax year, and likewise, any credit not used in that seventh succeeding tax
30   year may be carried forward and used in the eighth succeeding tax year, but may not be carried
31   forward for any tax year thereafter. Credits may be carried forward to and used in a tax year be-
32   yond the years specified in subsection (1) of this section only as provided in this subsection.
33       (7) The credit provided by this section is not in lieu of any depreciation or amortization de-
34   duction for the facility to which the taxpayer otherwise may be entitled for purposes of ORS chapter
35   316, 317 or 318 for such year.
36       (8) The taxpayer’s adjusted basis for determining gain or loss may not be decreased by any tax
37   credits allowed under this section.
38       (9) If a homebuilder claims a credit under this section with respect to a homebuilder-installed
39   renewable energy system or a high-performance home:
40       (a) The homebuilder may not claim credits for both a homebuilder-installed renewable energy
41   system and a high-performance home with respect to the same dwelling;
42       (b) The homebuilder must inform the buyer of the dwelling that the homebuilder is claiming a
43   tax credit under this section with respect to the dwelling; and
44       (c) The buyer of the dwelling may not claim a credit under this section that is based on any
45   facility for which the homebuilder has already claimed a credit.


                                                  [3]
                                            A-Eng. HB 3680


 1       (10) The definitions in ORS 469.185 apply to this section.
 2       SECTION 4. ORS 469.185 is amended to read:
 3       469.185. As used in ORS 469.185 to 469.225 and 469.878:
 4       (1) “Alternative fuel vehicle” means a vehicle as defined by the Director of the State Depart-
 5   ment of Energy by rule that is used primarily in connection with the conduct of a trade or business
 6   and that is manufactured or modified to use an alternative fuel, including but not limited to elec-
 7   tricity, ethanol, methanol, gasohol and propane or natural gas, regardless of energy consumption
 8   savings.
 9       (2) “Car sharing facility” means the expenses of operating a car sharing program, including but
10   not limited to the fair market value of parking spaces used to store the fleet of cars available for
11   a car sharing program, but does not include the costs of the fleet of cars.
12       (3) “Car sharing program” means a program in which drivers pay to become members in order
13   to have joint access to a fleet of cars from a common parking area on an hourly basis. “Car sharing
14   program” does not include operations conducted by car rental agencies.
15       (4) “Cost” means the capital costs and expenses necessarily incurred in the acquisition, erection,
16   construction and installation of a facility, including site development costs and expenses for a
17   sustainable building practices facility.
18       (5) “Energy facility” means any capital investment for which the first year energy savings yields
19   a simple payback period of greater than one year. An energy facility includes:
20       (a) Any land, structure, building, installation, excavation, machinery, equipment or device, or
21   any addition to, reconstruction of or improvement of, land or an existing structure, building, instal-
22   lation, excavation, machinery, equipment or device necessarily acquired, erected, constructed or in-
23   stalled by any person in connection with the conduct of a trade or business and actually used in the
24   processing or utilization of renewable energy resources to:
25       (A) Replace a substantial part or all of an existing use of electricity, petroleum or natural gas;
26       (B) Provide the initial use of energy where electricity, petroleum or natural gas would have been
27   used;
28       (C) Generate electricity to replace an existing source of electricity or to provide a new source
29   of electricity for sale by or use in the trade or business;
30       (D) Perform a process that obtains energy resources from material that would otherwise be solid
31   waste as defined in ORS 459.005; or
32       (E) Manufacture or distribute alternative fuels, including but not limited to electricity, ethanol,
33   methanol, gasohol or biodiesel.
34       (b) Any acquisition of, addition to, reconstruction of or improvement of land or an existing
35   structure, building, installation, excavation, machinery, equipment or device necessarily acquired,
36   erected, constructed or installed by any person in connection with the conduct of a trade or business
37   in order to substantially reduce the consumption of purchased energy.
38       (c) A necessary feature of a new commercial building or multiple unit dwelling, as dwelling is
39   defined by ORS 469.160, that causes that building or dwelling to exceed an energy performance
40   standard in the state building code.
41       (d) The replacement of an electric motor with another electric motor that substantially reduces
42   the consumption of electricity.
43       (6) “Facility” means an energy facility, recycling facility, transportation facility, car sharing
44   facility, sustainable building practices facility, alternative fuel vehicle or facilities necessary to op-
45   erate alternative fuel vehicles, including but not limited to an alternative fuel vehicle refueling


                                                  [4]
                                            A-Eng. HB 3680


 1   station, a high-efficiency combined       heat      and   power   facility,   a   high-performance   home,   a
 2   homebuilder-installed renewable energy system, or a renewable energy resource equipment manu-
 3   facturing facility.
 4         (7) “High-efficiency combined heat and power facility” means a device or equipment that simul-
 5   taneously produces heat and electricity from a single source of fuel and that meets the criteria es-
 6   tablished for a high-efficiency combined heat and power facility under ORS 469.197.
 7         (8) “High-performance home” means a new single-family dwelling that:
 8         (a) Is designed and constructed to reduce net purchased energy through use of both energy ef-
 9   ficiency and on-site renewable energy resources; and
10         (b) Meets the criteria established for a high-performance home under ORS 469.197.
11         (9) “Homebuilder-installed renewable energy system” means a renewable energy resource system
12   that:
13         (a) Meets the criteria established for a renewable energy resource system under ORS 469.197;
14   and
15         (b) Is installed in a new single-family dwelling by, or at the direction of, the homebuilder con-
16   structing the dwelling.
17         (10) “Qualified transit pass contract” means a purchase agreement entered into between a
18   transportation provider and a person, the terms of which obligate the person to purchase transit
19   passes on behalf or for the benefit of employees, students, patients or other individuals over a
20   specified period of time.
21         (11) “Recycling facility” means equipment used by a trade or business solely for recycling:
22         (a) Including:
23         (A) Equipment used solely for hauling and refining used oil;
24         (B) New vehicles or modifications to existing vehicles used solely to transport used recyclable
25   materials that cannot be used further in their present form or location such as glass, metal, paper,
26   aluminum, rubber and plastic;
27         (C) Trailers, racks or bins that are used for hauling used recyclable materials and are added to
28   or attached to existing waste collection vehicles; and
29         (D) Any equipment used solely for processing recyclable materials such as balers, flatteners,
30   crushers, separators and scales.
31         (b) But not including equipment used for transporting or processing scrap materials that are
32   recycled as a part of the normal operation of a trade or business as defined by the director.
33         (12)(a) “Renewable energy resource” includes, but is not limited to:
34         (A) Straw, forest slash, wood waste or other wastes from farm or forest land, nonpetroleum plant
35   or animal based biomass, ocean wave energy, solar energy, wind power, water power or geothermal
36   energy; [or]
37         (B) A hydroelectric generating facility that obtains all applicable permits and complies with all
38   state and federal statutory requirements for the protection of fish and wildlife and:
39         (i) That does not exceed 10 megawatts of installed capacity; or
40         (ii) Qualifies as a research, development or demonstration facility[.]; or
41         (C) A renewable energy storage device as defined by the director by rule.
42         (b) “Renewable energy resource” does not include a hydroelectric generating facility that is not
43   described in paragraph (a) of this subsection.
44         (13) “Renewable energy resource equipment manufacturing facility” means any structure, build-
45   ing, installation, excavation, machinery, equipment or device, or an addition, reconstruction or im-


                                                   [5]
                                            A-Eng. HB 3680


 1   provement to land or an existing structure, building, installation, excavation, machinery, equipment
 2   or device, that is necessarily acquired, constructed or installed by a person in connection with the
 3   conduct of a trade or business, that is used primarily to manufacture equipment, machinery or other
 4   products designed to use a renewable energy resource or to manufacture renewable energy
 5   storage devices and that meets the criteria established under ORS 469.197.
 6       (14) “Sustainable building practices facility” means a commercial building in which building
 7   practices that reduce the amount of energy, water or other resources needed for construction and
 8   operation of the building are used. “Sustainable building practices facility” may be further defined
 9   by the State Department of Energy by rule, including rules that establish traditional building prac-
10   tice baselines in energy, water or other resource usage for comparative purposes for use in deter-
11   mining whether a facility is a sustainable building practices facility.
12       (15) “Transportation facility” means a transportation project that reduces energy use during
13   commuting to and from work or school, during work-related travel, or during travel to obtain med-
14   ical or other services, and may be further defined by the department by rule. “Transportation facil-
15   ity” includes, but is not limited to[,]:
16       (a) A qualified transit pass contract or a transportation services contract[.]; or
17       (b) The purchase of efficient truck technology and related truck trailers, as defined in
18   ORS 801.580, for commercial motor vehicles, as defined in ORS 801.208, that are registered
19   under ORS 803.420, or for commercial motor vehicles that are proportionally registered un-
20   der ORS 826.009 or 826.011.
21       (16) “Transportation provider” means a public, private or nonprofit entity that provides trans-
22   portation services to members of the public.
23       (17) “Transportation services contract” means a contract that is related to a transportation fa-
24   cility, and may be further defined by the department by rule.
25       SECTION 5. ORS 315.357 is amended to read:
26       315.357. [A taxpayer may not be allowed a credit under ORS 315.354 if the first tax year for which
27   the credit with respect to a facility certified under ORS 469.215 would otherwise be allowed begins on
28   or after January 1, 2012.]
29       (1) Except as provided in subsection (2) of this section, a taxpayer may not be allowed a
30   credit under ORS 315.354 unless the taxpayer receives final certification under ORS 469.215
31   before July 1, 2012.
32       (2) A taxpayer may not be allowed a credit under ORS 315.354 for a renewable energy
33   resource equipment manufacturing facility unless the taxpayer receives preliminary certif-
34   ication under ORS 469.210 before January 1, 2014.
35       SECTION 6. ORS 469.195 is amended to read:
36       469.195. (1) In determining the eligibility of [facilities] any facility for tax credits, preference
37   shall be given to those projects [which] that:
38       [(1)] (a) Provide energy savings for real or personal property within the state inhabited as the
39   principal residence of a tenant, including:
40       [(a)] (A) Nonowner occupied single family dwellings; and
41       [(b)] (B) Multiple unit residential housing; or
42       [(2)] (b) Provide long-term energy savings from the use of renewable resources or conservation
43   of energy resources.
44       (2) The Director of the State Department of Energy shall establish by rule a tiered pri-
45   ority system to be used in evaluating applicants for certification of facilities using or


                                                   [6]
                                          A-Eng. HB 3680


 1   producing renewable energy resources. The tier system shall be based upon the projected
 2   costs of facilities. In determining the eligibility for tax credits and in allocating the available
 3   certified cost under section 2 of this 2010 Act among facilities, the director shall subject fa-
 4   cilities with higher projected costs to closer scrutiny, shall compare projects of similar costs
 5   against each other and may base decisions to certify less than the total cost of any facility
 6   on this evaluation. The director shall employ criteria including the following factors as de-
 7   fined by rule:
 8       (a) Technology-specific energy production standards;
 9       (b) Market sector;
10       (c) Delivery of energy into existing distribution and transmission network;
11       (d) Investment payback period;
12       (e) Expected lifespan of the facility;
13       (f) Potential for long-term viability;
14       (g) Environmental standards established by the director;
15       (h) Potential to create and sustain new jobs;
16       (i) Projected siting in a location that is geologically or socioeconomically advantageous;
17       (j) Demonstrated readiness to begin implementation;
18       (k) Amount and quality of energy generated;
19       (L) Strength of business plan;
20       (m) Provision of operations and maintenance data, with appropriate protections for trade
21   secrets consistent with ORS chapter 192;
22       (n) Connection to existing infrastructure;
23       (o) Third-party review of the applicant’s business plan; and
24       (p) Data related to projected return on investment.
25       SECTION 7. ORS 469.197 is amended to read:
26       469.197. The State Department of Energy shall by rule establish all of the following criteria:
27       (1) For a high-performance home, the minimum design and construction standards that must be
28   met or exceeded for a dwelling to be considered a high-performance home, including but not limited
29   to standards for the building envelope, HVAC systems, lighting, appliances, water conservation
30   measures, use of sustainable building materials and on-site renewable energy systems. The criteria
31   must also establish the minimum reduction in estimated net purchased energy that a dwelling must
32   achieve to be considered a high-performance home.
33       (2) For a homebuilder-installed renewable energy system, the minimum performance and effi-
34   ciency standards that a solar electric system, solar domestic water heating system, passive solar
35   space heating system, wind power system, geothermal heating system, fuel cell system or other sys-
36   tem utilizing renewable resources must achieve to be considered a homebuilder-installed renewable
37   energy system.
38       (3) For a high-efficiency combined heat and power facility, the minimum performance and effi-
39   ciency standards that the facility must achieve to be considered a high-efficiency combined heat and
40   power facility.
41       (4) For a renewable energy resource equipment manufacturing facility:
42       (a) Standards relating to the type of equipment, machinery or other products being manufactured
43   and related performance and efficiency standards applicable to the manufactured products;
44       (b) Standards, consistent with the definitions in ORS 469.185, relating to what constitutes a
45   single renewable energy resource equipment manufacturing facility and what constitutes property


                                                  [7]
                                               A-Eng. HB 3680


 1   that is not included within a renewable energy resource equipment manufacturing facility;
 2          (c) Standards relating to the minimum level of increased employment in Oregon for a renewable
 3   energy resource equipment manufacturing facility;
 4          (d) Standards relating to indicators of financial viability of an applicant for preliminary certif-
 5   ication under ORS 469.205;
 6          (e) Standards relating to the likelihood of long-term success of a renewable energy resource
 7   equipment manufacturing facility; and
 8          (f) Standards relating to the likelihood that an applicant seeking preliminary certification of a
 9   renewable energy resource equipment manufacturing facility will base decisions to locate or expand
10   a facility in Oregon on the allowance of a tax credit under ORS 315.354.
11          (5) For a facility using or producing renewable energy resources, standards relating to
12   criteria required under ORS 469.195 (2).
13          (6) Standards, consistent with the definitions in ORS 469.185, relating to what constitutes
14   a single facility.
15          SECTION 8. ORS 469.200 is amended to read:
16          469.200. (1) For a facility, the total cost that receives a preliminary certification from the Di-
17   rector of the State Department of Energy for tax credits in any calendar year may not exceed:
18          (a) $20 million, in the case of a facility using or producing renewable energy resources or a
19   high-efficiency combined heat and power facility;
20          (b) $40 million, in the case of a renewable energy resource equipment manufacturing facility;
21   [or]
22          (c) Five percent of the total cost of the facility but no more than $7 million, in the case
23   of a facility that uses or produces renewable energy resources and is a wind facility with an
24   installed capacity of more than 10 megawatts; or
25          [(c)] (d) $10 million, in the case of any other facility.
26          (2) Notwithstanding subsection (1)(b) of this section, the director may certify a lesser amount
27   than the total cost of the renewable energy resource equipment manufacturing facility, or need not
28   certify any amount, if any of the following conditions exist at the time of preliminary certification:
29          (a) The last quarterly economic and revenue forecast for a biennium indicates that moneys
30   available to the General Fund for the next biennium will be at least three percent less than appro-
31   priations from the General Fund for the current biennium;
32          (b) A quarterly economic and revenue forecast projects that revenues in the General Fund in
33   the current biennium will be at least two percent below what revenues were projected to be in the
34   revenue forecast on which the legislatively adopted budget, as defined in ORS 291.002, for the cur-
35   rent biennium was based;
36          (c) The proposed facility, in the estimate of the director, does not possess the likelihood of suc-
37   cess established in criteria of success under ORS 469.197 (4);
38          (d) The proposed facility, in the estimate of the director, is not likely to increase employment
39   in Oregon to the minimum threshold level established in rules under ORS 469.197 (4);
40          (e) The applicant lacks the minimum level of financial viability established in rules adopted un-
41   der ORS 469.197 (4); or
42          (f) The applicant is unlikely, in the estimate of the director, to base a decision to relocate or
43   expand a facility in Oregon on allowance of the tax credit, given the criteria established in rules
44   under ORS 469.197 (4).
45          (3) The director shall determine the dollar amount certified for any facility and the priority be-


                                                      [8]
                                           A-Eng. HB 3680


 1   tween applications for certification based upon the criteria contained in ORS 469.185 to 469.225 and
 2   applicable rules and standards adopted under ORS 469.185 to 469.225. The director may consider the
 3   status of a facility as a research, development or demonstration facility of new renewable resource
 4   generating and conservation technologies or a qualified transit pass contract in the determination.
 5       SECTION 9. ORS 469.200, as amended by section 8 of this 2010 Act, is amended to read:
 6       469.200. (1) For a facility, the total cost that receives a preliminary certification from the Di-
 7   rector of the State Department of Energy for tax credits in any calendar year may not exceed:
 8       (a) $20 million, in the case of a facility using or producing renewable energy resources or a
 9   high-efficiency combined heat and power facility;
10       (b) $40 million, in the case of a renewable energy resource equipment manufacturing facility;
11       (c) Five percent of the total cost of the facility but no more than [$7 million] $5 million, in the
12   case of a facility that uses or produces renewable energy resources and is a wind facility with an
13   installed capacity of more than 10 megawatts; or
14       (d) $10 million, in the case of any other facility.
15       (2) Notwithstanding subsection (1)(b) of this section, the director may certify a lesser amount
16   than the total cost of the renewable energy resource equipment manufacturing facility, or need not
17   certify any amount, if any of the following conditions exist at the time of preliminary certification:
18       (a) The last quarterly economic and revenue forecast for a biennium indicates that moneys
19   available to the General Fund for the next biennium will be at least three percent less than appro-
20   priations from the General Fund for the current biennium;
21       (b) A quarterly economic and revenue forecast projects that revenues in the General Fund in
22   the current biennium will be at least two percent below what revenues were projected to be in the
23   revenue forecast on which the legislatively adopted budget, as defined in ORS 291.002, for the cur-
24   rent biennium was based;
25       (c) The proposed facility, in the estimate of the director, does not possess the likelihood of suc-
26   cess established in criteria of success under ORS 469.197 (4);
27       (d) The proposed facility, in the estimate of the director, is not likely to increase employment
28   in Oregon to the minimum threshold level established in rules under ORS 469.197 (4);
29       (e) The applicant lacks the minimum level of financial viability established in rules adopted un-
30   der ORS 469.197 (4); or
31       (f) The applicant is unlikely, in the estimate of the director, to base a decision to relocate or
32   expand a facility in Oregon on allowance of the tax credit, given the criteria established in rules
33   under ORS 469.197 (4).
34       (3) The director shall determine the dollar amount certified for any facility and the priority be-
35   tween applications for certification based upon the criteria contained in ORS 469.185 to 469.225 and
36   applicable rules and standards adopted under ORS 469.185 to 469.225. The director may consider the
37   status of a facility as a research, development or demonstration facility of new renewable resource
38   generating and conservation technologies or a qualified transit pass contract in the determination.
39       SECTION 9a. ORS 469.200, as amended by sections 8 and 9 of this 2010 Act, is amended to read:
40       469.200. (1) For a facility, the total cost that receives a preliminary certification from the Di-
41   rector of the State Department of Energy for tax credits in any calendar year may not exceed:
42       (a) $20 million, in the case of a facility using or producing renewable energy resources or a
43   high-efficiency combined heat and power facility;
44       (b) $40 million, in the case of a renewable energy resource equipment manufacturing facility;
45       (c) Five percent of the total cost of the facility but no more than [$5 million] $3 million, in the


                                                  [9]
                                             A-Eng. HB 3680


 1   case of a facility that uses or produces renewable energy resources and is a wind facility with an
 2   installed capacity of more than 10 megawatts; or
 3         (d) $10 million, in the case of any other facility.
 4         (2) Notwithstanding subsection (1)(b) of this section, the director may certify a lesser amount
 5   than the total cost of the renewable energy resource equipment manufacturing facility, or need not
 6   certify any amount, if any of the following conditions exist at the time of preliminary certification:
 7         (a) The last quarterly economic and revenue forecast for a biennium indicates that moneys
 8   available to the General Fund for the next biennium will be at least three percent less than appro-
 9   priations from the General Fund for the current biennium;
10         (b) A quarterly economic and revenue forecast projects that revenues in the General Fund in
11   the current biennium will be at least two percent below what revenues were projected to be in the
12   revenue forecast on which the legislatively adopted budget, as defined in ORS 291.002, for the cur-
13   rent biennium was based;
14         (c) The proposed facility, in the estimate of the director, does not possess the likelihood of suc-
15   cess established in criteria of success under ORS 469.197 (4);
16         (d) The proposed facility, in the estimate of the director, is not likely to increase employment
17   in Oregon to the minimum threshold level established in rules under ORS 469.197 (4);
18         (e) The applicant lacks the minimum level of financial viability established in rules adopted un-
19   der ORS 469.197 (4); or
20         (f) The applicant is unlikely, in the estimate of the director, to base a decision to relocate or
21   expand a facility in Oregon on allowance of the tax credit, given the criteria established in rules
22   under ORS 469.197 (4).
23         (3) The director shall determine the dollar amount certified for any facility and the priority be-
24   tween applications for certification based upon the criteria contained in ORS 469.185 to 469.225 and
25   applicable rules and standards adopted under ORS 469.185 to 469.225. The director may consider the
26   status of a facility as a research, development or demonstration facility of new renewable resource
27   generating and conservation technologies or a qualified transit pass contract in the determination.
28         SECTION 10. ORS 469.205 is amended to read:
29         469.205. (1) Prior to erection, construction, installation or acquisition of a proposed facility, any
30   person may apply to the State Department of Energy for preliminary certification under ORS 469.210
31   if:
32         (a) The erection, construction, installation or acquisition of the facility is to be commenced on
33   or after October 3, 1979;
34         (b) The facility complies with the standards or rules adopted by the Director of the State De-
35   partment of Energy; and
36         (c) The applicant meets one of the following criteria:
37         (A) The applicant is a person to whom a tax credit has been transferred; or
38         (B) The applicant will be the owner or contract purchaser of the facility at the time of erection,
39   construction, installation or acquisition of the proposed facility, and:
40         (i) The applicant is the owner, contract purchaser or lessee of a trade or business that plans to
41   utilize the facility in connection with Oregon property; or
42         (ii) The applicant is the owner, contract purchaser or lessee of a trade or business that plans
43   to lease the facility to a person who will utilize the facility in connection with Oregon property.
44         (2) An application for preliminary certification shall be made in writing on a form prepared by
45   the department and shall contain:


                                                    [10]
                                           A-Eng. HB 3680


 1       (a) A statement that the applicant or the lessee of the applicant’s facility:
 2       (A) Intends to convert from a purchased energy source to a renewable energy resource;
 3       (B) Plans to acquire, construct or install a facility that will use a renewable energy resource
 4   or solid waste instead of electricity, petroleum or natural gas;
 5       (C) Plans to use a renewable energy resource in the generation of electricity for sale or to re-
 6   place an existing or proposed use of an existing source of electricity;
 7       (D) Plans to acquire, construct or install a facility that substantially reduces the consumption
 8   of purchased energy;
 9       (E) Plans to acquire, construct or install equipment for recycling as defined in ORS 469.185 (11);
10       (F) Plans to acquire an alternative fuel vehicle or to convert an existing vehicle to an alterna-
11   tive fuel vehicle;
12       (G) Plans to acquire, construct or install a facility necessary to operate alternative fuel vehicles;
13       (H) Plans to acquire transit passes for use by individuals specified by the applicant;
14       (I) Plans to acquire, construct or install a transportation facility;
15       (J) Plans to acquire a sustainable building practices facility;
16       (K) Plans to acquire a car sharing facility and operate a car sharing program;
17       (L) Plans to construct a high-efficiency combined heat and power facility;
18       (M) Is a homebuilder and plans to construct a homebuilder-installed renewable energy system;
19       (N) Is a homebuilder and plans to construct a high-performance home; or
20       (O) Plans to acquire, construct or install a renewable energy resource equipment manufacturing
21   facility.
22       (b) A detailed description of the proposed facility and its operation and information showing that
23   the facility will operate as represented in the application and remain in operation for at least five
24   years.
25       (c) Information on the amount by which consumption of electricity, petroleum or natural gas by
26   the applicant or the lessee of the applicant’s facility will be reduced, and on the amount of energy
27   that will be produced for sale, as the result of using the facility or, if applicable, information about
28   the expected level of sustainable building practices facility performance.
29       (d) The projected cost of the facility.
30       (e) If applicable, a copy of the proposed qualified transit pass contract, transportation services
31   contract or contract for lease of parking spaces for a car sharing facility.
32       (f) Information on the amount and type of jobs that will be created, the number of jobs
33   sustained throughout the construction, installation and operation of the facility and benefits
34   for other economic activity in this state related to these jobs.
35       (g) Information demonstrating that the proposed facility will comply with applicable state
36   and local laws and regulations and obtain required licenses and permits.
37       (h) Information relating to the criteria required under ORS 469.195.
38       [(f)] (i) Any other information the director considers necessary to determine whether the pro-
39   posed facility is in accordance with the provisions of ORS 469.185 to 469.225, and any applicable
40   rules or standards adopted by the director.
41       (3) An application for preliminary certification shall be accompanied by a fee established under
42   ORS 469.217. The director may refund all or a portion of the fee if the application for certification
43   is rejected.
44       (4) The director may allow an applicant to file the preliminary application or a reapplication
45   under ORS 469.210 (3) after the start of erection, construction, installation or acquisition of the


                                                   [11]
                                            A-Eng. HB 3680


 1   facility if the director finds:
 2        (a) Filing the application before the start of erection, construction, installation or acquisition is
 3   inappropriate because special circumstances render filing earlier unreasonable; and
 4        (b) The facility would otherwise qualify for tax credit certification pursuant to ORS 469.185 to
 5   469.225.
 6        (5) A preliminary certification of a sustainable building practices facility shall be applied for and
 7   issued as prescribed by the department by rule.
 8        (6) A preliminary certification of a renewable energy resource equipment manufacturing facility
 9   shall remain valid for a period of five calendar years after the date the preliminary certification is
10   issued by the director.
11        SECTION 11. ORS 469.210 is amended to read:
12        469.210. (1) The Director of the State Department of Energy may require the submission of plans,
13   specifications and contract terms, and after examination thereof, may request corrections and re-
14   visions of the plans, specifications and terms.
15        (2) If the director determines that the proposed acquisition, erection, construction or installation
16   is technically feasible and should operate in accordance with the representations made by the ap-
17   plicant, and is in accordance with the provisions of ORS 469.185 to 469.225 and any applicable rules
18   or standards adopted by the director, the director shall issue a preliminary certificate approving the
19   acquisition, erection, construction or installation of the facility. The certificate shall indicate the
20   potential amount of tax credit allowable and shall list any conditions for claiming the credit.
21        (3) A preliminary certificate shall remain valid for a period of three calendar years after
22   the date on which the preliminary certificate is issued by the director. The director may
23   extend this period for two additional years upon reapplication and submission of the fee re-
24   quired by ORS 469.205.
25        (4) [If] The director may issue an order altering, conditioning, suspending or denying pre-
26   liminary certification if the director determines that:
27        (a) The acquisition, erection, construction or installation does not comply with the provisions
28   of ORS 469.185 to 469.225 and applicable rules and standards[, the director shall issue an order de-
29   nying certification.];
30        (b) The applicant has previously received preliminary or final certification for the same
31   costs;
32        (c) The applicant is unable to demonstrate that the facility would be economically viable
33   without the allowance of a credit under ORS 315.354;
34        (d) The applicant was directly involved in an act for which the director has levied civil
35   penalties or revoked, canceled or suspended any certification under ORS 469.185 to 469.225;
36   or
37        (e) The applicant or the principal, director, officer, owner, majority shareholder or
38   member of the applicant, or the manager of the applicant if the applicant is a limited liability
39   company, is in arrears for payments owed to any government agency while in any capacity
40   with direct or indirect control over a business.
41        SECTION 12. ORS 469.215 is amended to read:
42        469.215. (1) A final certification may not be issued by the Director of the State Department of
43   Energy under this section unless:
44        (a) The facility was acquired, erected, constructed or installed under a preliminary certificate
45   of approval issued under ORS 469.210 [and];


                                                  [12]
                                            A-Eng. HB 3680


 1       (b) The applicant demonstrates the ability to provide the information required by ORS
 2   469.205 (2) and does not violate any condition that may be imposed as described in ORS
 3   469.210 (4); and
 4       (c) The facility was acquired, erected, constructed or installed in accordance with the ap-
 5   plicable provisions of ORS 469.185 to 469.225 and any applicable rules or standards adopted by the
 6   director.
 7       (2) Any person may apply to the State Department of Energy for final certification of a facility:
 8       (a) If the department issued preliminary certification for the facility under ORS 469.210; and
 9       (b)(A) After completion of erection, construction, installation or acquisition of the proposed fa-
10   cility or, if the facility is a qualified transit pass contract, after entering into the contract with a
11   transportation provider; or
12       (B) After transfer of the facility, as provided in ORS 315.354 (5).
13       (3) An application for final certification shall be made in writing on a form prepared by the
14   department and shall contain:
15       (a) A statement that the conditions of the preliminary certification have been complied with;
16       (b) The actual cost of the facility certified to by a certified public accountant who is not an
17   employee of the applicant or, if the actual cost of the facility is less than $50,000, copies of receipts
18   for purchase and installation of the facility;
19       (c) The amount of the credit under ORS 315.354 that is to be claimed;
20       (d) The number and type of jobs created by the operation and maintenance of the facility
21   over the five-year period beginning with the year of preliminary certification under ORS
22   469.210 and information on benefits for other economic activity in this state related to these
23   jobs;
24       (e) Information sufficient to demonstrate that the facility will remain in operation for
25   at least five years;
26       (f) Information sufficient to demonstrate, in the case of a research, development or
27   demonstration facility that is not in operation, that the applicant has made reasonable ef-
28   forts to make the facility operable and meet the requirements of the preliminary certificate;
29       (g) Documentation of compliance with applicable state and local laws and regulations and
30   licensing and permitting requirements as defined by the director; and
31       [(c) A statement that the facility is in operation or, if not in operation, that the applicant has made
32   every reasonable effort to make the facility operable; and]
33       [(d)] (h) Any other information determined by the director to be necessary prior to issuance of
34   a final certificate, including inspection of the facility by the department.
35       (4) Except as provided in section 2 (3) of this 2010 Act, the director shall act on an appli-
36   cation for certification before the 60th day after the filing of the application under this section. The
37   director may issue the certificate, or certificates for efficient truck technology within a trans-
38   portation facility, together with such conditions as the director determines are appropriate to
39   promote the purposes of ORS 315.354, 469.185 to 469.225 and 469.878. If the applicant is an entity
40   subject to regulation by the Public Utility Commission, the director may consult with the commis-
41   sion prior to issuance of the certificate. The action of the director shall include certification of the
42   actual cost of the facility. [However, the director may not certify an amount for tax credit purposes
43   which is more than 10 percent in excess of the amount approved in the preliminary certificate issued
44   for the facility.]
45       (5) If the director rejects an application for final certification, or certifies a lesser actual cost


                                                  [13]
                                            A-Eng. HB 3680


 1   of the facility than was claimed in the application, the director shall send to the applicant written
 2   notice of the action, together with a statement of the findings and reasons therefor, by certified mail,
 3   before the 60th day after the filing of the application. Failure of the director to act constitutes re-
 4   jection of the application.
 5        (6) Upon approval of an application for final certification of a facility, the director shall certify
 6   the facility. Each certificate shall bear a separate serial number for each device.        Where one or
 7   more devices constitute an operational unit, the director may certify the operational unit under one
 8   certificate.
 9        SECTION 13. ORS 469.220 is amended to read:
10        469.220. (1) A certificate issued under ORS 469.215 is required for purposes of obtaining tax
11   credits in accordance with ORS 315.354. Such certification shall be granted for a period not to ex-
12   ceed five years. The five-year period shall begin with the tax year of the applicant during which [a
13   certified facility is placed into operation, or the year] the facility is certified under ORS 469.215[, at
14   the election of the applicant].
15        (2) Notwithstanding subsection (1) of this section, for a facility using or producing
16   renewable energy resources with a certified cost that exceeds $10 million and that receives
17   final certification under ORS 469.215 after January 1, 2010, the five-year period shall begin
18   with the tax year immediately following the tax year during which the facility is certified
19   under ORS 469.215.
20        SECTION 14. ORS 469.225 is amended to read:
21        469.225. (1) Under the procedures for a contested case under ORS chapter 183, the Director of
22   the State Department of Energy may order the suspension or revocation of the certificate issued
23   under ORS 469.215 if the director finds that:
24        (a) The certification was obtained by fraud or misrepresentation; [or]
25        (b) The holder of the certificate or the operator of the facility has failed to construct or op-
26   erate the facility in compliance with the plans, specifications and procedures in the certificate[.];
27   or
28        (c) The facility is no longer in operation.
29        (2) As soon as the order of revocation under this section becomes final, the director shall notify
30   the Department of Revenue, the facility owner and any transferee under ORS 469.206 of the
31   order of revocation.
32        (3) If the certificate is issued for a facility that is not a renewable energy resource equipment
33   manufacturing facility and is ordered revoked pursuant to subsection (1)(a) of this section, all prior
34   tax credits provided to the holder of the certificate by virtue of the certificate shall be forfeited and
35   upon notification under subsection (2) of this section the Department of Revenue immediately shall
36   proceed to collect those taxes not paid by the certificate holder as a result of the tax credits pro-
37   vided to the holder under ORS 315.354.
38        (4) If the certificate is issued for a renewable energy resource equipment manufacturing facility
39   and is ordered suspended or revoked, upon notification under subsection (2) of this section the
40   Department of Revenue immediately shall proceed to collect:
41        (a) In the case where no portion of a certificate has been transferred under ORS 469.206, those
42   taxes not paid by the certificate holder as a result of the tax credits provided to the certificate
43   holder under ORS 315.354, from the certificate holder or a successor in interest to the business in-
44   terests of the certificate holder. All prior tax credits provided to the holder of the certificate by
45   virtue of the certificate shall be forfeited.


                                                     [14]
                                           A-Eng. HB 3680


 1       (b) In the case where all or a portion of a certificate has been transferred under ORS 469.206,
 2   the maximum theoretical amount of the tax credits allowable under ORS 315.354, from the
 3   transferor.
 4       (5)(a) The Department of Revenue shall have the benefit of all laws of this state pertaining to
 5   the collection of income and excise taxes and may proceed to collect the amounts described in
 6   subsection (3) or (4) of this section from the person that obtained certification from the State De-
 7   partment of Energy or any successor in interest to the business interests of that person. No as-
 8   sessment of tax shall be necessary and no statute of limitation shall preclude the collection of taxes
 9   described in this subsection.
10       (b) For purposes of this subsection, a lender, bankruptcy trustee or other person that acquires
11   an interest through bankruptcy or through foreclosure of a security interest is not considered to be
12   a successor in interest to the business interests of the person that obtained certification from the
13   State Department of Energy.
14       (6) If the certificate is issued for a facility that is not a renewable energy resource equipment
15   manufacturing facility and is ordered revoked pursuant to subsection (1)(b) of this section, the cer-
16   tificate holder shall be denied any further relief under ORS 315.354 in connection with the facility
17   from and after the date that the order of revocation becomes final.
18       (7) Notwithstanding subsections (1) to (6) of this section, a certificate or portion of a certificate
19   held by a transferee under ORS 469.206 may not be considered revoked for purposes of the
20   transferee, the tax credit allowable to the transferee under ORS 315.354 may not be reduced and a
21   transferee is not liable under subsections (3) to (5) of this section.
22       SECTION 15. (1) Section 2 of this 2010 Act and the amendments to ORS 315.357, 469.185,
23   469.195, 469.197, 469.205, 469.210 and 469.215 by sections 4 to 7 and 10 to 12 of this 2010 Act
24   apply to preliminary certifications issued under ORS 469.210 on or after July 1, 2009.
25       (2) The amendments to ORS 469.200 by section 8 of this 2010 Act apply to preliminary
26   certifications issued under ORS 469.210 on or after January 1, 2010, and before January 1,
27   2011.
28       (3) The amendments to ORS 469.200 by section 9 of this 2010 Act apply to preliminary
29   certifications issued under ORS 469.210 on or after January 1, 2011, and before January 1,
30   2012.
31       (4) The amendments to ORS 469.200 by section 9a of this 2010 Act apply to preliminary
32   certifications issued under ORS 469.210 on or after January 1, 2012.
33       (5) The amendments to ORS 469.220 by section 13 of this 2010 Act apply to final certif-
34   ications issued under ORS 469.215 on or after January 1, 2010.
35       (6) The amendments to ORS 315.354 and 469.225 by sections 3 and 14 of this 2010 Act apply
36   to tax years beginning on or after January 1, 2009, and any tax year for which a taxpayer
37   may file an amended return or for which the Department of Revenue may issue a notice of
38   deficiency.
39       SECTION 16. This 2010 Act takes effect on the 91st day after the date on which the