House Amendments to A-Engrossed — SB 384 (2011R1)
This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.
Other indexed documents for this measure (9)
- Staff Measure Summary — SB 384 (2011R1)
- Staff Measure Summary — SB 384 (2011R1)
- A-Engrossed — SB 384 (2011R1)
- B-Engrossed — SB 384 (2011R1)
- Enrolled — SB 384 (2011R1)
- House Amendments to A-Engrossed — SB 384 (2011R1) · open
- Introduced — SB 384 (2011R1)
- Senate Amendments — SB 384 (2011R1)
- OLIS measure summary
Recorded legislative activity (37)
- Introduction and First Reading Of Senate Measures
- Introduction and first reading. Referred to President's desk.
- Referred to Business, Transportation and Economic Development.
- Heard
- Public Hearing held.
- Heard
- Work Session held.
- Heard and Reported Out with Amendments
- Work Session held.
- Recommendation: Do pass with amendments. (Printed A-Eng.)
- Second Reading Of Senate Measures
- Second reading.
- Third Reading Of Senate Measures
- Third reading. Carried by Atkinson. Passed.
- First Reading Of Senate Bills
- First Reading Of Senate Bills
- First reading. Referred to the desks of the Co-Speakers.
- Referred to Business and Labor.
- Heard
- Public Hearing and Work Session held.
- Heard and Reported Out with Amendments
- Work Session held.
- Recommendation: Do pass with amendments and be printed B-Engrossed.
- Second Reading Of Senate Bills
- Second reading.
- Rules suspended. Carried over to June 10, 2011 Calendar.
- Rules suspended. Carried over to June 13, 2011 Calendar.
- Third reading. Carried by Johnson. Passed.
- Potential conflict(s) of interest declared by Boone, Johnson, Schaufler, Thatcher, Wand.
- Third Reading Of Senate Bills
- Possible Consideration of House Amendments
- Senate concurred in House amendments and repassed bill.
- President signed.
- Co-Speakers signed.
- Governor signed.
- Chapter 553, 2011 Laws.
- Effective date, January 1, 2012.
Citation and provenance
Oregon Legislature. House Amendments to A-Engrossed — SB 384 (2011R1). 2011 Regular Session. https://olis.oregonlegislature.gov/liz/2011R1/Downloads/MeasureDocument/SB384/House Amendments to A-Engrossed Retrieved 2026-09-02.
Document ID: doc_aed5af05525d09a8620c
Original SHA-256: f079a69ccb9b44768e09166ba6a66caaa02f604d43822f0d3682a51a123ee098
Extracted text SHA-256: 325205424bc0a6d345728fa5d54e0459da47dd09b1238eeeb57417bc4fbeccbc
76th OREGON LEGISLATIVE ASSEMBLY--2011 Regular Session
HOUSE AMENDMENTS TO
A-ENGROSSED SENATE BILL 384
By COMMITTEE ON BUSINESS AND LABOR
June 6
1 On page 1 of the printed A-engrossed bill, delete lines 5 through 26 and delete pages 2 through
2 8 and insert:
3 “ SECTION 1. ORS 701.620 is amended to read:
4 “701.620. As used in ORS 701.620 to 701.640:
5 “(1) ‘Construction contract’ means a written or oral construction agreement, including all
6 [plans,] drawings, specifications and addenda relating to:
7 “(a) Excavating, landscaping, demolishing and detaching existing structures, leveling, filling in
8 and other preparation of land for the making and placement of a building, structure or superstruc-
9 ture;
10 “(b) Creation or making of a building, structure or superstructure; and
11 “(c) Alteration, partial construction and repairs done in and upon a building, structure or
12 superstructure.
13 “(2) ‘Contractor’ has the meaning given that term in ORS 87.005.
14 “(3) ‘Days’ means calendar days.
15 “(4) ‘Material supplier’ means any person providing materials or products under a construction
16 contract by [any contractual means including] oral authorization, written contract, purchase order,
17 price agreement, [or] rental agreement or other contractual means.
18 “(5) ‘Original contractor’ has the meaning given that term in ORS 87.005.
19 “(6) ‘Owner’ has the meaning given that term in ORS 701.410.
20 “(7) ‘Subcontractor’ has the meaning given that term in ORS 87.005.
21 “ SECTION 2. ORS 701.625 is amended to read:
22 “701.625. [(1) By mutual agreement with an original contractor, an owner may make progress
23 payments to the original contractor on a construction contract that is anticipated to last less than 60
24 days. An owner shall make progress payments to the original contractor on all other construction
25 contracts. Progress payments shall be made on the basis of a certified billing or estimate for the work
26 performed and the materials or products supplied during the preceding 30-day billing cycle, or an al-
27 ternate billing cycle as stated in the construction contract. If billings or estimates are to be submitted
28 in alternate, rather than 30-day billing cycles, the construction contract shall specify the alternate bill-
29 ing cycles in a clear and conspicuous manner as prescribed in subsection (2) of this section. Except as
30 provided in subsection (3) of this section, the owner shall make progress payments to the original con-
31 tractor within 14 days after the date the billing is submitted pursuant to subsection (4) of this
32 section.]
33 “ (1) If a construction contract is for construction work that is expected to take 60 or
34 more days to complete, an owner shall make progress payments to the original contractor.
35 By mutual agreement with an original contractor, an owner may make progress payments
LC 467/SB 384-A3
1 to the original contractor under a construction contract for which the construction work is
2 expected to take less than 60 days to complete.
3 “(2) [A construction contract may provide for an alternate billing cycle if the plans and specifica-
4 tions specifically set forth] The owner shall make progress payments on the basis of a certified
5 billing or estimate for work performed, and for materials or products supplied, during the
6 preceding monthly billing cycle or during an alternative billing cycle identified in the con-
7 struction contract. If a construction contract identifies an alternative billing cycle, the con-
8 struction contract must expressly state in a clear and conspicuous manner that there is an
9 [alternate] alternative billing cycle and the owner [provides for] must provide on each page of
10 [plans] drawings and specifications in the construction contract a statement substantially similar
11 to the following [statement]:
12 “ _____________________________________________________________________________________
13
14 Notice of [Alternate] Alternative Billing Cycle
15
16 The construction contract will allow the owner to require the submission of billings or esti-
17 mates in billing cycles other than [30-day] monthly cycles. Billings or estimates for the con-
18 struction contract shall be submitted as follows:
19 ___________________________________________________________________________________
20
21 ___________________________________________________________________________________
22
23 ___________________________________________________________________________________
24
25 “ _____________________________________________________________________________________
26
27 “(3)(a) Except as provided in this subsection, the owner shall:
28 “(A) Make progress payments no later than 14 days after the date the billing is received;
29 and
30 “(B) Make final payment of all remaining amounts no later than seven days after the
31 date that the owner approves the work.
32 “(b) An owner may make progress payments or final payment later than [14 days after the date
33 the billing or estimate is submitted] the time allowed under paragraph (a) of this subsection if:
34 “[(a)] (A) The owner [is responsible for providing plans] provides drawings and specifications
35 that expressly [allow] state in a clear and conspicuous manner that an extended payment[, defined
36 by a specified] period is allowed and identify the extended payment period as a specific number
37 of days after the date that the billing or estimate is [submitted] received or the date that the
38 owner approves all work; and
39 “[(b)] (B) The owner provides [for] on each page of [plans] drawings and specifications a
40 statement substantially similar to the following [statement]:
41 “ _____________________________________________________________________________________
42
43 Notice of Extended Payment Provision
44
45 The construction contract will allow the owner to make [payment within]:
HA to A-Eng. SB 384 Page 2
1 1) Progress payments no later than days after the date a billing or estimate is
2 [submitted] received.
3 2) Final payment of all remaining amounts no later than _____ days after the date the
4 owner approves all work.
5 “ _____________________________________________________________________________________
6
7 “ (4) Payment is not required under this section unless the owner receives from the ori-
8 ginal contractor a billing or estimate for the work performed or the materials or products
9 supplied in accordance with the terms of the construction contract.
10 “[(4)] (5) The owner is deemed to have received the billing or estimate when the billing or es-
11 timate is [submitted to] received by any person designated by the owner for the receipt, review or
12 approval of the billing or estimate. A billing or estimate is deemed to be certified 10 days after the
13 owner receives the billing or estimate, unless before that time the owner or the owner’s agent pre-
14 pares and issues a written statement detailing those items in the billing or estimate that are not
15 approved. An owner may decline to approve a billing or estimate or portion of a billing or estimate
16 [for] because of:
17 “(a) Unsatisfactory work progress;
18 “(b) Defective construction work, materials or products not remedied;
19 “(c) Disputed work, materials or products, except that the declined amount may not [to] ex-
20 ceed 150 percent of the amount in dispute;
21 “(d) Failure to comply with other material provisions of the construction contract;
22 “(e) A third party [claims] claim being filed or reasonable evidence that [such] a third party
23 claim will be filed;
24 “(f) Failure of the original contractor or a subcontractor to make timely payments to subcon-
25 tractors and material suppliers for labor, equipment, materials and products;
26 “(g) Damage to the owner;
27 “(h) Reasonable evidence that the construction contract cannot be completed for the unpaid
28 balance of the construction contract sum; or
29 “(i) Other items as allowed under the construction contract terms and conditions.
30 “[(5) An owner may withhold from a progress payment an amount that is sufficient to pay the di-
31 rect expenses the owner reasonably expects to incur to correct any items set forth in writing pursuant
32 to subsection (4) of this section. The owner may also withhold a reasonable amount as retainage as
33 defined in ORS 701.410.]
34 “(6) An owner may extend the period within which the billing or estimate may be certified if:
35 “(a) The owner [is responsible for providing plans] provides drawings and specifications that
36 expressly allow in a clear and conspicuous manner an extended period within which a billing or
37 estimate may be certified; and
38 “(b) The owner provides for each page of [plans] drawings and specifications, including bid
39 [plans and construction plans,] drawings and specifications and construction drawings and
40 specifications, a statement substantially similar to the following statement:
41 “ _____________________________________________________________________________________
42
43 Notice of
44 Extended Certification Period Provision
45
HA to A-Eng. SB 384 Page 3
1 The construction contract will allow the owner to certify billings and estimates [within] no
2 later than days after the billings and estimates are received from the original contractor.
3 “ _____________________________________________________________________________________
4
5 “ (7) Any requirement under this section that a statement be provided on a page of
6 drawings or specifications may be satisfied by placing the required statement on either side
7 of the page.
8 “[(7)] (8) After a subcontractor or material supplier submits a bid or proposal or other written
9 pricing information to an original contractor, an owner and the original contractor may agree in
10 writing to change the specified number of days after certification during which the owner may
11 make payment to the original contractor or within which the owner must certify a billing or esti-
12 mate. The billings by any [original contractor,] subcontractor or material supplier that does not
13 provide written consent to the change [will continue to be paid as] remain subject to the certif-
14 ication period indicated in the [plans] drawings and specifications. A construction contract may
15 not be changed in a manner that alters the right of any subcontractor or material supplier
16 to receive prompt and timely progress payments as provided under ORS 701.630.
17 “(9) An owner may withhold from a progress payment an amount that is sufficient to pay
18 the direct expenses the owner reasonably expects to incur to correct any items detailed in
19 a written statement under subsection (5) of this section. The owner may also withhold a
20 reasonable amount as retainage. As used in this subsection, ‘retainage’ has the meaning
21 given that term in ORS 701.410.
22 “[(8)] (10) When an original contractor completes and an owner approves all work under a
23 construction contract, the owner shall make payment in full of all remaining amounts due on the
24 construction contract [within seven days] as described in subsection (3) of this section. When an
25 original contractor completes and an owner approves all work under a portion of a construction
26 contract for which the construction contract states a separate price, the owner shall make payment
27 in full of all remaining amounts due on that portion of the construction contract, subject to the
28 satisfaction of any [issue described in] items detailed under subsection [(4)] (5) of this section or
29 ORS 701.630 (4).
30 “[(9) Payment is not required under this section unless the original contractor provides the owner
31 with a billing or estimate for the work performed or the materials or products supplied in accordance
32 with the terms of the construction contract between the parties.]
33 “[(10) A construction contract may not alter the right of any original contractor, subcontractor or
34 material supplier to receive prompt and timely progress payments as provided under this section.]
35 “(11) If an owner or a person designated by the owner as responsible for making progress pay-
36 ments on a construction contract does not make a timely payment under this section, the owner
37 shall pay the original contractor interest on the unpaid balance at the rate of one and one-half
38 percent a month or fraction of a month, or at a higher rate as the parties to the construction con-
39 tract may agree.
40 “(12) On the written request of a subcontractor, the owner shall notify the subcontractor
41 [within] no later than five days after the issuance of a progress payment to the original contractor.
42 On the written request of a subcontractor, the owner shall notify the subcontractor [within] no later
43 than five days after the owner makes the final payment to the original contractor on the con-
44 struction contract.
45 “[(13) In any action, claim or arbitration brought to collect payments or interest pursuant to this
HA to A-Eng. SB 384 Page 4
1 section, the prevailing party shall be awarded reasonable costs and attorney fees.]
2 “[(14)] (13) If the owner and original contractor are a single entity, that entity shall [pay] make
3 progress and final payments to subcontractors and material suppliers [within 14 days after the
4 billing or estimate is received unless the deadlines for certification or payment have been modified
5 pursuant to] as described in subsection (3) or (6) of this section.
6 “ (14) In any action, claim or arbitration brought to collect interest pursuant to this
7 section, the prevailing party shall be awarded costs and reasonable attorney fees.
8 “ SECTION 3. ORS 701.630 is amended to read:
9 “701.630. (1) [Performance by] An original contractor, subcontractor or material supplier [in ac-
10 cordance with the provisions of a construction contract entitles the original contractor, subcontractor
11 or material supplier] that performs in accordance with a construction contract is entitled to
12 payment from the party with whom the original contractor, subcontractor or material supplier con-
13 tracts.
14 “[(2) If a subcontractor or material supplier has performed in accordance with the provisions of a
15 construction contract, the original contractor shall pay to the subcontractor or material supplier, and
16 each subcontractor shall pay to its subcontractors or material suppliers, the full amount received for
17 such subcontractor’s work and for materials and products supplied based on the subcontract or pur-
18 chase order terms and conditions within seven days of receipt by the original contractor or subcon-
19 tractor of a progress payment or final payment.]
20 “ (2)(a) If a subcontractor has performed in accordance with a construction contract, and
21 the original contractor receives payment from the owner for work performed by the sub-
22 contractor, the original contractor shall pay the subcontractor for that work no later than
23 seven days after the original contractor receives the payment. If a material supplier has
24 performed in accordance with a construction contract, and the original contractor receives
25 payment from the owner for materials or products provided by the material supplier, the
26 original contractor shall pay the material supplier for those materials and products no later
27 than seven days after the original contractor receives the payment. An original subcontrac-
28 tor that receives payment under this subsection for work provided to the original subcon-
29 tractor by another subcontractor, or for materials or products provided to the original
30 subcontractor, shall pay the other subcontractor or material supplier for the work, materials
31 or products no later than seven days after the original subcontractor receives the payment.
32 “(b) Payment is not required under this subsection unless a subcontractor or material supplier
33 provides to the original contractor or subcontractor a billing or invoice for the work performed or
34 materials or products supplied in compliance with the terms of the contract between the parties.
35 Each subcontractor or material supplier must provide an appropriate waiver of any [mechanic’s or
36 materialman’s] lien for labor, equipment, services, materials or products in accordance with
37 subcontract or purchase order terms and conditions. The original contractor or subcontractor may
38 require that such waivers of lien be notarized.
39 “(3) Any failure to reasonably account for the application or use of payments, as proven in a
40 legal proceeding authorized under the terms of the construction contract, may constitute grounds
41 for disciplinary action by the Construction Contractors Board under ORS 701.098.
42 “(4) [Nothing in this section prevents] An original contractor [when submitting a bill] that sub-
43 mits a billing or estimate to an owner, or [a] an original subcontractor [when submitting a bill]
44 that submits a billing or estimate to the original contractor, [from omitting from the bill] may omit
45 from the billing or estimate amounts to be withheld from payment to a subcontractor or material
HA to A-Eng. SB 384 Page 5
1 supplier [for] because of:
2 “(a) Unsatisfactory work progress;
3 “(b) Defective construction work, materials or products not remedied;
4 “(c) Disputed work, materials or products, except that the withheld amount may not [to] ex-
5 ceed 150 percent of the amount in dispute;
6 “(d) Failure to comply with other material provisions of the construction contract;
7 “(e) A third party [claims] claim being filed or reasonable evidence that [such] a third party
8 claim will be filed;
9 “(f) Failure of the subcontractor to make timely payments to subcontractors and material sup-
10 pliers for labor, equipment, materials and products;
11 “(g) Damage to an original contractor, subcontractor or material supplier;
12 “(h) Reasonable evidence that the subcontract cannot be completed for the unpaid balance of
13 the subcontract sum; or
14 “[(i) A reasonable amount for retainage, as defined in ORS 701.410, that does not exceed the actual
15 percentage allowed by the subcontract or purchase order; or]
16 “[(j)] (i) Other items as allowed under the subcontract or purchase order terms and conditions.
17 “ (5) An original contractor or original subcontractor may also omit from a billing or es-
18 timate a reasonable amount for retainage, except that the amount omitted may not exceed
19 the actual percentage allowed by the construction contract, subcontract or purchase order.
20 As used in this subsection, ‘retainage’ has the meaning given that term in ORS 701.410.
21 “[(5)] (6) If a progress or final payment to a subcontractor or material supplier is delayed by
22 more than seven days after receipt of a progress or final payment by an original contractor or
23 subcontractor, the original contractor or subcontractor shall pay its subcontractor or material sup-
24 plier interest beginning on the eighth day, except during periods of time during which payment is
25 withheld pursuant to subsection (4) or (5) of this section, at the rate of one and one-half percent a
26 month or a fraction of a month on the unpaid balance or at such higher rate as the parties agree.
27 “[(6)] (7) In any action, claim or arbitration brought to collect [payments or] interest under this
28 section, the prevailing party shall be awarded [reasonable] costs and reasonable attorney fees.
29 “ SECTION 4. ORS 701.635 is amended to read:
30 “701.635. (1) An original contractor may suspend performance under a construction contract, or
31 if performance is suspended for longer than one month may terminate a construction
32 contract, if [performance is suspended for longer than 30 days, for failure by] the owner fails to make
33 timely payment of the amount certified under ORS 701.625. An original contractor shall provide
34 written notice to an owner at least seven days before the original contractor suspends performance
35 or terminates the construction contract, unless a shorter notice period is prescribed in the con-
36 struction contract. An original contractor may not be deemed in breach of a construction contract
37 for suspending performance or terminating a construction contract pursuant to this subsection. A
38 construction contract may not extend the notice period under this subsection.
39 “(2) A subcontractor may suspend performance under a construction contract, or if perform-
40 ance is suspended for longer than one month may terminate a construction contract, if [per-
41 formance is suspended for longer than 30 days, for failure by] the owner fails to make timely payment
42 of amounts certified under ORS 701.625 or the subcontractor [fails to] does not receive payment for
43 the certified work under ORS 701.630 (2). A subcontractor shall provide written notice to the ori-
44 ginal contractor and owner at least three days before the subcontractor suspends performance or
45 terminates the construction contract, unless a shorter notice period is prescribed in the con-
HA to A-Eng. SB 384 Page 6
1 struction contract. A subcontractor may not be deemed in breach of a construction contract for
2 suspending performance or terminating a construction contract pursuant to this subsection. A
3 construction contract may not extend the notice period under this subsection.
4 “(3) A subcontractor may suspend performance under a construction contract, or if perform-
5 ance is suspended for longer than one month may terminate a construction contract, [if per-
6 formance is suspended for longer than 30 days,] if the owner makes timely payment of amounts
7 certified under ORS 701.625 for the subcontractor’s work but the original contractor fails to pay the
8 subcontractor for the certified work. A subcontractor shall provide written notice to the original
9 contractor and owner at least seven days before the subcontractor suspends performance or termi-
10 nates the construction contract, unless a shorter notice period is prescribed in the construction
11 contract. A subcontractor may not be deemed in breach of a construction contract for suspending
12 performance or terminating a construction contract pursuant to this subsection. A construction
13 contract may not extend the notice period under this subsection.
14 “(4) A subcontractor may suspend performance under a construction contract, or if perform-
15 ance is suspended for longer than one month may terminate a construction contract, [if per-
16 formance is suspended for longer than 30 days,] if the owner declines or fails to approve portions
17 of the contractor’s billing or estimate under ORS 701.625 for that subcontractor’s work [but] and the
18 reasons for [that failure] nonapproval are not the fault of or directly related to the subcontractor’s
19 work. A subcontractor shall provide written notice to the original contractor and the owner at least
20 seven days before the subcontractor suspends performance or terminates the construction contract,
21 unless a shorter notice period is prescribed in the construction contract. A subcontractor may not
22 be deemed in breach of a construction contract for suspending performance or terminating a con-
23 struction contract pursuant to this subsection. A construction contract may not extend the notice
24 period under this subsection.
25 “(5) A contractor or subcontractor may not submit a notice of suspension under this section
26 until the lawful period for payment to the contractor or subcontractor has expired.
27 “(6) An original contractor or subcontractor that suspends performance as provided in this
28 section [is not required to furnish further labor, materials, products or services until the original con-
29 tractor or subcontractor is paid the amount that was certified under ORS 701.625, together with] may
30 condition the supplying of further labor, equipment, services, materials or products upon the
31 owner or original contractor paying, in addition to any amounts certified under ORS 701.625,
32 any documented, substantial and reasonably incurred costs for mobilization resulting from the
33 shutdown or start-up of a project.
34 “(7) In any action, claim or arbitration brought pursuant to this section, the prevailing party
35 shall be awarded [reasonable] costs and reasonable attorney fees.
36 “(8) Written notice required under this section is deemed to have been provided if the notice:
37 “(a) Is delivered in person to the owner, original contractor, subcontractor or a person desig-
38 nated by the owner, original contractor or subcontractor to receive notice; or
39 “(b) Is delivered by certified mail, return receipt requested, or other means that provides writ-
40 ten, third party verification of delivery to the last business address of the owner, original contractor
41 or subcontractor known to the party giving notice.
42 “ SECTION 5. ORS 701.640 is amended to read:
43 “701.640. (1) A construction contract may not include any provision, covenant or clause that:
44 “(a) Makes the construction contract subject to the laws of another state or that requires any
45 litigation, arbitration or other dispute resolution proceeding arising from the construction contract
HA to A-Eng. SB 384 Page 7
1 to be conducted in another state; or
2 “(b) States that a party to the construction contract cannot suspend performance under the
3 construction contract or terminate the construction contract if another party to the construction
4 contract fails to make prompt payments under the construction contract pursuant to ORS 701.620
5 to 701.640.
6 “(2) Any provision, covenant or clause described in subsection (1) of this section is void and
7 unenforceable.
8 “ SECTION 6. The amendments to ORS 701.620, 701.625, 701.630, 701.635 and 701.640 by
9 sections 1 to 5 of this 2011 Act apply to construction contracts that an owner enters into on
10 or after the effective date of this 2011 Act.”.
11
HA to A-Eng. SB 384 Page 8