House Amendments to A-Engrossed — SB 384 (2011R1)

This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.

Other indexed documents for this measure (9)
Recorded legislative activity (37)
  1. Introduction and First Reading Of Senate Measures
  2. Introduction and first reading. Referred to President's desk.
  3. Referred to Business, Transportation and Economic Development.
  4. Heard
  5. Public Hearing held.
  6. Heard
  7. Work Session held.
  8. Heard and Reported Out with Amendments
  9. Work Session held.
  10. Recommendation: Do pass with amendments. (Printed A-Eng.)
  11. Second Reading Of Senate Measures
  12. Second reading.
  13. Third Reading Of Senate Measures
  14. Third reading. Carried by Atkinson. Passed.
  15. First Reading Of Senate Bills
  16. First Reading Of Senate Bills
  17. First reading. Referred to the desks of the Co-Speakers.
  18. Referred to Business and Labor.
  19. Heard
  20. Public Hearing and Work Session held.
  21. Heard and Reported Out with Amendments
  22. Work Session held.
  23. Recommendation: Do pass with amendments and be printed B-Engrossed.
  24. Second Reading Of Senate Bills
  25. Second reading.
  26. Rules suspended. Carried over to June 10, 2011 Calendar.
  27. Rules suspended. Carried over to June 13, 2011 Calendar.
  28. Third reading. Carried by Johnson. Passed.
  29. Potential conflict(s) of interest declared by Boone, Johnson, Schaufler, Thatcher, Wand.
  30. Third Reading Of Senate Bills
  31. Possible Consideration of House Amendments
  32. Senate concurred in House amendments and repassed bill.
  33. President signed.
  34. Co-Speakers signed.
  35. Governor signed.
  36. Chapter 553, 2011 Laws.
  37. Effective date, January 1, 2012.
Citation and provenance

Oregon Legislature. House Amendments to A-Engrossed — SB 384 (2011R1). 2011 Regular Session. https://olis.oregonlegislature.gov/liz/2011R1/Downloads/MeasureDocument/SB384/House Amendments to A-Engrossed Retrieved 2026-09-02.

Document ID: doc_aed5af05525d09a8620c

Original SHA-256: f079a69ccb9b44768e09166ba6a66caaa02f604d43822f0d3682a51a123ee098

Extracted text SHA-256: 325205424bc0a6d345728fa5d54e0459da47dd09b1238eeeb57417bc4fbeccbc

                            76th OREGON LEGISLATIVE ASSEMBLY--2011 Regular Session



                              HOUSE AMENDMENTS TO
                           A-ENGROSSED SENATE BILL 384
                                    By COMMITTEE ON BUSINESS AND LABOR

                                                       June 6

 1       On page 1 of the printed A-engrossed bill, delete lines 5 through 26 and delete pages 2 through
 2   8 and insert:
 3       “ SECTION 1. ORS 701.620 is amended to read:
 4       “701.620. As used in ORS 701.620 to 701.640:
 5       “(1) ‘Construction contract’ means a written or oral construction agreement, including all
 6   [plans,] drawings, specifications and addenda relating to:
 7       “(a) Excavating, landscaping, demolishing and detaching existing structures, leveling, filling in
 8   and other preparation of land for the making and placement of a building, structure or superstruc-
 9   ture;
10       “(b) Creation or making of a building, structure or superstructure; and
11       “(c) Alteration, partial construction and repairs done in and upon a building, structure or
12   superstructure.
13       “(2) ‘Contractor’ has the meaning given that term in ORS 87.005.
14       “(3) ‘Days’ means calendar days.
15       “(4) ‘Material supplier’ means any person providing materials or products under a construction
16   contract by [any contractual means including] oral authorization, written contract, purchase order,
17   price agreement, [or] rental agreement or other contractual means.
18       “(5) ‘Original contractor’ has the meaning given that term in ORS 87.005.
19       “(6) ‘Owner’ has the meaning given that term in ORS 701.410.
20       “(7) ‘Subcontractor’ has the meaning given that term in ORS 87.005.
21       “ SECTION 2. ORS 701.625 is amended to read:
22       “701.625. [(1) By mutual agreement with an original contractor, an owner may make progress
23   payments to the original contractor on a construction contract that is anticipated to last less than 60
24   days. An owner shall make progress payments to the original contractor on all other construction
25   contracts. Progress payments shall be made on the basis of a certified billing or estimate for the work
26   performed and the materials or products supplied during the preceding 30-day billing cycle, or an al-
27   ternate billing cycle as stated in the construction contract. If billings or estimates are to be submitted
28   in alternate, rather than 30-day billing cycles, the construction contract shall specify the alternate bill-
29   ing cycles in a clear and conspicuous manner as prescribed in subsection (2) of this section. Except as
30   provided in subsection (3) of this section, the owner shall make progress payments to the original con-
31   tractor within 14 days after the date the billing is submitted pursuant to subsection (4) of this
32   section.]
33       “ (1) If a construction contract is for construction work that is expected to take 60 or
34   more days to complete, an owner shall make progress payments to the original contractor.
35   By mutual agreement with an original contractor, an owner may make progress payments




     LC 467/SB 384-A3
 1   to the original contractor under a construction contract for which the construction work is
 2   expected to take less than 60 days to complete.
 3         “(2) [A construction contract may provide for an alternate billing cycle if the plans and specifica-
 4   tions specifically set forth] The owner shall make progress payments on the basis of a certified
 5   billing or estimate for work performed, and for materials or products supplied, during the
 6   preceding monthly billing cycle or during an alternative billing cycle identified in the con-
 7   struction contract. If a construction contract identifies an alternative billing cycle, the con-
 8   struction contract must expressly state in a clear and conspicuous manner that there is an
 9   [alternate] alternative billing cycle and the owner [provides for] must provide on each page of
10   [plans] drawings and specifications in the construction contract a statement substantially similar
11   to the following [statement]:
12   “ _____________________________________________________________________________________
13
14                                Notice of [Alternate] Alternative Billing Cycle
15
16         The construction contract will allow the owner to require the submission of billings or esti-
17   mates in billing cycles other than [30-day] monthly cycles. Billings or estimates for the con-
18   struction contract shall be submitted as follows:
19         ___________________________________________________________________________________
20
21         ___________________________________________________________________________________
22
23         ___________________________________________________________________________________
24
25   “ _____________________________________________________________________________________
26
27         “(3)(a) Except as provided in this subsection, the owner shall:
28         “(A) Make progress payments no later than 14 days after the date the billing is received;
29   and
30         “(B) Make final payment of all remaining amounts no later than seven days after the
31   date that the owner approves the work.
32         “(b) An owner may make progress payments or final payment later than [14 days after the date
33   the billing or estimate is submitted] the time allowed under paragraph (a) of this subsection if:
34         “[(a)] (A) The owner [is responsible for providing plans] provides drawings and specifications
35   that expressly [allow] state in a clear and conspicuous manner that an extended payment[, defined
36   by a specified] period is allowed and identify the extended payment period as a specific number
37   of days after the date that the billing or estimate is [submitted] received or the date that the
38   owner approves all work; and
39         “[(b)] (B) The owner provides [for] on each page of [plans] drawings and specifications a
40   statement substantially similar to the following [statement]:
41   “ _____________________________________________________________________________________
42
43                                    Notice of Extended Payment Provision
44
45         The construction contract will allow the owner to make [payment within]:


HA to A-Eng. SB 384                                                                               Page 2
 1       1) Progress payments no later than                     days after the date a billing or estimate is
 2   [submitted] received.
 3       2) Final payment of all remaining amounts no later than _____ days after the date the
 4   owner approves all work.
 5   “ _____________________________________________________________________________________
 6
 7       “ (4) Payment is not required under this section unless the owner receives from the ori-
 8   ginal contractor a billing or estimate for the work performed or the materials or products
 9   supplied in accordance with the terms of the construction contract.
10       “[(4)] (5) The owner is deemed to have received the billing or estimate when the billing or es-
11   timate is [submitted to] received by any person designated by the owner for the receipt, review or
12   approval of the billing or estimate. A billing or estimate is deemed to be certified 10 days after the
13   owner receives the billing or estimate, unless before that time the owner or the owner’s agent pre-
14   pares and issues a written statement detailing those items in the billing or estimate that are not
15   approved. An owner may decline to approve a billing or estimate or portion of a billing or estimate
16   [for] because of:
17       “(a) Unsatisfactory work progress;
18       “(b) Defective construction work, materials or products not remedied;
19       “(c) Disputed work, materials or products, except that the declined amount may not [to] ex-
20   ceed 150 percent of the amount in dispute;
21       “(d) Failure to comply with other material provisions of the construction contract;
22       “(e) A third party [claims] claim being filed or reasonable evidence that [such] a third party
23   claim will be filed;
24       “(f) Failure of the original contractor or a subcontractor to make timely payments to subcon-
25   tractors and material suppliers for labor, equipment, materials and products;
26       “(g) Damage to the owner;
27       “(h) Reasonable evidence that the construction contract cannot be completed for the unpaid
28   balance of the construction contract sum; or
29       “(i) Other items as allowed under the construction contract terms and conditions.
30       “[(5) An owner may withhold from a progress payment an amount that is sufficient to pay the di-
31   rect expenses the owner reasonably expects to incur to correct any items set forth in writing pursuant
32   to subsection (4) of this section. The owner may also withhold a reasonable amount as retainage as
33   defined in ORS 701.410.]
34       “(6) An owner may extend the period within which the billing or estimate may be certified if:
35       “(a) The owner [is responsible for providing plans] provides drawings and specifications that
36   expressly allow in a clear and conspicuous manner an extended period within which a billing or
37   estimate may be certified; and
38       “(b) The owner provides for each page of [plans] drawings and specifications, including bid
39   [plans and construction plans,] drawings and specifications and construction drawings and
40   specifications, a statement substantially similar to the following statement:
41   “ _____________________________________________________________________________________
42
43                                                  Notice of
44                                 Extended Certification Period Provision
45


HA to A-Eng. SB 384                                                                             Page 3
 1       The construction contract will allow the owner to certify billings and estimates [within] no
 2   later than            days after the billings and estimates are received from the original contractor.
 3   “ _____________________________________________________________________________________
 4
 5       “ (7) Any requirement under this section that a statement be provided on a page of
 6   drawings or specifications may be satisfied by placing the required statement on either side
 7   of the page.
 8       “[(7)] (8) After a subcontractor or material supplier submits a bid or proposal or other written
 9   pricing information to an original contractor, an owner and the original contractor may agree in
10   writing to change the specified number of days after certification during which the owner may
11   make payment to the original contractor or within which the owner must certify a billing or esti-
12   mate. The billings by any [original contractor,] subcontractor or material supplier that does not
13   provide written consent to the change [will continue to be paid as] remain subject to the certif-
14   ication period indicated in the [plans] drawings and specifications. A construction contract may
15   not be changed in a manner that alters the right of any subcontractor or material supplier
16   to receive prompt and timely progress payments as provided under ORS 701.630.
17       “(9) An owner may withhold from a progress payment an amount that is sufficient to pay
18   the direct expenses the owner reasonably expects to incur to correct any items detailed in
19   a written statement under subsection (5) of this section. The owner may also withhold a
20   reasonable amount as retainage. As used in this subsection, ‘retainage’ has the meaning
21   given that term in ORS 701.410.
22       “[(8)] (10) When an original contractor completes and an owner approves all work under a
23   construction contract, the owner shall make payment in full of all remaining amounts due on the
24   construction contract [within seven days] as described in subsection (3) of this section. When an
25   original contractor completes and an owner approves all work under a portion of a construction
26   contract for which the construction contract states a separate price, the owner shall make payment
27   in full of all remaining amounts due on that portion of the construction contract, subject to the
28   satisfaction of any [issue described in] items detailed under subsection [(4)] (5) of this section or
29   ORS 701.630 (4).
30       “[(9) Payment is not required under this section unless the original contractor provides the owner
31   with a billing or estimate for the work performed or the materials or products supplied in accordance
32   with the terms of the construction contract between the parties.]
33       “[(10) A construction contract may not alter the right of any original contractor, subcontractor or
34   material supplier to receive prompt and timely progress payments as provided under this section.]
35       “(11) If an owner or a person designated by the owner as responsible for making progress pay-
36   ments on a construction contract does not make a timely payment under this section, the owner
37   shall pay the original contractor interest on the unpaid balance at the rate of one and one-half
38   percent a month or fraction of a month, or at a higher rate as the parties to the construction con-
39   tract may agree.
40       “(12) On the written request of a subcontractor, the owner shall notify the subcontractor
41   [within] no later than five days after the issuance of a progress payment to the original contractor.
42   On the written request of a subcontractor, the owner shall notify the subcontractor [within] no later
43   than five days after the owner makes the final payment to the original contractor on the con-
44   struction contract.
45       “[(13) In any action, claim or arbitration brought to collect payments or interest pursuant to this


HA to A-Eng. SB 384                                                                            Page 4
 1   section, the prevailing party shall be awarded reasonable costs and attorney fees.]
 2       “[(14)] (13) If the owner and original contractor are a single entity, that entity shall [pay] make
 3   progress and final payments to subcontractors and material suppliers [within 14 days after the
 4   billing or estimate is received unless the deadlines for certification or payment have been modified
 5   pursuant to] as described in subsection (3) or (6) of this section.
 6       “ (14) In any action, claim or arbitration brought to collect interest pursuant to this
 7   section, the prevailing party shall be awarded costs and reasonable attorney fees.
 8       “ SECTION 3. ORS 701.630 is amended to read:
 9       “701.630. (1) [Performance by] An original contractor, subcontractor or material supplier [in ac-
10   cordance with the provisions of a construction contract entitles the original contractor, subcontractor
11   or material supplier] that performs in accordance with a construction contract is entitled to
12   payment from the party with whom the original contractor, subcontractor or material supplier con-
13   tracts.
14       “[(2) If a subcontractor or material supplier has performed in accordance with the provisions of a
15   construction contract, the original contractor shall pay to the subcontractor or material supplier, and
16   each subcontractor shall pay to its subcontractors or material suppliers, the full amount received for
17   such subcontractor’s work and for materials and products supplied based on the subcontract or pur-
18   chase order terms and conditions within seven days of receipt by the original contractor or subcon-
19   tractor of a progress payment or final payment.]
20       “ (2)(a) If a subcontractor has performed in accordance with a construction contract, and
21   the original contractor receives payment from the owner for work performed by the sub-
22   contractor, the original contractor shall pay the subcontractor for that work no later than
23   seven days after the original contractor receives the payment. If a material supplier has
24   performed in accordance with a construction contract, and the original contractor receives
25   payment from the owner for materials or products provided by the material supplier, the
26   original contractor shall pay the material supplier for those materials and products no later
27   than seven days after the original contractor receives the payment. An original subcontrac-
28   tor that receives payment under this subsection for work provided to the original subcon-
29   tractor by another subcontractor, or for materials or products provided to the original
30   subcontractor, shall pay the other subcontractor or material supplier for the work, materials
31   or products no later than seven days after the original subcontractor receives the payment.
32       “(b) Payment is not required under this subsection unless a subcontractor or material supplier
33   provides to the original contractor or subcontractor a billing or invoice for the work performed or
34   materials or products supplied in compliance with the terms of the contract between the parties.
35   Each subcontractor or material supplier must provide an appropriate waiver of any [mechanic’s or
36   materialman’s] lien for labor, equipment, services, materials or products in accordance with
37   subcontract or purchase order terms and conditions. The original contractor or subcontractor may
38   require that such waivers of lien be notarized.
39       “(3) Any failure to reasonably account for the application or use of payments, as proven in a
40   legal proceeding authorized under the terms of the construction contract, may constitute grounds
41   for disciplinary action by the Construction Contractors Board under ORS 701.098.
42       “(4) [Nothing in this section prevents] An original contractor [when submitting a bill] that sub-
43   mits a billing or estimate to an owner, or [a] an original subcontractor [when submitting a bill]
44   that submits a billing or estimate to the original contractor, [from omitting from the bill] may omit
45   from the billing or estimate amounts to be withheld from payment to a subcontractor or material


HA to A-Eng. SB 384                                                                            Page 5
 1   supplier [for] because of:
 2       “(a) Unsatisfactory work progress;
 3       “(b) Defective construction work, materials or products not remedied;
 4       “(c) Disputed work, materials or products, except that the withheld amount may not [to] ex-
 5   ceed 150 percent of the amount in dispute;
 6       “(d) Failure to comply with other material provisions of the construction contract;
 7       “(e) A third party [claims] claim being filed or reasonable evidence that [such] a third party
 8   claim will be filed;
 9       “(f) Failure of the subcontractor to make timely payments to subcontractors and material sup-
10   pliers for labor, equipment, materials and products;
11       “(g) Damage to an original contractor, subcontractor or material supplier;
12       “(h) Reasonable evidence that the subcontract cannot be completed for the unpaid balance of
13   the subcontract sum; or
14       “[(i) A reasonable amount for retainage, as defined in ORS 701.410, that does not exceed the actual
15   percentage allowed by the subcontract or purchase order; or]
16       “[(j)] (i) Other items as allowed under the subcontract or purchase order terms and conditions.
17       “ (5) An original contractor or original subcontractor may also omit from a billing or es-
18   timate a reasonable amount for retainage, except that the amount omitted may not exceed
19   the actual percentage allowed by the construction contract, subcontract or purchase order.
20   As used in this subsection, ‘retainage’ has the meaning given that term in ORS 701.410.
21       “[(5)] (6) If a progress or final payment to a subcontractor or material supplier is delayed by
22   more than seven days after receipt of a progress or final payment by an original contractor or
23   subcontractor, the original contractor or subcontractor shall pay its subcontractor or material sup-
24   plier interest beginning on the eighth day, except during periods of time during which payment is
25   withheld pursuant to subsection (4) or (5) of this section, at the rate of one and one-half percent a
26   month or a fraction of a month on the unpaid balance or at such higher rate as the parties agree.
27       “[(6)] (7) In any action, claim or arbitration brought to collect [payments or] interest under this
28   section, the prevailing party shall be awarded [reasonable] costs and reasonable attorney fees.
29       “ SECTION 4. ORS 701.635 is amended to read:
30       “701.635. (1) An original contractor may suspend performance under a construction contract, or
31   if performance is suspended for longer than one month may terminate a construction
32   contract, if [performance is suspended for longer than 30 days, for failure by] the owner fails to make
33   timely payment of the amount certified under ORS 701.625. An original contractor shall provide
34   written notice to an owner at least seven days before the original contractor suspends performance
35   or terminates the construction contract, unless a shorter notice period is prescribed in the con-
36   struction contract. An original contractor may not be deemed in breach of a construction contract
37   for suspending performance or terminating a construction contract pursuant to this subsection. A
38   construction contract may not extend the notice period under this subsection.
39       “(2) A subcontractor may suspend performance under a construction contract, or if perform-
40   ance is suspended for longer than one month may terminate a construction contract, if [per-
41   formance is suspended for longer than 30 days, for failure by] the owner fails to make timely payment
42   of amounts certified under ORS 701.625 or the subcontractor [fails to] does not receive payment for
43   the certified work under ORS 701.630 (2). A subcontractor shall provide written notice to the ori-
44   ginal contractor and owner at least three days before the subcontractor suspends performance or
45   terminates the construction contract, unless a shorter notice period is prescribed in the con-


HA to A-Eng. SB 384                                                                            Page 6
 1   struction contract. A subcontractor may not be deemed in breach of a construction contract for
 2   suspending performance or terminating a construction contract pursuant to this subsection. A
 3   construction contract may not extend the notice period under this subsection.
 4       “(3) A subcontractor may suspend performance under a construction contract, or if perform-
 5   ance is suspended for longer than one month may terminate a construction contract, [if per-
 6   formance is suspended for longer than 30 days,] if the owner makes timely payment of amounts
 7   certified under ORS 701.625 for the subcontractor’s work but the original contractor fails to pay the
 8   subcontractor for the certified work. A subcontractor shall provide written notice to the original
 9   contractor and owner at least seven days before the subcontractor suspends performance or termi-
10   nates the construction contract, unless a shorter notice period is prescribed in the construction
11   contract. A subcontractor may not be deemed in breach of a construction contract for suspending
12   performance or terminating a construction contract pursuant to this subsection. A construction
13   contract may not extend the notice period under this subsection.
14       “(4) A subcontractor may suspend performance under a construction contract, or if perform-
15   ance is suspended for longer than one month may terminate a construction contract, [if per-
16   formance is suspended for longer than 30 days,] if the owner declines or fails to approve portions
17   of the contractor’s billing or estimate under ORS 701.625 for that subcontractor’s work [but] and the
18   reasons for [that failure] nonapproval are not the fault of or directly related to the subcontractor’s
19   work. A subcontractor shall provide written notice to the original contractor and the owner at least
20   seven days before the subcontractor suspends performance or terminates the construction contract,
21   unless a shorter notice period is prescribed in the construction contract. A subcontractor may not
22   be deemed in breach of a construction contract for suspending performance or terminating a con-
23   struction contract pursuant to this subsection. A construction contract may not extend the notice
24   period under this subsection.
25       “(5) A contractor or subcontractor may not submit a notice of suspension under this section
26   until the lawful period for payment to the contractor or subcontractor has expired.
27       “(6) An original contractor or subcontractor that suspends performance as provided in this
28   section [is not required to furnish further labor, materials, products or services until the original con-
29   tractor or subcontractor is paid the amount that was certified under ORS 701.625, together with] may
30   condition the supplying of further labor, equipment, services, materials or products upon the
31   owner or original contractor paying, in addition to any amounts certified under ORS 701.625,
32   any documented, substantial and reasonably incurred costs for mobilization resulting from the
33   shutdown or start-up of a project.
34       “(7) In any action, claim or arbitration brought pursuant to this section, the prevailing party
35   shall be awarded [reasonable] costs and reasonable attorney fees.
36       “(8) Written notice required under this section is deemed to have been provided if the notice:
37       “(a) Is delivered in person to the owner, original contractor, subcontractor or a person desig-
38   nated by the owner, original contractor or subcontractor to receive notice; or
39       “(b) Is delivered by certified mail, return receipt requested, or other means that provides writ-
40   ten, third party verification of delivery to the last business address of the owner, original contractor
41   or subcontractor known to the party giving notice.
42       “ SECTION 5. ORS 701.640 is amended to read:
43       “701.640. (1) A construction contract may not include any provision, covenant or clause that:
44       “(a) Makes the construction contract subject to the laws of another state or that requires any
45   litigation, arbitration or other dispute resolution proceeding arising from the construction contract


HA to A-Eng. SB 384                                                                               Page 7
 1   to be conducted in another state; or
 2       “(b) States that a party to the construction contract cannot suspend performance under the
 3   construction contract or terminate the construction contract if another party to the construction
 4   contract fails to make prompt payments under the construction contract pursuant to ORS 701.620
 5   to 701.640.
 6       “(2) Any provision, covenant or clause described in subsection (1) of this section is void and
 7   unenforceable.
 8       “ SECTION 6. The amendments to ORS 701.620, 701.625, 701.630, 701.635 and 701.640 by
 9   sections 1 to 5 of this 2011 Act apply to construction contracts that an owner enters into on
10   or after the effective date of this 2011 Act.”.
11