Skip to content
← Find this measure

2011 Regular Session · HB 5002

Budget Report — HB 5002 (2011R1)

This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.

Other indexed documents for this measure (6)
Recorded legislative activity (35)
  1. First Reading Of House Bills
  2. First reading. Referred to the desks of the Co-Speakers.
  3. Referred to Ways and Means.
  4. Assigned to Subcommittee On Natural Resources.
  5. Heard
  6. Public Hearing held.
  7. Heard
  8. Public Hearing held.
  9. Heard
  10. Public Hearing held.
  11. Heard
  12. Public Hearing held.
  13. Heard and Reported Out
  14. Work Session held.
  15. Returned to Full Committee.
  16. Heard and Reported Out with Amendments
  17. Work Session held.
  18. Recommendation: Do pass with amendments and be printed A-Engrossed.
  19. Second Reading Of House Bills
  20. Second reading.
  21. Third Reading Of House Bills
  22. Third reading. Carried by Jenson. Passed.
  23. First Reading Of House Measures
  24. First reading. Referred to President's desk.
  25. Referred to Ways and Means.
  26. Second Reading Of House Measures
  27. Recommendation: Do pass the A-Eng. bill.
  28. Second reading.
  29. Carried over to 05-31 by unanimous consent.
  30. Third Reading Of House Measures
  31. Third reading. Carried by Edwards. Passed.
  32. Co-Speakers signed.
  33. President signed.
  34. Governor signed.
  35. Chapter 409, (2011 Laws): Effective date July 1, 2011.
Citation and provenance

Oregon Legislature. Budget Report — HB 5002 (2011R1). 2011 Regular Session. https://olis.oregonlegislature.gov/liz/2011R1/Downloads/MeasureAnalysisDocument/14163 Retrieved 2026-09-02.

Document ID: doc_d957671da2b3feb9af81

Original SHA-256: 9ee68e861648b442030321715312b5961b27191dfe9f3df5b5b02271a3180225

Extracted text SHA-256: 6e31557767ea2ed02050fc3b2308680cea9279e889db5e04b841a710a2f2d928

76th OREGON LEGISLATIVE ASSEMBLY – 2011 Regular Session                                         MEASURE:            HB 5002-A
BUDGET REPORT AND MEASURE SUMMARY
                                                                                                Carrier – House: Rep. Jenson
JOINT COMMITTEE ON WAYS AND MEANS                                                               Carrier – Senate: Sen. Edwards


Action:   Do Pass as Amended and as Printed A-Engrossed

Vote:   25 – 0 – 0
 House – Yeas: Beyer, Buckley, Cowan, Freeman, Garrard, Komp, Kotek, McLane, Nathanson, Nolan, Richardson, G. Smith, Thatcher, Whisnant
       – Nays:
       – Exc:

Senate – Yeas: Bates, Devlin, Edwards, Girod, Johnson, Monroe, Nelson, Thomsen, Verger, Whitsett, Winters
       – Nays:
       – Exc:

Prepared By:   Art Ayre, Department of Administrative Services

Reviewed By:   Paul Siebert, Legislative Fiscal Office

Meeting Date: May 13, 2011

Agency                                                                 Budget Page              LFO Analysis Page           Biennium
Department of Agriculture                                                 F-4                         123                    2011-13




                                                                                                                                 HB 5002-A
                                                                                                                                Page 1 of 10
Budget Summary*                                                                                                                               Committee Change from
                                                  2009-11                   2011-13                   2011-13                2011-13           2009-11 Leg Approved
                                                Legislatively                                                               Committee
                                                                      Current Service Level      Governor's Budget                            $ change      % change
                                             Approved Budget (1)                                                         Recommendation
General Fund                               $           13,012,720 $               15,586,409 $            11,939,880 $           12,610,616      -402,104        -3.1%
Lottery Funds                                          10,143,165                 10,766,321               9,463,296              6,356,014    -3,787,151       -37.3%
Other Funds                                            49,680,325                 50,408,598              54,574,473             52,132,748     2,452,423         4.9%
Federal Funds                                          12,287,361                 12,718,208              12,665,265             11,945,878      -341,483        -2.8%
  Total                                    $           85,123,571 $               89,479,536 $            88,642,914 $           83,045,256    -2,078,315        -2.4%

Position Summary
Authorized Positions                                         504                         501                       506                  468           -36
Full-time Equivalent (FTE) Positions                      357.69                      354.41                    359.89               343.29        -14.40

(1) Includes adjustments through March 2011.
* Excludes Capital Construction expenditures


Summary of Revenue Changes
The Department of Agriculture is supported with General Fund, Lottery Funds, Other Funds, and Federal Funds. General Fund comprises about
15 percent of the budget approved by the subcommittee. Lottery Funds, at about eight percent, support Oregon Plan activities and county fair
administration. The largest revenue component is Other Funds, supporting about 63 percent of the agency’s budget. Sources include fees for
licenses, registrations, inspections, certifications, and reimbursements under federal service contracts. The U.S. Department of Agriculture and
other federal agencies support the remaining 14 percent of the agency budget.

The subcommittee approved House Bill 5003, which ratifies fees the agency increased by administrative rule during the 2009-11 biennium.
These include fees for field inspection of vegetable and specialty seed crops for seed producers, fees for official seed sampling and inspection and
verification services requested by owners or producers, fees for molecular analysis of seeds for regulated pests, fees for determining the adequacy
of a fence, and fees for permits and for renewal of permits to keep exotic animals in captivity.

The subcommittee recommendation includes expenditure limitation for revenue dependent on the passage of Senate Bill 119 – Shellfish Fees,
Senate Bill 120 – Confined Animal Feeding Operation Fees, and Senate Bill 121 – Seed Dealers License Increase.


Summary of Natural Resources Subcommittee Action
The Department of Agriculture ensures food safety, provides consumer protection, protects natural resources, and promotes agricultural economic
development. For budget purposes, the Department’s activities are grouped into four program units: Administration and Support Services, Food

                                                                                                                                                             HB 5002-A
                                                                                                                                                            Page 2 of 10
Safety Policy Area, Natural Resources Policy Area, and Agricultural Development Policy Area. The subcommittee approved an agency total
funds budget of $83,045,256 and 468 positions (343.29 full-time equivalents). This is a 2.4 percent decrease from the 2009-11 Legislatively
Approved Budget. This decrease included a shift of Lottery Funds expenditure limitation for weed control grants to the Oregon Watershed
Enhancement Board.

Administration and Support Services
Administration and Support Services provides policy direction and support functions for the agency, including financial management,
development and maintenance of information systems, public information, personnel, purchasing, facilities management, fleet operations, and
farm mediation. The subcommittee approved a budget of $816,397 General Fund, $8,873,594 Other Funds, and 38 positions (38.00 full-time
equivalents).

The subcommittee approved Package 086 – Eliminate Inflation. This package is used on a statewide basis to eliminate standard and Attorney
General inflation, and to adjust State Government Service Charges. The package reduces General Fund by $1,475 and Other Funds expenditure
limitation by $23,896.

The subcommittee approved Package 087 – Personal Service Adjustments. This package reflects a 5.5 percent across-the-board reduction in total
Personal Services expenditures from the Current Service Level budget. The package reduces General Fund by $68,448 and Other Funds
expenditure limitation by $353,088.

The subcommittee approved Package 090 – Analyst Adjustments. This package includes reductions made in accordance with the Governor’s
Enterprise Budget for the Natural Resources policy area. The package reduces General Fund by $537,581 and eliminates two positions (2.28 full
time equivalents), which are restored in Package 092.

The subcommittee approved Package 092 – Fund Shifts/Sweeps. This package provides Other Funds revenues, expenditure limitation, and
position authority necessary to offset 090 General Fund reductions.

The subcommittee approved Package 105 – Information Technology Maintenance & Upgrade. This package provides expenditure limitation to
implement a life-cycle replacement program for critical business systems and to allow field staff to gain efficiencies through technology. The
project is funded through indirect charges on Other Funds and Federal Funds programs. The package increases Other Funds expenditure
limitation by $975,000.

The subcommittee approved Package 801 – Targeted Statewide Adjustments. This package implements a statewide reduction action included in
the Co-Chairs’ Budget, which is a 6.5 percent reduction from total General Fund Services and Supplies expenditures included in the Governor’s
Recommended Budget. This package reduces General Fund by $8,898. This is in addition to Package 086, which eliminates most Services and
Supplies inflation originally built into the budget.


                                                                                                                                       HB 5002-A
                                                                                                                                      Page 3 of 10
The subcommittee approved Package 819 – Supplemental Statewide Ending Balance. This package includes, per the Co-Chairs’ budget plan, a
supplemental statewide ending balance hold back adjustment. The result is about a 3.5 percent across-the-board reduction to an agency’s total
biennial General Fund and/or Lottery Funds budget or approximately 7 percent to be taken from the second year of the budget. The package
reduces General Fund by $29,703.

Food Safety Policy Area
The Food Safety Policy Area protects the food supply, keeps livestock healthy, and ensures measurement device accuracy. Activities include
inspecting food facilities, performing laboratory tests, checking scales, and recording livestock brands. The subcommittee approved a budget of
$5,277,489 General Fund, $18,476,681 Other Funds, $972,513 Federal Funds, and 169 positions (110.25 full-time equivalents).

The subcommittee approved Package 086 – Eliminate Inflation. This package is used on a statewide basis to eliminate standard and Attorney
General inflation, and to adjust State Government Service Charges. The package reduces General Fund by $42,772, Other Funds expenditure
limitation by $116,993, and Federal Funds expenditure limitation by $12,420.

The subcommittee approved Package 087 – Personal Service Adjustments. This package reflects a 5.5 percent across-the-board reduction in total
Personal Services expenditures from the Current Service Level budget. Final personal services decisions will be determined by policy decisions
and future labor negotiations. The package reduces General Fund by $240,552, Other Funds expenditure limitation by $828,763, and Federal
Funds expenditure limitation by $2,911.

The subcommittee approved Package 090 – Analyst Adjustments, as modified. This package includes reductions made in accordance with the
Governor’s Enterprise Budget for the Natural Resources policy area. It also adds $100,000 General Fund to Special Payments as partial add-back
for Predator Control. The subcommittee approved a modification that removes the $100,000 General Fund increase for Predator Control and
moves this funding to Package 240. The resulting package reduces General Fund by $1,497,641 and eliminates seven positions (7.56 full-time
equivalents). A vacant District Veterinarian position is not restored in Package 092.

The subcommittee approved Package 092 – Fund Shifts/Sweeps. This package provides Other Funds revenues, expenditure limitation, and
position authority necessary to offset Package 090 General Fund reductions to the Food Safety, Feeds, Shellfish, and Animal Health programs.
The package increases Other Funds expenditure limitation by $1,385,000 and adds six positions (6.56 full-time equivalents). Two of the fund
shift actions included in this package are reversed in Package 810.

The subcommittee approved Package 200 – Agency Fees Adjusted Administratively. This package increases Other Funds revenue related to fees
that were adopted administratively during the 2009-11 biennium. Ratification of these fee modifications is included in House Bill 5003.

The subcommittee approved Package 230 – Shellfish Fee. This package provides expenditure limitation associated with additional revenues
generated by higher shellfish cultivation and millage fees contained in Senate Bill 119. The package increases Other Funds expenditure limitation
by $66,691.


                                                                                                                                       HB 5002-A
                                                                                                                                      Page 4 of 10
The subcommittee approved Package 240 – Predator Control. This package provides funding to partially restore cuts made during the 2009
legislative session to payments to the U.S. Department of Agriculture Wildlife Services for the predator control program. The package increases
General Fund by $250,000.

The subcommittee approved Package 801 – Targeted Statewide Adjustments. This package implements a statewide reduction action included in
the Co-Chairs’ Budget, which is a 6.5 percent reduction from total General Fund Services and Supplies expenditures included in the Governor’s
Recommended Budget. This package reduces General Fund by $127,026. This is in addition to Package 086, which eliminates most Services and
Supplies inflation originally built into the budget.

The subcommittee approved Package 802 – Vacant Position Savings. This package eliminates primarily long-term vacant positions that have
been reviewed and determined not to be critical for supporting the agency’s core programs. The positions are from the Livestock Brands program
and include five supervisors. The package reduces Other Funds expenditure limitation by $258,836 and eliminates 11 positions (2.73 full-time
equivalents).

The subcommittee approved Package 810 – Analyst Adjustments. This package reverses the Animal Health and Shellfish program fund shifts by
restoring General Fund support eliminated in Package 090 and reducing the Other Funds expenditure limitation increased in Package 092. The
package increases General Fund by $565,717 and reduces Other Funds expenditure limitation by $565,717.

The subcommittee approved Package 811 – Position Alignment Actions to implement the following: Abolish a management position, Principal
Executive / Manager B, in the Weights and Measures program and make an existing part-time Office Specialist 2 position full-time. Also
reclassify two existing laboratory staff: reclassify a Metrologist to a Natural Resource Specialist 4 and reclassify a Natural Resource Specialist 4
to a Natural Resource Specialist 5; the duties of both lab positions have evolved to a higher level and are necessary to ensure laboratory
certification is maintained by the National Institute of Standards and Technology. A related action reclassifies two existing vacant Compliance
Specialist 2 positions and moves them from Weights and Measures to the Lab Services section. One of these two positions is reclassified down to
a half-time Chemist 2 to provide support and data analysis. The other is reclassified up to a Natural Resource Specialist 4 to serve as the Quality
Assurance Officer. The package reduces Other Funds expenditure limitation by $107,763 and eliminates one position (1.04 full-time equivalents).

The subcommittee approved Package 819 – Supplemental Statewide Ending Balance. This package includes, per the Co-Chairs’ budget plan, a
supplemental statewide ending balance hold back adjustment. The result is about a 3.5 percent across-the-board reduction to an agency’s total
biennial General Fund and/or Lottery Funds budget or approximately seven percent to be taken from the second year of the budget. The package
reduces General Fund by $194,510.

Natural Resources Policy Area
The Natural Resources Policy Area conserves, protects, and develops natural resources. It also maintains fertilizer and pesticide standards.
Employees inspect and certify nursery stock, Christmas trees, and seed crops toward controlling and excluding foreign pests and plant diseases.
Under the Oregon Plan, the program activities help to restore and enhance salmon/steelhead populations and watersheds and implement
agricultural water quality plans. The subcommittee approved a budget of $3,065,681 General Fund, $6,335,856 Lottery Funds, $13,537,783
Other Funds, $5,097,098 Federal Funds, and 131 positions (110.65 full-time equivalents).
                                                                                                                                          HB 5002-A
                                                                                                                                         Page 5 of 10
The subcommittee approved Package 086 – Eliminate Inflation. This package is used on a statewide basis to eliminate standard and Attorney
General inflation, and to adjust State Government Service Charges. The package reduces General Fund by $12,583, Lottery Funds by $56,747,
Other Funds expenditure limitation by $104,259, and Federal Funds expenditure limitation by $71,813.

The subcommittee approved Package 087 – Personal Service Adjustments. This package reflects a 5.5 percent across-the-board reduction in total
personal services expenditures from the Current Service Level budget. Final personal services decisions will be determined by policy decisions
and future labor negotiations. The package reduces General Fund by $196,474, Lottery Funds by $324,485, Other Funds expenditure limitation
by $463,293, and Federal Funds expenditure limitation by $164,148.

The subcommittee approved Package 090 – Analyst Adjustments, as modified. This package includes reductions made in accordance with the
Governor’s Enterprise Budget for the Natural Resources policy area. The package also added $1.9 million Other Funds from the Pacific Coastal
Salmon Recovery Fund (PCSRF) on a one-time basis, via the Oregon Watershed Enhancement Board, to the base Ag Water Quality Program and
to enhance monitoring and program effectiveness activities that had been requested in Package 300. The subcommittee removed that funding and
positions. The subcommittee also approved a technical correction to the Governor’s budget by adding two positions (1.83 full-time equivalents).
The resulting package reduces General Fund by $787,584 and Lottery Funds by $48,038, increases Other Funds expenditure limitation by
$1,008,775, and eliminates two positions (1.48 full-time equivalents).

The subcommittee approved Package 092 – Fund Shifts/Sweeps. This package provides Other Funds revenues, expenditure limitation, and
position authority necessary to offset Package 090 reductions for the Pesticide Analytical and Response Center (PARC), Confined Animal
Feeding Operations (CAFO), and Pesticides programs. The package increases Other Funds expenditure limitation by $730,000 and adds four
positions (2.95 full-time equivalents).

The subcommittee approved Package 300 – Monitoring Ag Water Quality Program Effectiveness. This package adds positions and resources to
evaluate riparian conditions along agricultural lands, to monitor ambient water quality sites that have strong agricultural influence, and to fully
participate in state water quality monitoring efforts. The agency had requested Lottery Funds to fund this package; however, due to its reliance on
Lottery Funds which are projected to be insufficient for activities in the 2011-13 biennium, it was not approved initially. As part of the
Governor’s Enterprise Budget for the Natural Resources policy area, the policy option was funded using PCSRF Other Funds that originated from
the Oregon Watershed Enhancement Board and added to Package 090. The subcommittee approved the Legislative Fiscal Office adjustment that
moves the funding and positions from Package 090 to Package 300 with the understanding that the positions are limited duration and the funding
is provided on a one-time basis and will be phased out during development of the 2013-15 biennium budget, as will all fund shifts involving one-
time use of PCSRF monies. The package increases Other Funds expenditure limitation by $897,727 and adds three positions (3.00 full-time
equivalents).

The subcommittee approved Package 315 – CAFO Fee. This package provides $105,399 Other Funds expenditure limitation for additional
revenue associated with higher license fees and cost recovery fees for the Confined Animal Feeding Operations (CAFO) program contained in
Senate Bill 120. The package also adds one position (0.50 full-time equivalent).

                                                                                                                                         HB 5002-A
                                                                                                                                        Page 6 of 10
The subcommittee approved Package 325 – Base Pesticide Positions, as modified. This package establishes two permanent, full-time Natural
Resource Specialist 3 positions to continue the 2009-11 biennium level of outreach and compliance monitoring activities in the Base Pesticides
Program provided by limited duration positions. The package makes permanent two positions added as limited duration in 2009-11. The
subcommittee approved the two positions as limited duration for the 2011-13 biennium. The package increases Other Funds expenditure
limitation by $420,471 and adds two positions (2.00 full-time equivalents).

The subcommittee approved Package 801 – Targeted Statewide Adjustments. This package implements a statewide reduction action included in
the Co-Chairs’ Budget, which is a 6.5 percent reduction from total General Fund and Lottery Funds services and supplies expenditures included
in the Governor’s Recommended Budget. This package reduces General Fund by $18,393 and Lottery Funds by $113,783. This is in addition to
Package 086, which eliminates most services & supplies inflation originally built into the budget.

The subcommittee approved Package 802 – Vacant Position Savings. This package eliminates primarily long-term vacant positions that have
been reviewed and determined not to be critical for supporting the agency’s core programs. Eliminated positions are primarily from the Weed
Control, Insect Pest Prevention, and Pesticides programs. Vacancies include four full-time positions and 17 part-time seasonal positions. The
package reduces Lottery Funds by $126,336, Other Funds expenditure limitation by $571,640, Federal Funds expenditure limitation by $253,314,
and eliminates 21 positions (8.99 full-time equivalents).

The subcommittee approved Package 810 – Analyst Adjustments. This package eliminates General Fund and dedicated Lottery Funds support for
the Oregon Invasive Species Council due to Lottery Fund constraints contained in Ballot Measure 76, which limit state agency expenditures of
dedicated Lottery Funds. General Fund support is reduced due to statewide General Fund constraints. The package reduces General Fund by
$16,401 and Lottery Funds by $76,997.

The subcommittee approved Package 811 – Position Alignment Actions to implement the following: Reclassify a Soil and Water Conservation
District management position, Principal Executive / Manager D, down to a represented Natural Resource Specialist 4; supervisory and budget
management responsibilities will be transferred to an existing management position. Abolish two vacant half-time positions in the Pesticide
Analytical and Response Center (PARC), a Natural Resource Specialist 3 and an Office Specialist 2. The abolishment of the two positions
requires a transfer of the Personal Services limitation to Services and Supplies because the agency has historically used the limitation from the
two positions to contract with scientific experts for PARC cases. The package reduces Lottery Funds by $12,105 and eliminates two positions
(0.96 full-time equivalent).

The subcommittee approved Package 813 – Move Weed Control Grants to OWEB. This package is a technical adjustment that moves Measure
76 Lottery Funds expenditure limitation for weed control grants made by the Weed Board to the Oregon Watershed Enhancement Board
(OWEB). The Governor’s budget has these grants being funded out of the 65 percent of Measure 76 dedicated Lottery Funds that cannot be
expended by a state agency other than OWEB; therefore, the expenditure limitation needs to be moved to OWEB to allow these grants to be
funded out of the capital grant fund. The Department will still assist the operations of the Weed Board and then forward their grant
recommendations to OWEB. The package reduces Lottery Funds by $2,544,125.


                                                                                                                                          HB 5002-A
                                                                                                                                         Page 7 of 10
The subcommittee approved Package 819 – Supplemental Statewide Ending Balance. This package includes, per the Co-Chairs’ budget plan, a
supplemental statewide ending balance hold back adjustment. The result is about a 3.5 percent across-the-board reduction to an agency’s total
biennial General Fund and/or Lottery Funds budget or approximately seven percent to be taken from the second year of the budget. The package
reduces General Fund by $110,997 and Lottery Funds by $232,124.

Agricultural Development Policy Area
Agricultural Development Policy Area staff work with the agriculture industry to increase sales of Oregon products in the United States and
abroad. The subcommittee approved a budget of $3,451,049 General Fund, $20,158 Lottery Funds (General Purpose), $11,244,690 Other Funds,
$5,876,267 Federal Funds, and 130 positions (84.39 full-time equivalents).

The subcommittee approved Package 086 – Eliminate Inflation. This package is used on a statewide basis to eliminate standard and Attorney
General inflation, and to adjust State Government Service Charges. The package reduces General Fund by $21,070, Lottery Funds by $430, Other
Funds expenditure limitation by $81,873, and Federal Funds expenditure limitation by $69,339.

The subcommittee approved Package 087 – Personal Service Adjustments. This package reflects a 5.5 percent across-the-board reduction in total
personal services expenditures from the Current Service Level budget. Final personal services decisions will be determined by policy decisions
and future labor negotiations. The package reduces General Fund by $132,594, Lottery Funds by $340, Other Funds expenditure limitation by
$521,986, and Federal Funds expenditure limitation by $59,364.

The subcommittee approved Package 090 – Analyst Adjustments. This package includes reductions made in accordance with the Governor’s
Enterprise Budget for the Natural Resources policy area. The package reduces General Fund by $207,755 and eliminates one position (1.08 full-
time equivalents).

The subcommittee approved Package 092 – Fund Shifts/Sweeps. This package provides Other Funds revenues, expenditure limitation, and
position authority necessary to offset Package 090 General Fund reductions. The package increases Other Funds expenditure limitation by
$216,000 and adds one position (1.08 full-time equivalents).

The subcommittee approved Package 200 – Agency Fees Adjusted Administratively. This package increases Other Funds revenues related to fee
changes that were adopted administratively during the 2009-11 biennium. Ratification of these fee modifications is included in House Bill 5003.

The subcommittee approved Package 405 – Seed License Fee. This package provides Other Funds expenditure limitation associated with a
proposed increase in wholesale seed dealer license fees contained in Senate Bill 121. The fee modifications contained in Senate Bill 121 are
included in the Co-Chairs’ budget plan. The package increases Other Funds expenditure limitation by $99,800.

The subcommittee approved Package 410 – Slow Pay / No Pay. This package provides Other Funds expenditure limitation associated with House
Bill 2159 that would modify Oregon's seed law in several ways, including requiring a license to contract for production within Oregon. The
package increases Other Funds expenditure limitation by $22,523.

                                                                                                                                        HB 5002-A
                                                                                                                                       Page 8 of 10
The subcommittee approved Package 415 – Certification Specialists. This package provides position authority and $303,945 Other Funds
expenditure limitation to add two permanent, full-time positions within the Commodity Inspection Division to provide sufficient capacity to meet
industry demand for a variety of voluntary certifications. The positions are one Natural Resource Specialist 1 position (1.00 full-time equivalent)
and one Administrative Specialist 1 position (1.00 full-time equivalent).

The subcommittee approved Package 801 – Targeted Statewide Adjustments. This package implements a statewide reduction action included in
the Co-Chairs’ Budget, which is a 6.5 percent reduction from total General Fund and Lottery Funds Services and Supplies expenditures included
in the Governor’s Recommended Budget. This package reduces General Fund by $72,281 and Lottery Funds by $1,049. This is in addition to
Package 086, which eliminates most Services and Supplies inflation originally built into the budget.

During the discussion of the Lottery Funds reductions in to the County Fair Commission, the subcommittee received a letter from one of the Co-
Chairs to the agency asking that the Director of the department become more actively involved in the oversight of the County Fair Commission.

The subcommittee approved Package 802 – Vacant Position Savings. This package eliminates primarily long-term vacant positions that have
been reviewed and determined not to be critical for supporting the agency’s core programs. This package eliminates two seasonal Plant Health
positions (1.50 full-time equivalents) that are vacant due to lack of Federal Funds. The package reduces Federal Funds expenditure limitation
associated with the two positions by $139,021.

The subcommittee approved Package 810 – Analyst Adjustments. This package adds three permanent full-time positions (2.75 full-time
equivalents) and $660,025 General Fund to the Ag Development and Marketing program to increase economic activity in the agriculture sector.
The positions will find solutions and provide marketing opportunities for the state’s food and agriculture industry both domestically and
internationally. The first position is an International Trade Manager. The second position is a Federal and International Trade and Certification
Policy Specialist. Finally, the third position is a New Media Product Promotion and Placement Specialist. This enhancement is included in the
Co-Chairs’ budget plan. These new positions are assumed to be filled by September 1, 2011; therefore, funding for the 2011-13 biennium is
based on only 22 months.

The subcommittee approved Package 811 – Position Alignment Actions. Abolishes two Shipping Point Inspector 1 positions (1.96 full-time
equivalents) and reclassifies two other Shipping Point Inspector 1 positions, one to a Natural Resource Specialist 1 and the other to a Natural
Resource Specialist 2. Upward reclassification allows the two positions to be self-supervised. The package reduces Other Funds expenditure
limitation by $161,011.

The subcommittee approved Package 819 – Supplemental Statewide Ending Balance. This package includes, per the Co-Chairs’ budget plan, a
supplemental statewide ending balance hold back adjustment. The result is about a 3.5 percent across-the-board reduction to an agency’s total
biennial General Fund and/or Lottery Funds budget or approximately seven percent to be taken from the second year of the budget. The package
reduces General Fund by $126,797 and Lottery Funds by $763.

The recommended budget for this agency includes a reduction of General and Lottery Funds for a supplemental ending balance. The reductions
are explained in each of the program unit narratives (Package 819). The reduction is intended to be applied against spending levels in the second
                                                                                                                                          HB 5002-A
                                                                                                                                         Page 9 of 10
year of the biennium and to not affect program delivery in the first year. To reinforce that intent, the agency’s budget bill includes specific
language allowing the agency to expend up to 54 percent of its total biennial General Fund appropriation in the first year of the biennium.

The amount of the reduction for the supplemental ending balance may be restored during the February 2012 session to the agency for the second
year of the biennium depending on economic conditions. Therefore, the Co-Chairs of the Joint Committee on Ways and Means expect the
agency director to closely monitor the quarterly revenue forecast and other economic indicators to gauge adequacy of funding in the second year
and manage their budgets accordingly.


Summary of Performance Measure Action
See attached Legislatively Adopted 2011-13 Key Performance Measures form.




                                                                                                                                            HB 5002-A
                                                                                                                                          Page 10 of 10
DETAIL OF JOINT COMMITTEE ON WAYS AND MEANS ACTION                                                                                                                                HB 5002-A
Department of Agriculture
Art Ayre -- (503) 378-3108
                                                                                                   OTHER FUNDS                       FEDERAL FUNDS                TOTAL
                                                            GENERAL          LOTTERY                                                                               ALL
                      DESCRIPTION                            FUND             FUNDS            LIMITED           NONLIMITED       LIMITED           NONLIMITED    FUNDS         POS           FTE

2009-11 Legislatively Approved Budget at March 2011 *   $   13,012,720   $   10,143,165    $   49,680,325    $           0    $   12,287,361    $           0 $   85,123,571     504          357.69
2011-13 ORBITS printed Current Service Level (CSL)*     $   15,586,409   $   10,766,321    $   50,408,598    $           0    $   12,718,208    $           0 $   89,479,536     501          354.41
2011-13 Governor's Recommended Budget*                  $   11,939,880   $    9,463,296    $   54,574,473    $           0    $   12,665,265    $           0 $   88,642,914     506          359.89



SUBCOMMITTEE ADJUSTMENTS (from GRB)

Administration and Support Services
Package 110: Global Warming
  Personal Services                                     $           0    $             0   $             0   $           0    $     (136,583) $             0 $     (136,583)      (1)         -1.00
  Services and Supplies                                 $           0    $             0   $             0   $           0    $      (40,469) $             0 $      (40,469)       0           0.00
  Special Payments                                      $           0    $             0   $             0   $           0    $     (150,000) $             0 $     (150,000)       0           0.00

Package 801: Targeted Statewide Adjustments
  Services and Supplies                                 $       (8,898) $              0   $             0   $           0    $             0   $           0 $       (8,898)         0         0.00

Package 819: Supplemental Statewide Ending Balance
  Personal Services                                     $      (24,947) $              0   $             0   $           0    $             0   $           0 $      (24,947)         0         0.00
  Services and Supplies                                 $       (4,756) $              0   $             0   $           0    $             0   $           0 $       (4,756)         0         0.00

Food Safety Policy Area
Package 090: Analyst Adjustments
  Special Payments                                      $     (100,000) $              0   $             0   $           0    $             0   $           0 $     (100,000)         0         0.00

Package 235: Animal Health Fee
  Services and Supplies                                 $           0    $             0   $     (278,642) $             0    $             0   $           0 $     (278,642)         0         0.00

Package 240: Predator Control
  Special Payments                                      $     250,000    $             0   $             0   $           0    $             0   $           0 $     250,000           0         0.00

Package 801: Targeted Statewide Adjustments
  Services and Supplies                                 $     (127,026) $              0   $             0   $           0    $             0   $           0 $     (127,026)         0         0.00

Package 802: Vacant Position Savings
  Personal Services                                     $           0    $             0   $     (258,836) $             0    $             0   $           0 $     (258,836)     (11)         -2.73

Package 810: Analyst Adjustments
  Personal Services                                     $     396,847    $             0   $     (396,847) $             0    $             0   $           0 $            0          0         0.00
  Services and Supplies                                 $     168,870    $             0   $     (168,870) $             0    $             0   $           0 $            0          0         0.00


                                                                                                                                                                                HB 5002-A
         *Excludes Capital Construction Expenditures                                                                                                                            Page 1 of 3
                                                                                               OTHER FUNDS                       FEDERAL FUNDS                 TOTAL
                                                           GENERAL        LOTTERY                                                                               ALL
                     DESCRIPTION                            FUND           FUNDS            LIMITED           NONLIMITED       LIMITED           NONLIMITED    FUNDS         POS           FTE

Package 811: Position Alignment Actions
  Personal Services                                    $          0   $             0   $    (107,763) $              0    $             0   $           0 $    (107,763)       (1)         -1.04

Package 819: Supplemental Statewide Ending Balance
  Personal Services                                    $    (114,517) $             0   $             0   $           0    $             0   $           0 $    (114,517)          0        0.00
  Services and Supplies                                $     (71,115) $             0   $             0   $           0    $             0   $           0 $     (71,115)          0        0.00
  Special Payments                                     $      (8,878) $             0   $             0   $           0    $             0   $           0 $      (8,878)          0        0.00

Natural Resources Policy Area
Package 090: Analyst Adjustments
  Personal Services                                    $       5,503 $              0   $    (458,214) $              0    $             0   $           0 $    (452,711)       (1)         -1.17
  Services and Supplies                                $     147,188 $              0   $    (388,434) $              0    $             0   $           0 $    (241,246)        0           0.00
  Special Payments                                     $    (152,691) $             0   $     (48,279) $              0    $             0   $           0 $    (200,970)        0           0.00

Package 300: Monitoring Ag Water Quality Program
Effectiveness (one-time funding from PCSRF)
  Personal Services - Limited Duration Positions       $          0   $             0   $     452,711     $           0    $             0   $           0 $     452,711           3        3.00
  Services and Supplies                                $          0   $             0   $     244,046     $           0    $             0   $           0 $     244,046           0        0.00
  Special Payments                                     $          0   $             0   $     200,970     $           0    $             0   $           0 $     200,970           0        0.00

Package 330: NPDES
  Personal Services                                    $          0   $             0   $    (366,303) $              0    $             0   $           0 $    (366,303)       (3)         -3.00
  Services and Supplies                                $          0   $             0   $    (109,613) $              0    $             0   $           0 $    (109,613)        0           0.00
  Capital Outlay                                       $          0   $             0   $     (25,000) $              0    $             0   $           0 $     (25,000)        0           0.00

Package 801: Targeted Statewide Adjustments
  Services and Supplies                                $     (18,393) $    (113,783)    $             0   $           0    $             0   $           0 $    (132,176)          0        0.00

Package 802: Vacant Position Savings
  Personal Services                                    $          0   $    (126,336)    $    (571,640) $              0    $    (253,314) $              0 $    (951,290)      (21)         -8.99

Package 810: Analyst Adjustments
  Services and Supplies                                $     (16,401) $     (76,997)    $             0   $           0    $             0   $           0 $     (93,398)          0        0.00

Package 811: Position Alignment Actions
  Personal Services                                    $          0   $     (12,105)    $    (143,129) $              0    $             0   $           0 $    (155,234)       (2)         -0.96
  Services and Supplies                                $          0   $           0     $     143,129 $               0    $             0   $           0 $     143,129         0           0.00

Package 813: Move Weed Control Grants to OWEB
  Special Payments                                     $          0   $   (2,544,125)   $             0   $           0    $             0   $           0 $   (2,544,125)         0        0.00

Package 819: Supplemental Statewide Ending Balance
  Personal Services                                    $     (95,373) $    (170,620)    $             0   $           0    $             0   $           0 $    (265,993)          0        0.00
  Services and Supplies                                $     (15,624) $     (61,504)    $             0   $           0    $             0   $           0 $     (77,128)          0        0.00


                                                                                                                                                                             HB 5002-A
         *Excludes Capital Construction Expenditures                                                                                                                         Page 2 of 3
                                                                                                  OTHER FUNDS                       FEDERAL FUNDS                TOTAL
                                                           GENERAL          LOTTERY                                                                               ALL
                     DESCRIPTION                            FUND             FUNDS            LIMITED           NONLIMITED       LIMITED           NONLIMITED    FUNDS         POS           FTE



Agricultural Development Policy Area
Package 801: Targeted Statewide Adjustments
  Services and Supplies                                $      (72,281) $        (1,049)   $             0   $           0    $             0   $           0 $      (73,330)         0         0.00

Package 802: Vacant Position Savings
  Personal Services                                    $           0    $             0   $             0   $           0    $     (139,021) $             0 $     (139,021)      (2)          -1.50

Package 810: Analyst Adjustments
  Personal Services                                    $     457,232    $             0   $             0   $           0    $             0   $           0 $     457,232           3         2.75
  Services and Supplies                                $     202,793    $             0   $             0   $           0    $             0   $           0 $     202,793           0         0.00

Package 811: Position Alignment Actions
  Personal Services                                    $           0    $             0   $     (161,011) $             0    $             0   $           0 $     (161,011)      (2)          -1.96

Package 819: Supplemental Statewide Ending Balance
  Personal Services                                    $      (89,950) $         (203)    $             0   $           0    $             0   $           0 $      (90,153)         0         0.00
  Services and Supplies                                $      (36,847) $         (560)    $             0   $           0    $             0   $           0 $      (37,407)         0         0.00



TOTAL ADJUSTMENTS                                      $     670,736    $   (3,107,282)   $   (2,441,725) $             0    $     (719,387) $             0 $   (5,597,658)     (38)        (16.60)

SUBCOMMITTEE RECOMMENDATION *                          $   12,610,616   $    6,356,014    $   52,132,748    $           0    $   11,945,878    $           0 $   83,045,256     468          343.29



% Change from 2009-11 Leg Approved Budget                       -3.1%           -37.3%              4.9%              0.0%            -2.8%              0.0%         -2.4%    -7.1%          -4.0%
% Change from 2011-13 Current Service Level                    -19.1%           -41.0%              3.4%              0.0%            -6.1%              0.0%         -7.2%    -6.6%          -3.1%
% Change from 2011-13 Gov's Recommended Budget                   5.6%           -32.8%             -4.5%              0.0%            -5.7%              0.0%         -6.3%    -7.5%          -4.6%




                                                                                                                                                                               HB 5002-A