Skip to content
← Find this measure

2009 REGULAR SESSION · SB 54

Introduced — SB 54 (2009R1)

This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.

Other indexed documents for this measure (5)
Recorded legislative activity (26)
  1. Introduction and First Reading Of Senate Measures
  2. Introduction and first reading. Referred to President's desk.
  3. Referred to Business and Transportation.
  4. Heard and Reported Out
  5. Public Hearing and Work Session held.
  6. Second Reading Of Senate Measures
  7. Recommendation: Do pass.
  8. Second reading.
  9. Carried over to 02-04 by unanimous consent.
  10. Third Reading Of Senate Measures
  11. Third reading. Carried by George. Passed.
  12. First Reading Of Senate Bills
  13. First reading. Referred to Speaker's desk.
  14. Referred to Business and Labor.
  15. Heard and Reported Out
  16. Public Hearing and Work Session held.
  17. Recommendation: Do pass and be placed on Consent Calendar.
  18. Second Reading Of Senate Bills
  19. Second reading.
  20. Consent Calendar
  21. Read third time under Consent Calendar. Passed.
  22. President signed.
  23. Speaker signed.
  24. Governor signed.
  25. Chapter 7, 2009 Laws.
  26. Effective date, January 1, 2010.
Citation and provenance

Oregon Legislature. Introduced — SB 54 (2009R1). 2009 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2009R1/Downloads/MeasureDocument/SB54/Introduced Retrieved 2026-09-02.

Document ID: doc_ffae868e2a692cbbd05e

Original SHA-256: 55e6479b94bef9a263c54bf99768ebb78fd62e1c134d42fa374b4290262413c0

Extracted text SHA-256: 368b22fa59bb0cf05549168c29df42ce54a6092f9a9885db5fe22c5b195bb6e5

                                 75th OREGON LEGISLATIVE ASSEMBLY--2009 Regular Session



                                                Senate Bill 54
     Printed pursuant to Senate Interim Rule 213.28 by order of the President of the Senate in conformance with pre-
          session filing rules, indicating neither advocacy nor opposition on the part of the President (at the request
          of Commissioner of the Bureau of Labor and Industries Brad Avakian)


                                                             SUMMARY
     The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
     to consideration by the Legislative Assembly. It is an editor′s brief statement of the essential features of the
     measure as introduced.

         Changes content requirement for certified statements of payroll records submitted by contrac-
     tors and subcontractors in connection with contracts for public works.

 1                                                   A BILL FOR AN ACT
 2   Relating to certified statements of payroll records for public works; creating new provisions; and
 3        amending ORS 279C.845.
 4   Be It Enacted by the People of the State of Oregon:
 5        SECTION 1. ORS 279C.845 is amended to read:
 6        279C.845. (1) The contractor or the contractor′s surety and every subcontractor or the subcon-
 7   tractor′s surety shall file certified statements with the public agency in writing, on a form pre-
 8   scribed by the Commissioner of the Bureau of Labor and Industries, certifying:
 9        (a) The hourly rate of wage paid each worker whom the contractor or the subcontractor has
10   employed upon the public works; and
11        (b) That no worker employed upon the public works has been paid less than the prevailing rate
12   of wage or less than the minimum hourly rate of wage specified in the contract.
13        (2) The certified statement shall be verified by the oath of the contractor or the contractor′s
14   surety or subcontractor or the subcontractor′s surety that the contractor or subcontractor has read
15   the certified statement, [and] that the contractor or subcontractor knows the contents [thereof]
16   of the certified statement and that [the same is true] to the contractor or subcontractor′s knowl-
17   edge the certified statement is true.
18        (3) The certified statements shall set out accurately and completely the contractor′s or sub-
19   contractor′ s payroll records [for the prior week], including the name and address of each worker,
20   the worker′s correct classification, rate of pay, daily and weekly number of hours worked[, de-
21   ductions made and actual wages paid] and the gross wages the worker earned upon the public
22   works during each week identified in the certified statement.
23        (4) The contractor or subcontractor shall deliver or mail each certified statement required by
24   subsection (1) of this section to the public agency. Certified statements for each week during which
25   the contractor or subcontractor employs a worker upon the public works shall be submitted once
26   a month, by the fifth business day of the following month. Information submitted on certified state-
27   ments may be used only to ensure compliance with the provisions of ORS 279C.800 to 279C.870.
28        (5) Each contractor or subcontractor shall preserve the certified statements for a period of three
29   years from the date of completion of the contract.
30        (6) Certified statements received by a public agency are public records subject to the provisions



     NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
     New sections are in boldfaced type.

     LC 826
                                                SB 54


 1   of ORS 192.410 to 192.505.
 2       (7) Notwithstanding ORS 279C.555 or 279C.570 (7), if a contractor is required to file certified
 3   statements under this section, the public agency shall retain 25 percent of any amount earned by
 4   the contractor on the public works until the contractor has filed with the public agency certified
 5   statements as required by this section. The public agency shall pay the contractor the amount re-
 6   tained under this subsection within 14 days after the contractor files the certified statements as
 7   required by this section, regardless of whether a subcontractor has failed to file certified statements
 8   as required by this section. The public agency is not required to verify the truth of the contents of
 9   certified statements filed by the contractor under this section.
10       (8) Notwithstanding ORS 279C.555, the contractor shall retain 25 percent of any amount earned
11   by a first-tier subcontractor on a public works until the subcontractor has filed with the public
12   agency certified statements as required by this section. The contractor shall verify that the first-tier
13   subcontractor has filed the certified statements before the contractor may pay the subcontractor any
14   amount retained under this subsection. The contractor shall pay the first-tier subcontractor the
15   amount retained under this subsection within 14 days after the subcontractor files the certified
16   statements as required by this section. Neither the public agency nor the contractor is required to
17   verify the truth of the contents of certified statements filed by a first-tier subcontractor under this
18   section.
19       SECTION 2. The amendments to ORS 279C.845 by section 1 of this 2009 Act apply to
20   contracts for public works first advertised or, if not advertised, first entered into on or after
21   the effective date of this 2009 Act.
22




                                                  [2]