Skip to content
← Find this measure

2025 Regular Session · HB 2656

OLIS measure summary

This is the OLIS summary, not the complete bill.

Other indexed documents for this measure (1)
  • OLIS measure summary · open
Recorded legislative activity (8)
  1. First Reading Of House Bills
  2. First reading. Referred to Speaker's desk.
  3. Referred to Climate, Energy, and Environment.
  4. Prohibits the Public Utility Commission, municipal electric utilities, electric cooperatives and people's utility districts from setting a maximum amount of cumulative generating capacity for solar net metering systems that is allowed to be interconnected.
  5. Public Hearing cancelled.
  6. Heard
  7. Public Hearing held.
  8. In committee upon adjournment.
Citation and provenance

Oregon Legislature. OLIS measure summary. 2025 Regular Session. https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB2656

Document ID: olis_measures_6f0bcc0e0dcd6f48cd7e6b01-summary

Extracted text SHA-256: 4959fb05c3ca9b2d11525e18a483fcf8b73bbc954c05849df90404324324a06c

Prohibits the Public Utility Commission, municipal electric utilities, electric cooperatives and people's utility districts from setting a maximum amount of cumulative generating capacity for solar net metering systems that is allowed to be interconnected.
	Digest: The Act makes changes to laws involving solar power systems. (Flesch Readability Score: 61.3). 
	Prohibits the Public Utility Commission, municipal electric utilities, electric cooperatives and people's utility districts from setting a maximum amount of cumulative generating capacity for solar net metering systems that is allowed to be interconnected.