← Find this measure
2025 Regular Session · HB 2656
OLIS measure summary
This is the OLIS summary, not the complete bill.
Other indexed documents for this measure (1)
- OLIS measure summary · open
Recorded legislative activity (8)
- First Reading Of House Bills
- First reading. Referred to Speaker's desk.
- Referred to Climate, Energy, and Environment.
- Prohibits the Public Utility Commission, municipal electric utilities, electric cooperatives and people's utility districts from setting a maximum amount of cumulative generating capacity for solar net metering systems that is allowed to be interconnected.
- Public Hearing cancelled.
- Heard
- Public Hearing held.
- In committee upon adjournment.
Citation and provenance
Oregon Legislature. OLIS measure summary. 2025 Regular Session. https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB2656
Document ID: olis_measures_6f0bcc0e0dcd6f48cd7e6b01-summary
Extracted text SHA-256: 4959fb05c3ca9b2d11525e18a483fcf8b73bbc954c05849df90404324324a06c
Prohibits the Public Utility Commission, municipal electric utilities, electric cooperatives and people's utility districts from setting a maximum amount of cumulative generating capacity for solar net metering systems that is allowed to be interconnected. Digest: The Act makes changes to laws involving solar power systems. (Flesch Readability Score: 61.3). Prohibits the Public Utility Commission, municipal electric utilities, electric cooperatives and people's utility districts from setting a maximum amount of cumulative generating capacity for solar net metering systems that is allowed to be interconnected.