← Find this measure
2025 Regular Session · SB 928
OLIS measure summary
This is the OLIS summary, not the complete bill.
Other indexed documents for this measure (1)
- OLIS measure summary · open
Recorded legislative activity (4)
- Introduction and First Reading Of Senate Measures
- Introduction and first reading. Referred to President's desk.
- Referred to Labor and Business.
- In committee upon adjournment.
Citation and provenance
Oregon Legislature. OLIS measure summary. 2025 Regular Session. https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/SB928
Document ID: olis_measures_78aeff7e145fd6bee41d2456-summary
Extracted text SHA-256: b6e249fe7d74412e75662600ae31814a941831f6f4292cc87d51a9e8e832097b
Requires public bodies that procure electric vehicles and solar photovoltaic energy systems to receive before entering a contract for the electric vehicle or solar photovoltaic energy system a certification from the manufacturer, distributor, vendor or supplier that the production, assembly, transportation or sale of the electric vehicle or solar photovoltaic energy system did not use or involve forced labor or oppressive child labor. Digest: Tells a public body that buys electric cars or solar panels that it needs proof from the vendor that no forced labor was used in producing the car or panel. Specifies penalties for lying about the proof. (Flesch Readability Score: 66.8). Requires public bodies that procure electric vehicles and solar photovoltaic energy systems to receive before entering a contract for the electric vehicle or solar photovoltaic energy system a certification from the manufacturer, distributor, vendor or supplier that the production, assembly, transportation or sale of the electric vehicle or solar photovoltaic energy system did not use or involve forced labor or oppressive child labor. Requires probative evidence to accompany the certification. Provides that a person that supplies a certification that is false, materially misleading, illegitimate, untruthful, forged or substantially inaccurate is liable for a civil penalty of not more than $10,000 or half of the price the public body paid for the electric vehicle or solar photovoltaic energy system. Subjects the public body to similar penalties for knowingly or intentionally accepting a certification that the public body knows is false, materially misleading, illegitimate, untruthful, forged or substantially inaccurate. Takes effect on the 91st day following adjournment sine die.