← Find this measure
2025 Regular Session · HB 2065
OLIS measure summary
This is the OLIS summary, not the complete bill.
Other indexed documents for this measure (1)
- OLIS measure summary · open
Recorded legislative activity (32)
- First Reading Of House Bills
- First reading. Referred to Speaker's desk.
- Referred to Climate, Energy, and Environment.
- Heard
- Public Hearing held.
- Heard and Reported Out with Amendments
- Work Session held.
- Recommendation: Do pass with amendments, be printed A-Engrossed, and be referred to Ways and Means.
- Referred to Ways and Means by order of Speaker.
- Assigned to Subcommittee On Natural Resources.
- Heard and Reported Out with Amendments
- Work Session held.
- Returned to Full Committee.
- Heard and Reported Out with Amendments
- Work Session held.
- Recommendation: Do pass with amendments and be printed B-Engrossed.
- Second Reading Of House Bills
- Second reading.
- Third Reading Of House Bills
- First Reading Of House Measures
- Third reading. Carried by Lively. Passed.
- First reading. Referred to President's desk.
- Referred to Ways and Means.
- Second Reading Of House Measures
- Third Reading Of House Measures
- Recommendation: Do pass the B-Eng. bill.
- Second reading.
- Rules suspended. Third reading. Carried by Frederick. Passed.
- Speaker signed.
- President signed.
- Governor signed.
- Chapter 471, (2025 Laws): Effective date September 26, 2025.
Citation and provenance
Oregon Legislature. OLIS measure summary. 2025 Regular Session. https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB2065
Document ID: olis_measures_f4a76c0b9c4b30a700a6dff6-summary
Extracted text SHA-256: 52dbd7704aafe2fb2c6b32be4bdd20fa9410adff15eafd81d426fa6f0e11a59e
Allows a person to contract with a third-party consultant to conduct a study or engineering evaluation that a public utility requires for an application to interconnect a microgrid or community microgrid. Digest: Allows the use of a third party to study or evaluate a request to connect a microgrid to a power grid. (Flesch Readability Score: 60.6). Allows a person to contract with a third-party consultant to conduct a study or engineering evaluation that a public utility requires for an application to interconnect a microgrid or community microgrid. Allows a contracted third-party consultant to receive from a public utility all technical data necessary to conduct the study or engineering evaluation and submit to the public utility a preliminary design for review. Requires a public utility to approve or deny an application based on safety, reliability and compliance with published standards. Takes effect on the 91st day following adjournment sine die.