Extracted source text, not Atlas analysis. Native PDF text, pypdf; NFKC normalization. Charts and image-only text may be absent; verify against the linked original. Extraction does not imply page-by-page substantive review. PDF page numbers count from the first page of the file and may differ from printed page numbers.
(C) State Highway 30 and
Hughes Lane intersection
in Baker County
(D) Eastern Oregon Trade and
Event Center access road
(E) Pedestrian safety
improvements in the
City of Heppner
(F) Pedestrian safety
improvements in the
City of Milton-Freewater
(G) Columbia Development
Authority Access Road
(H) Pedestrian safety
improvements
in the City of Burns
(I) Pedestrian safety
improvements
in the City of Irrigon
(J) U.S. Highway 20 freight
mobility enhancements
(K) Cedar Street and Hughes
Lane enhancements in
Baker County
(3)(a) When the commission determines that a project described in this section is com-
pleted, the commission shall reallocate any amount remaining from the allocation made un-
der this section to another project described in the same region.
(b) When the commission determines that all of the projects within a region are com-
pleted, the commission shall reallocate any amount remaining from the allocation made un-
der this section to any other project listed in this section.
(4) The amounts described in this section for jurisdiction transfers described in section
134 of this 2017 Act may not be allocated until after the transfer for which the allocation is
dedicated occurs.
NOTE: Section 71e was deleted by amendment. Subsequent sections were not renumbered.
SECTION 71f. Multimodal projects. (1) Notwithstanding ORS 367.080 to 367.086 and sub-
ject to subsection (3) of this section and the availability of funds, the Department of Trans-
portation shall first distribute the moneys in the Connect Oregon Fund, other than moneys
dedicated for purposes described in Article XV, section 4a, of the Oregon Constitution, for
the projects listed in subsection (2) of this section.
(2) The department shall distribute the following amounts for the projects listed below:
(a) Mid-Willamette Valley
Intermodal Facility ............. $ 25 million
(b) Treasure Valley
Intermodal Facility ............. $ 26 million
(c) Rail expansion in
East Beach Industrial
Park at the
Port of Morrow ................... $ 6.55 million
Enrolled House Bill 2017 (HB 2017-A) Page 79
Cite this record
Oregon Legislative Assembly. HB 2017 (2017), enrolled text, PDF p. 79. Retrieved 2026-09-04. https://olis.oregonlegislature.gov/liz/2017R1/Downloads/MeasureDocument/HB2017/Enrolled#page=79. Preserved SHA-256: 5ab76901b63ba88f2742eab37f5e9ddd922a3ffd53e76165eec6dd08f4f9282a. Atlas edition: institutional-studies-2026-09-27-stif-v2.