2007 REGULAR SESSION · SJR 15

Staff Measure Summary — SJR 15 (2007R1)

This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.

Other indexed documents for this measure (5)
Recorded legislative activity (27)
  1. Introduction and First Reading Of Senate Measures
  2. Introduction and first reading. Referred to President's desk.
  3. Referred to Business, Transportation and Workforce Development.
  4. Heard and Reported Out
  5. Public Hearing and Work Session held.
  6. Second Reading Of Senate Measures
  7. Recommendation: Be adopted.
  8. Second reading.
  9. Placed on 03-05 calendar. (SR 8.81)
  10. Taken from 03-05 Calendar and placed on 02-28 Calendar by unanimous consent.
  11. Third Reading Of Senate Measures
  12. Final reading. Carried by Metsger. Adopted.
  13. First Reading - Memorials and Resolutions
  14. First reading. Referred to Speaker's desk.
  15. Referred to Transportation.
  16. Heard
  17. Public Hearing held.
  18. Not Heard
  19. Heard and Reported Out
  20. Public Hearing and Work Session held.
  21. Recommendation: Be adopted.
  22. Rules suspended. Carried over to June 7, 2007 Calendar.
  23. Final Reading: Memorials and Resolutions
  24. Read. Carried by Beyer. Adopted.
  25. President signed.
  26. Speaker signed.
  27. Filed With Secretary of State.
Citation and provenance

Oregon Legislature. Staff Measure Summary — SJR 15 (2007R1). 2007 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2007R1/Downloads/MeasureAnalysisDocument/5672 Retrieved 2026-09-02.

Document ID: doc_4f0bb684eb3aa44729fe

Original SHA-256: 0e7d1d69fd9ff271af1063a30881b703e9e4f2438b622446d6f6a8522fcbb001

Extracted text SHA-256: 76871ecf10a565cbe537217985551b4758e70b696062fdd72af9239675238f3e

74th OREGON LEGISLATIVE ASSEMBLY - 2007 Regular Session                         MEASURE:              SJR 15
STAFF MEASURE SUMMARY                                                           CARRIER:              Rep. Beyer
House Committee on Transportation

REVENUE: No revenue impact
FISCAL: No fiscal impact
Action:              Be Adopted
Vote:                7-0-0
            Yeas:    Buckley, Butler, Gilman, Read, Smith G., Tomei, Beyer
            Nays:    0
            Exc.:    0
Prepared By:         Judith Callens, Administrator
Meeting Dates:       5/21, 5/30

WHAT THE MEASURE DOES: Declares legislative support for the Columbia River Crossing Project. Recognizes
that the project will require strong partnerships among all levels of government, the private sector, and citizens of
Oregon and Washington. Recognizes the importance of various modes of transportation as well as the environment,
businesses, and neighborhoods affected. Declares support for the continuation of bi-state and bi-partisan efforts in
planning, coordinating, and funding the project and for the cooperation of the federal government in providing funding
and streamlining the regulatory process.

ISSUES DISCUSSED:
   • Need for increased transportation capacity over Columbia River
   • Five crossing alternatives under consideration; funding options
   • Decision making process and federal, state, and local roles
   • Impacts to neighborhoods near the crossing
   • Light rail resistance by Vancouver Washington
   • Importance of continued bi-state discussions, coordination and cooperation

EFFECT OF COMMITTEE AMENDMENT: No amendment.

BACKGROUND: The Interstate 5 highway bridges over the Columbia River are currently over capacity and create one
of the worst bottlenecks to commerce and the movement of people on the West Coast. The northbound bridge was built
in 1917, and the southbound bridge in 1958. Both bridges are lift spans that must be raised almost daily to allow certain
ships to pass. The number of interchange exits and entrances in the five-mile area effectively reduce the through-travel
lanes to two in each direction, creating hours-long congestion in the morning and evening, and whenever even a minor
incident occurs on the bridge. The lack of shoulder width precludes pulling a stalled or disabled vehicle out of the travel
lanes. Current traffic of 125,000 vehicles per weekday is expected to reach 180,000 vehicles a day by 2020.

Bi-state and multi-jurisdiction committees began meeting in the 1990’s, most recently the I-5 Transportation and Trade
Partnership in 2001, followed by the Columbia River Crossing Task Force. One project completed in north Vancouver
and a series of projects in the Delta Park area just south of the Columbia, which will begin construction next year, are
part of the congestion relief efforts recommended by these committees. The Draft Environmental Impact Statement
process is underway for the Columbia crossing itself. Several alternatives, including a “no-build” option, will be taken
through the analysis. The other two alternatives recommended by the project team at this point are a replacement bridge
with “bus rapid transit” service and a replacement bridge with light rail transit.




6/4/2007 5:02:00 PM
This summary has not been adopted or officially endorsed by action of the committee.