2007 REGULAR SESSION · SJR 15

Staff Measure Summary — SJR 15 (2007R1)

This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.

Other indexed documents for this measure (5)
Recorded legislative activity (27)
  1. Introduction and First Reading Of Senate Measures
  2. Introduction and first reading. Referred to President's desk.
  3. Referred to Business, Transportation and Workforce Development.
  4. Heard and Reported Out
  5. Public Hearing and Work Session held.
  6. Second Reading Of Senate Measures
  7. Recommendation: Be adopted.
  8. Second reading.
  9. Placed on 03-05 calendar. (SR 8.81)
  10. Taken from 03-05 Calendar and placed on 02-28 Calendar by unanimous consent.
  11. Third Reading Of Senate Measures
  12. Final reading. Carried by Metsger. Adopted.
  13. First Reading - Memorials and Resolutions
  14. First reading. Referred to Speaker's desk.
  15. Referred to Transportation.
  16. Heard
  17. Public Hearing held.
  18. Not Heard
  19. Heard and Reported Out
  20. Public Hearing and Work Session held.
  21. Recommendation: Be adopted.
  22. Rules suspended. Carried over to June 7, 2007 Calendar.
  23. Final Reading: Memorials and Resolutions
  24. Read. Carried by Beyer. Adopted.
  25. President signed.
  26. Speaker signed.
  27. Filed With Secretary of State.
Citation and provenance

Oregon Legislature. Staff Measure Summary — SJR 15 (2007R1). 2007 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2007R1/Downloads/MeasureAnalysisDocument/5673 Retrieved 2026-09-02.

Document ID: doc_e8c3cee84969e238e5c4

Original SHA-256: d8bd724bd810054ca3ac9003f21852b9f6b581886280003d71c01fcb0d1a950d

Extracted text SHA-256: df81cc792cbab32cf3eef9d1122ecb14176ce38713eda33fbe745bdba7eef42d

74th OREGON LEGISLATIVE ASSEMBLY - 2007 Regular Session              MEASURE:                        SJR 15
STAFF MEASURE SUMMARY                                                CARRIER:                        Sen. Metsger
Senate Committee on Business, Transportation, and Workforce Development

REVENUE: No revenue impact
FISCAL: No fiscal impact
Action:              Be Adopted
Vote:                5-0-0
            Yeas:    Deckert, George L., Monnes Anderson, Starr, Metsger
            Nays:    0
            Exc.:    0
Prepared By:         Janet Adkins, Administrator
Meeting Dates:       2/16

WHAT THE MEASURE DOES: Declares legislative support for the Columbia River Crossing Project. Recognizes
that the project will require strong partnerships among all levels of government, the private sector, and citizens of
Oregon and Washington. Recognizes the importance of various modes of transportation as well as the environment,
businesses, and neighborhoods affected. Declares support for the continuation of bi-state and bi-partisan efforts in
planning, coordinating, and funding the project and for the cooperation of the federal government in providing funding
and streamlining the regulatory process.

ISSUES DISCUSSED:
   • Bi-state scoping efforts dating back to the 1990’s
   • History of the current crossings - construction, funding, use, and limitations
   • Project costs of a new bridge and interchanges – funding options
   • Decision making process and federal, state, and local roles
   • Whether the focus of the project is too narrow, whether other approaches should still be considered
   • Comparison of Oregon and Washington Public Private Partnership authorities
   • When private sector involvement should begin
   • Importance of continued bi-state cooperation

     Note: Discussion included several members of the Washington State Senate Transportation Committee in a joint
     meeting.

EFFECT OF COMMITTEE AMENDMENT: No amendment.

BACKGROUND: The Interstate 5 highway bridges over the Columbia River are currently over capacity and create one
of the worst bottlenecks to commerce and the movement of people on the West Coast. The northbound bridge was built
in 1917, and the southbound bridge in 1958. Both bridges are lift spans that must be raised almost daily to allow certain
ships to pass. The number of interchange exits and entrances in the five-mile area effectively reduce the through-travel
lanes to two in each direction, creating hours-long congestion in the morning and evening, and whenever even a minor
incident occurs on the bridge. The lack of shoulder width precludes pulling a stalled or disabled vehicle out of the travel
lanes. Current traffic of 125,000 vehicles per weekday is expected to reach 180,000 vehicles a day by 2020.

Bi-state and multi-jurisdiction committees began meeting in the 1990’s, most recently the I-5 Transportation and Trade
Partnership in 2001, followed by the Columbia River Crossing Task Force. One project completed in north Vancouver
and a series of projects in the Delta Park area just south of the Columbia, which will begin construction next year, are
part of the congestion relief efforts recommended by these committees. The Draft Environmental Impact Statement
process is underway for the Columbia crossing itself. Several alternatives, including a “no-build” option, will be taken
through the analysis. The other two alternatives recommended by the project team at this point are a replacement bridge
with “bus rapid transit” service and a replacement bridge with light rail transit.




2/22/2007 8:20:00 AM
This summary has not been adopted or officially endorsed by action of the committee.