Skip to content
← Find this measure

2020 2nd Special Session · SB 5722

Introduced — SB 5722 (2020S2)

This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.

Other indexed documents for this measure (7)
Recorded legislative activity (23)
  1. Introduction and First Reading Of Senate Measures
  2. Second Reading Of Senate Measures
  3. Third Reading Of Senate Measures
  4. First Reading Of Senate Bills
  5. Second Reading Of Senate Bills
  6. Third Reading Of Senate Bills
  7. Introduction and first reading. Referred to President's desk.
  8. Referred to The Second Special Session of 2020.
  9. Heard and Reported Out
  10. Work Session held.
  11. Recommendation: Do pass.
  12. Rules suspended. Second reading.
  13. Rules suspended. Third reading. Carried by Findley. Passed.
  14. First reading. Referred to Speaker's desk.
  15. Referred to The Second Special Session of 2020.
  16. Recommendation: Do pass.
  17. Rules suspended. Second reading.
  18. Rules suspended. Third reading. Carried by Holvey. Passed.
  19. President signed.
  20. Speaker signed.
  21. Governor signed.
  22. Chapter 6, 2020 Laws.
  23. Effective date, September 20, 2020.
Citation and provenance

Oregon Legislature. Introduced — SB 5722 (2020S2). 2020 2nd Special Session. https://olis.oregonlegislature.gov/liz/2020S2/Downloads/MeasureDocument/SB5722/Introduced Retrieved 2026-09-02.

Document ID: doc_76ee58af4052c7473815

Original SHA-256: 98ae80d8fb64da5d3728022381df2493cd36fe00de7372fa0232b54cbf0b07b3

Extracted text SHA-256: 5ac4dc76a59f30c480eaeb9786e6f810bb2a20f9041d7b41d8bba7431f483c0b

                                80th OREGON LEGISLATIVE ASSEMBLY--2020 Second Special Session



                                                  Senate Bill 5722
     Sponsored by JOINT COMMITTEE ON THE SECOND SPECIAL SESSION OF 2020


                                                                   SUMMARY
     The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
     to consideration by the Legislative Assembly. It is an editor’s brief statement of the essential features of the
     measure as introduced.

         Modifies limits on payment of expenses from specified funds by certain state agencies for capital
     construction.
         Declares emergency, effective on passage.

 1                                                         A BILL FOR AN ACT
 2   Relating to state financial administration; creating new provisions; amending sections 1 and 3,
 3        chapter 808, Oregon Laws 2015, sections 1 and 3, chapter 747, Oregon Laws 2017, and sections
 4        1 and 3, chapter 662, Oregon Laws 2019; and declaring an emergency.
 5   Be It Enacted by the People of the State of Oregon:
 6        SECTION 1. Section 1, chapter 662, Oregon Laws 2019, is amended to read:
 7        Sec. 1. Notwithstanding any other law limiting expenditures, the following amounts are estab-
 8   lished for a six-year period beginning July 1, 2019, as the maximum limits for payment of expenses
 9   from fees, moneys or other revenues, including Miscellaneous Receipts, but excluding lottery funds
10   and federal funds, collected or received by the state agencies listed, for the acquisition of land and
11   the acquisition, planning, constructing, altering, repairing, furnishing and equipping of buildings and
12   facilities:
13       (1)       Oregon Department of
14                 Administrative Services:
15       (a)       Deferred Maintenance ..................... $ 10,524,000
16       (b)       Justice Building
17                 Exterior Updates............................... $     5,000,000
18       (c)       Revenue Building
19                 Electrical System Upgrades ........... $ 10,000,000
20       (d)       Portland State Office
21                 Building Upgrades ............................ $      8,600,000
22       (e)       Wilsonville Building
23                 Purchase.............................................. $ 24,000,000
24       (f)       Electric Vehicle Charging
25                 Infrastructure ........................... $          3,800,000
26       (g)       Parking Facility Repair
27                 and Upgrades ............................ $           2,800,000
28       (h)       Security and Security
29                 Systems..................................... $        2,000,000
30       (i)       Oregon State Fair
31                 Horse Barn................................ $          3,000,000


     NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
     New sections are in boldfaced type.

     LC 11
                                                         SB 5722


 1   (j)   Oregon State Fair
 2         Poultry Barn ............................. $            2,000,000
 3   (k)   Oregon State Fair Facilities
 4         Capital Improvements............... $                   5,325,925
 5   (2)   Oregon Military Department:
 6   (a)   Salem and Pendleton
 7         Aviation Facility
 8         Emergency Enhancements .............. $                  9,852,000
 9   (b)   Salem and Anderson
10         Readiness Center Service
11         Life Extension.................................... $     5,800,000
12   (c)   Jackson Armory Service
13         Life Extension.................................... $     4,275,000
14   (d)   Oregon Military Museum................ $                 2,000,000
15   (3)   Oregon Youth Authority:
16   (a)   Tillamook Medical and
17         Dental Renovations .......................... $          1,521,875
18   (b)   MacLaren Infirmary and
19         Pharmacy Renovation ...................... $             1,804,000
20   (c)   Oak Creek Medical and
21         Dental Clinic Renovations .............. $               1,271,202
22   (d)   Control Room Renovations ............. $                 1,772,500
23   (4)   Department of Corrections:
24   (a)   Radio System Replacement ............. $ 13,998,225
25   (b)   Camera Systems Upgrades.............. $                  8,633,804
26   (c)   Capital Improvement and
27         Renewal ............................................... $ 24,478,039
28   (5)   Department of Transportation:
29   (a)   South Coast Maintenance
30         Station ................................................. $ 12,000,000
31   (b)   Central Coast Maintenance
32         [Station................................................. $ 8,000,000]
33         Station ...................................... $        1,883,267
34   (6)   Oregon Department of Aviation:
35   (a)   Prospect State Airport
36         Runway Reconstruction................... $               2,160,000
37   (b)   Aurora State Airport
38         Run-Up Area Construction ............. $                   205,000
39   (c)   Condon State Airport
40         Runway Rehabilitation..................... $               260,000
41   (d)   Siletz Bay State Airport
42         Taxiway Rehabilitation.................... $               114,000
43   (7)   Housing and Community
44         Services Department:
45   (a)   Local Innovation and Fast


                                                             [2]
                                                                    SB 5722


 1                 [Track (LIFT) Housing .................... $150,000,000]
 2                 Track (LIFT) Housing ............... $200,000,000
 3       (b)       Permanent Supportive
 4                 Housing................................................ $ 50,000,000
 5       (8)       Oregon Judicial Department:
 6       (a)       Multnomah County Courthouse
 7                 Furnishings and Equipment ............ $                    8,500,000
 8       (b)       Oregon Supreme Court
 9                 Building Renovation ......................... $ 27,820,000
10       (9)       Legislative Administration
11                 Committee, Capitol Accessibility
12                 Maintenance and Safety............ $ 68,050,000
13       SECTION 2. Section 3, chapter 662, Oregon Laws 2019, is amended to read:
14       Sec. 3. Notwithstanding any other law limiting expenditures, the amount of [$77,700,000]
15   $256,725,000 is established for a six-year period beginning July 1, 2019, as the maximum limit for
16   payment of expenses from fees, moneys or other revenues, including Miscellaneous Receipts, but
17   excluding lottery funds and federal funds, collected or received by the Higher Education Coordi-
18   nating Commission, for expenditures of proceeds from state bonds issued for the benefit of a public
19   university, pursuant to agreements between the commission and a public university.
20       SECTION 3. Section 1, chapter 747, Oregon Laws 2017, as amended by section 1, chapter 106,
21   Oregon Laws 2018, is amended to read:
22       Sec. 1. Notwithstanding any other law limiting expenditures, the following amounts are estab-
23   lished for a six-year period beginning July 1, 2017, as the maximum limits for payment of expenses
24   from fees, moneys or other revenues, including Miscellaneous Receipts, but excluding lottery funds
25   and federal funds, collected or received by the state agencies listed, for the acquisition of land and
26   the acquisition, planning, constructing, altering, repairing, furnishing and equipping of buildings and
27   facilities:
28       (1)       Oregon Department of
29                 Administrative Services:
30       (a)       Oregon Resilience Buildings .......... $                    7,079,431
31       (b)       Department of Human
32                 Services Building Upgrades............ $                    3,743,000
33       (c)       Employment Building
34                 Upgrades ............................................. $    6,236,000
35       (d)       Electrical Upgrades and
36                 Replacements...................................... $        3,890,000
37       (e)       Capitol Mall Parking
38                 Structure Study and
39                 Upgrades ............................................. $    2,926,000
40       (f)       Planning .............................................. $    500,000
41       (g)       Boiler and Heating
42                 Upgrades ............................................. $    1,234,000
43       (h)       Portland Crime Lab
44                 Upgrade ............................................... $   1,162,000
45       (i)       Parking Lot Upgrades...................... $                3,500,000


                                                                        [3]
                                                               SB 5722


 1   (j)   Portland State Office
 2         Building Renovation ......................... $ 13,146,000
 3   (k)   State Data Center
 4         Power Upgrades ................................ $ 11,000,000
 5   (L)   Elected Official Staff
 6         Relocation ........................................... $        6,300,000
 7   (2)   Oregon Military Department:
 8   (a)   Regional Armory
 9         Emergency Enhancement ................ $                        8,534,400
10   (b)   Grants Pass Armory Service
11         Life Extension.................................... $            3,270,356
12   (c)   Future Readiness Center
13         Sites...................................................... $   1,730,000
14   (3)   Oregon Youth Authority:
15   (a)   Capital Improvements ...................... $ 17,168,249
16   (b)   MacLaren [7] West Cottages
17         Renovation .......................................... $ 21,177,200
18   (c)   Rogue Valley Facility
19         Improvements ..................................... $ 10,973,465
20   (4)   Department of Corrections:
21   (a)   Capital Improvements and
22         Renewal ............................................... $ 26,347,534
23   (b)   Technology Infrastructure .............. $ 12,200,000
24   (5)   Department of Veterans’
25         Affairs:
26   (a)   Roseburg Veterans’ Home............... $ 10,500,000
27   (b)   Oregon Veterans’ Home
28         Capital Improvements ...................... $                   2,450,000
29   (c)   The Dalles Veterans’ Home
30         Capital Improvements ...................... $                   2,111,875
31   (d)   Lebanon Veterans’ Home
32         Capital Improvements ...................... $                   1,305,815
33   (6)   Department of Transportation,
34         Toledo Maintenance
35         [Station Phase 1................................. $ 6,300,000]
36         Station Phase 1 ......................... $                      219,876
37   (7)   Oregon Department of Aviation:
38   (a)   Bandon Electrical, Gate,
39         Obstruction Removal........................ $                    192,500
40   (b)   McDermitt State Airport
41         Runway and Taxi .............................. $                 120,000
42   (c)   Chiloquin Taxi and Fencing ........... $                         110,000
43   (d)   Lebanon Taxi and Apron
44         Rehabilitation..................................... $            110,000
45   (8)   State Department of Fish and


                                                                    [4]
                                                               SB 5722


 1                 Wildlife, Deferred Maintenance..... $ 10,000,000
 2       (9)       State Forestry Department,
 3                 Toledo Facility Replacement.......... $                3,832,965
 4       (10) Housing and Community
 5                 Services Department,
 6                 Family Affordable Housing ............. $ 80,000,000
 7       (11) Department of
 8                 Education, Oregon School
 9                 for the Deaf Facility
10                 Improvements ..................................... $   4,297,558
11       (12) Legislative Administration
12                 Committee, Capitol Accessibility
13                 Maintenance and Safety .................. $ 23,269,092
14       (13) Oregon Judicial Department:
15       (a)       Multnomah County Courthouse
16                 Furnishings and Equipment ............ $               8,900,000
17       (b)       Oregon Supreme Court
18                 Building Renovation ......................... $        6,000,000
19       SECTION 4. Section 3, chapter 747, Oregon Laws 2017, as amended by section 3, chapter 106,
20   Oregon Laws 2018, and section 7, chapter 662, Oregon Laws 2019, is amended to read:
21       Sec. 3. Notwithstanding any other law limiting expenditures, the amount of [$399,475,000]
22   $340,975,000 is established for a six-year period beginning July 1, 2017, as the maximum limit for
23   payment of expenses from fees, moneys or other revenues, including Miscellaneous Receipts and
24   reimbursements from federal service agreements, but excluding lottery funds and federal funds not
25   described in this section, collected or received by the Higher Education Coordinating Commission,
26   for expenditures of proceeds from state bonds issued for the benefit of a public university, pursuant
27   to agreements between the commission and a public university.
28       SECTION 5. Notwithstanding any other law limiting expenditures, and in lieu of the lim-
29   itation on expenditures established at the December 2018 Emergency Board meeting (Item
30   No. 22), the amount of $6,012,404 is established for a six-year period beginning July 1, 2017,
31   as the maximum limit for payment of expenses for the Oregon Youth Challenge Program
32   expansion from federal funds collected or received by the Oregon Military Department.
33       SECTION 6. Section 1, chapter 808, Oregon Laws 2015, as amended by section 1, chapter 67,
34   Oregon Laws 2016, section 10, chapter 747, Oregon Laws 2017, and section 4, chapter 106, Oregon
35   Laws 2018, is amended to read:
36       Sec. 1. Notwithstanding any other law limiting expenditures, the following amounts are estab-
37   lished for a six-year period beginning July 1, 2015, as the maximum limits for payment of expenses
38   from fees, moneys or other revenues, including Miscellaneous Receipts, but excluding lottery funds
39   and federal funds, collected or received by the state agencies listed, for the acquisition of land and
40   the acquisition, planning, constructing, altering, repairing, furnishing and equipping of buildings and
41   facilities:
42       (1)       Oregon Department of
43                 Administrative Services:
44       (a)       North Campus Demolition
45                 and Site Improvement ...................... $          8,300,000


                                                                   [5]
                                                               SB 5722


 1   (b)    Department of Environmental
 2          Quality Public Health Lab
 3          Emergency Generator Upgrade ..... $                           2,926,140
 4   (c)    Employment Building Upgrades .... $                           2,217,398
 5   (d)    Electrical Upgrades/
 6          Replacements...................................... $          2,089,795
 7   (e)    Department of Human
 8          Services Building, Cooling
 9          Tower Replacement .......................... $                1,701,702
10   (f)    Executive Building
11          Elevator Upgrades ............................ $               875,461
12   (g)    Executive Building Fire
13          Sprinkler.............................................. $       89,322
14   (h)    Planning .............................................. $      350,000
15   (i)    Capital Investments/
16          Acquisitions ........................................ $ 17,000,000
17   (j)    Executive Building Central
18          Stairway Upgrade ............................. $               377,443
19   (k)    Oregon State Fair
20          Capital Repairs and
21          Deferred Maintenance ..................... $                  2,500,000
22   (2)    Oregon Military Department:
23   (a)    New Headquarters
24          Facilities.............................................. $    6,700,000
25   [(b)   Youth Challenge Armory ................. $ 4,977,000]
26   (b)    Youth Challenge Armory .......... $                           5,214,468
27   (c)    Planning and Predesign ................... $                   136,281
28   (d)    Oregon Military Museum................ $                      1,104,689
29   (e)    Regional Training Institute ............ $ 11,500,000
30   (3)    Oregon Youth Authority:
31   (a)    Rogue Valley Facility
32          Improvements ..................................... $          9,880,000
33   (b)    MacLaren Facility
34          Improvements ..................................... $ 30,934,000
35   (c)    CCTV Cameras .................................. $             1,147,435
36   (d)    Deferred Maintenance
37          and Capital Improvements .............. $                     7,058,000
38   (4)    Department of Corrections,
39          Deferred Maintenance ..................... $ 14,220,432
40   (5)    Housing and Community
41          Services Department,
42          Family Affordable Housing ............. $ 40,000,000
43   (6)    Department of Transportation:
44   (a)    South Coast Maintenance
45          Station ................................................. $   4,500,000


                                                                   [6]
                                                                 SB 5722


 1      (b)   Meacham Maintenance
 2            Station ................................................. $   7,500,000
 3      (c)   Maintenance Facilities
 4            Colocation ........................................... $             1
 5      (d)   Highway Improvement
 6            Projects................................................ $ 35,000,000
 7      (7)   Oregon Department of Aviation:
 8      (a)   Condon State Airport,
 9            Renovations ........................................ $         226,111
10      (b)   McDermitt State Airport,
11            Rehabilitation..................................... $          259,599
12      (c)   Aurora State Airport, Apron/
13            Taxiway and Taxilane Project....... $                          130,000
14      (8)   Department of Veterans’
15            Affairs, The Dalles Veterans’
16            Home Renovation .............................. $              2,475,976
17      (9)   State Department of Fish and
18            Wildlife:
19      (a)   Cedar Creek Hatchery and Fish
20            Passage Improvements ..................... $                  2,000,000
21      (b)   Lower Deschutes River Ranch
22            Acquisition.......................................... $        227,269
23      (10) Legislative Administration Committee,
24            State Capitol Capital Repairs
25            and Improvements ............................. $ 30,000,000
26       SECTION 7. Section 3, chapter 808, Oregon Laws 2015, as amended by section 3, chapter 67,
27   Oregon Laws 2016, is amended to read:
28       Sec. 3. Notwithstanding any other law limiting expenditures, the amount of [$321,417,945]
29   $311,417,945 is established for a six-year period beginning July 1, 2015, as the maximum limit for
30   payment of expenses from fees, moneys or other revenues, including Miscellaneous Receipts and
31   reimbursements from federal service agreements, but excluding lottery funds and federal funds not
32   described in this section, collected or received by the Higher Education Coordinating Commission,
33   for expenditures of proceeds from state bonds issued for the benefit of a public university, pursuant
34   to agreements between the commission and a public university.
35       SECTION 8. This 2020 second special session Act being necessary for the immediate
36   preservation of the public peace, health and safety, an emergency is declared to exist, and
37   this 2020 second special session Act takes effect on its passage.
38




                                                                     [7]