Skip to content
← Find this measure

2020 2nd Special Session · SB 5722

Enrolled — SB 5722 (2020S2)

This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.

Other indexed documents for this measure (7)
Recorded legislative activity (23)
  1. Introduction and First Reading Of Senate Measures
  2. Second Reading Of Senate Measures
  3. Third Reading Of Senate Measures
  4. First Reading Of Senate Bills
  5. Second Reading Of Senate Bills
  6. Third Reading Of Senate Bills
  7. Introduction and first reading. Referred to President's desk.
  8. Referred to The Second Special Session of 2020.
  9. Heard and Reported Out
  10. Work Session held.
  11. Recommendation: Do pass.
  12. Rules suspended. Second reading.
  13. Rules suspended. Third reading. Carried by Findley. Passed.
  14. First reading. Referred to Speaker's desk.
  15. Referred to The Second Special Session of 2020.
  16. Recommendation: Do pass.
  17. Rules suspended. Second reading.
  18. Rules suspended. Third reading. Carried by Holvey. Passed.
  19. President signed.
  20. Speaker signed.
  21. Governor signed.
  22. Chapter 6, 2020 Laws.
  23. Effective date, September 20, 2020.
Citation and provenance

Oregon Legislature. Enrolled — SB 5722 (2020S2). 2020 2nd Special Session. https://olis.oregonlegislature.gov/liz/2020S2/Downloads/MeasureDocument/SB5722/Enrolled Retrieved 2026-09-02.

Document ID: doc_efd429b092ec2b1bb7ae

Original SHA-256: 933afc00e2ea92fb8cd76f1091163537e7be34686f8849caf9b9a396d364e109

Extracted text SHA-256: 93275ce367c1979cd2895c48bf2b07d5552f07c1b78a839e3765a53eecff05ee

                    80th OREGON LEGISLATIVE ASSEMBLY--2020 Second Special Session



                                                    Enrolled
                                   Senate Bill 5722
Sponsored by JOINT COMMITTEE ON THE SECOND SPECIAL SESSION OF 2020



                                     CHAPTER .................................................



                                                         AN ACT



Relating to state financial administration; creating new provisions; amending sections 1 and 3,
    chapter 808, Oregon Laws 2015, sections 1 and 3, chapter 747, Oregon Laws 2017, and sections
    1 and 3, chapter 662, Oregon Laws 2019; and declaring an emergency.

Be It Enacted by the People of the State of Oregon:

     SECTION 1. Section 1, chapter 662, Oregon Laws 2019, is amended to read:
     Sec. 1. Notwithstanding any other law limiting expenditures, the following amounts are estab-
lished for a six-year period beginning July 1, 2019, as the maximum limits for payment of expenses
from fees, moneys or other revenues, including Miscellaneous Receipts, but excluding lottery funds
and federal funds, collected or received by the state agencies listed, for the acquisition of land and
the acquisition, planning, constructing, altering, repairing, furnishing and equipping of buildings and
facilities:
     (1) Oregon Department of
            Administrative Services:
     (a) Deferred Maintenance ..................... $ 10,524,000
     (b) Justice Building
            Exterior Updates............................... $ 5,000,000
     (c) Revenue Building
            Electrical System Upgrades ........... $ 10,000,000
     (d) Portland State Office
            Building Upgrades ............................ $ 8,600,000
     (e) Wilsonville Building
            Purchase.............................................. $ 24,000,000
     (f) Electric Vehicle Charging
            Infrastructure ........................... $ 3,800,000
     (g) Parking Facility Repair
            and Upgrades ............................ $ 2,800,000
     (h) Security and Security
            Systems..................................... $ 2,000,000
     (i)    Oregon State Fair
            Horse Barn................................ $ 3,000,000
     (j)    Oregon State Fair
            Poultry Barn ............................. $ 2,000,000
     (k) Oregon State Fair Facilities

Enrolled Senate Bill 5722 (SB 5722-INTRO)                                                        Page 1
          Capital Improvements............... $ 5,325,925
    (2)   Oregon Military Department:
    (a)   Salem and Pendleton
          Aviation Facility
          Emergency Enhancements .............. $ 9,852,000
    (b)   Salem and Anderson
          Readiness Center Service
          Life Extension.................................... $ 5,800,000
    (c)   Jackson Armory Service
          Life Extension.................................... $ 4,275,000
    (d)   Oregon Military Museum................ $ 2,000,000
    (3)   Oregon Youth Authority:
    (a)   Tillamook Medical and
          Dental Renovations .......................... $ 1,521,875
    (b)   MacLaren Infirmary and
          Pharmacy Renovation ...................... $ 1,804,000
    (c)   Oak Creek Medical and
          Dental Clinic Renovations .............. $ 1,271,202
    (d)   Control Room Renovations ............. $ 1,772,500
    (4)   Department of Corrections:
    (a)   Radio System Replacement ............. $ 13,998,225
    (b)   Camera Systems Upgrades.............. $ 8,633,804
    (c)   Capital Improvement and
          Renewal ............................................... $ 24,478,039
    (5)   Department of Transportation:
    (a)   South Coast Maintenance
          Station ................................................. $ 12,000,000
    (b)   Central Coast Maintenance
          [Station................................................. $ 8,000,000]
          Station ...................................... $ 1,883,267
    (6)   Oregon Department of Aviation:
    (a)   Prospect State Airport
          Runway Reconstruction................... $ 2,160,000
    (b)   Aurora State Airport
          Run-Up Area Construction ............. $                       205,000
    (c)   Condon State Airport
          Runway Rehabilitation..................... $                   260,000
    (d)   Siletz Bay State Airport
          Taxiway Rehabilitation.................... $                   114,000
    (7)   Housing and Community
          Services Department:
    (a)   Local Innovation and Fast
          [Track (LIFT) Housing .................... $150,000,000]
          Track (LIFT) Housing ............... $200,000,000
    (b)   Permanent Supportive
          Housing................................................ $ 50,000,000
    (8)   Oregon Judicial Department:
    (a)   Multnomah County Courthouse
          Furnishings and Equipment ............ $ 8,500,000
    (b)   Oregon Supreme Court
          Building Renovation ......................... $ 27,820,000
    (9)   Legislative Administration

Enrolled Senate Bill 5722 (SB 5722-INTRO)                                          Page 2
            Committee, Capitol Accessibility
            Maintenance and Safety............ $ 68,050,000
     SECTION 2. Section 3, chapter 662, Oregon Laws 2019, is amended to read:
     Sec. 3. Notwithstanding any other law limiting expenditures, the amount of [$77,700,000]
$256,725,000 is established for a six-year period beginning July 1, 2019, as the maximum limit for
payment of expenses from fees, moneys or other revenues, including Miscellaneous Receipts, but
excluding lottery funds and federal funds, collected or received by the Higher Education Coordi-
nating Commission, for expenditures of proceeds from state bonds issued for the benefit of a public
university, pursuant to agreements between the commission and a public university.
     SECTION 3. Section 1, chapter 747, Oregon Laws 2017, as amended by section 1, chapter 106,
Oregon Laws 2018, is amended to read:
     Sec. 1. Notwithstanding any other law limiting expenditures, the following amounts are estab-
lished for a six-year period beginning July 1, 2017, as the maximum limits for payment of expenses
from fees, moneys or other revenues, including Miscellaneous Receipts, but excluding lottery funds
and federal funds, collected or received by the state agencies listed, for the acquisition of land and
the acquisition, planning, constructing, altering, repairing, furnishing and equipping of buildings and
facilities:
     (1) Oregon Department of
            Administrative Services:
     (a) Oregon Resilience Buildings .......... $ 7,079,431
     (b) Department of Human
            Services Building Upgrades............ $ 3,743,000
     (c) Employment Building
            Upgrades ............................................. $ 6,236,000
     (d) Electrical Upgrades and
            Replacements...................................... $ 3,890,000
     (e) Capitol Mall Parking
            Structure Study and
            Upgrades ............................................. $ 2,926,000
     (f)    Planning .............................................. $       500,000
     (g) Boiler and Heating
            Upgrades ............................................. $ 1,234,000
     (h) Portland Crime Lab
            Upgrade ............................................... $ 1,162,000
     (i)    Parking Lot Upgrades...................... $ 3,500,000
     (j)    Portland State Office
            Building Renovation ......................... $ 13,146,000
     (k) State Data Center
            Power Upgrades ................................ $ 11,000,000
     (L) Elected Official Staff
            Relocation ........................................... $ 6,300,000
     (2) Oregon Military Department:
     (a) Regional Armory
            Emergency Enhancement ................ $ 8,534,400
     (b) Grants Pass Armory Service
            Life Extension.................................... $ 3,270,356
     (c) Future Readiness Center
            Sites...................................................... $ 1,730,000
     (3) Oregon Youth Authority:
     (a) Capital Improvements ...................... $ 17,168,249
     (b) MacLaren [7] West Cottages
            Renovation .......................................... $ 21,177,200

Enrolled Senate Bill 5722 (SB 5722-INTRO)                                                       Page 3
    (c)  Rogue Valley Facility
         Improvements ..................................... $ 10,973,465
    (4) Department of Corrections:
    (a) Capital Improvements and
         Renewal ............................................... $ 26,347,534
    (b) Technology Infrastructure .............. $ 12,200,000
    (5) Department of Veterans’
         Affairs:
    (a) Roseburg Veterans’ Home............... $ 10,500,000
    (b) Oregon Veterans’ Home
         Capital Improvements ...................... $ 2,450,000
    (c) The Dalles Veterans’ Home
         Capital Improvements ...................... $ 2,111,875
    (d) Lebanon Veterans’ Home
         Capital Improvements ...................... $ 1,305,815
    (6) Department of Transportation,
         Toledo Maintenance
         [Station Phase 1................................. $ 6,300,000]
         Station Phase 1 ......................... $                  219,876
    (7) Oregon Department of Aviation:
    (a) Bandon Electrical, Gate,
         Obstruction Removal........................ $                192,500
    (b) McDermitt State Airport
         Runway and Taxi .............................. $             120,000
    (c) Chiloquin Taxi and Fencing ........... $                      110,000
    (d) Lebanon Taxi and Apron
         Rehabilitation..................................... $        110,000
    (8) State Department of Fish and
         Wildlife, Deferred Maintenance..... $ 10,000,000
    (9) State Forestry Department,
         Toledo Facility Replacement.......... $ 3,832,965
    (10) Housing and Community
         Services Department,
         Family Affordable Housing ............. $ 80,000,000
    (11) Department of
         Education, Oregon School
         for the Deaf Facility
         Improvements ..................................... $ 4,297,558
    (12) Legislative Administration
         Committee, Capitol Accessibility
         Maintenance and Safety .................. $ 23,269,092
    (13) Oregon Judicial Department:
    (a) Multnomah County Courthouse
         Furnishings and Equipment ............ $ 8,900,000
    (b) Oregon Supreme Court
         Building Renovation ......................... $ 6,000,000
    SECTION 4. Section 3, chapter 747, Oregon Laws 2017, as amended by section 3, chapter 106,
Oregon Laws 2018, and section 7, chapter 662, Oregon Laws 2019, is amended to read:
    Sec. 3. Notwithstanding any other law limiting expenditures, the amount of [$399,475,000]
$340,975,000 is established for a six-year period beginning July 1, 2017, as the maximum limit for
payment of expenses from fees, moneys or other revenues, including Miscellaneous Receipts and
reimbursements from federal service agreements, but excluding lottery funds and federal funds not

Enrolled Senate Bill 5722 (SB 5722-INTRO)                                                   Page 4
described in this section, collected or received by the Higher Education Coordinating Commission,
for expenditures of proceeds from state bonds issued for the benefit of a public university, pursuant
to agreements between the commission and a public university.
     SECTION 5. Notwithstanding any other law limiting expenditures, and in lieu of the
limitation on expenditures established at the December 2018 Emergency Board meeting (Item
No. 22), the amount of $6,012,404 is established for a six-year period beginning July 1, 2017,
as the maximum limit for payment of expenses for the Oregon Youth Challenge Program
expansion from federal funds collected or received by the Oregon Military Department.
     SECTION 6. Section 1, chapter 808, Oregon Laws 2015, as amended by section 1, chapter 67,
Oregon Laws 2016, section 10, chapter 747, Oregon Laws 2017, and section 4, chapter 106, Oregon
Laws 2018, is amended to read:
     Sec. 1. Notwithstanding any other law limiting expenditures, the following amounts are estab-
lished for a six-year period beginning July 1, 2015, as the maximum limits for payment of expenses
from fees, moneys or other revenues, including Miscellaneous Receipts, but excluding lottery funds
and federal funds, collected or received by the state agencies listed, for the acquisition of land and
the acquisition, planning, constructing, altering, repairing, furnishing and equipping of buildings and
facilities:
     (1) Oregon Department of
            Administrative Services:
     (a) North Campus Demolition
            and Site Improvement ...................... $ 8,300,000
     (b) Department of Environmental
            Quality Public Health Lab
            Emergency Generator Upgrade ..... $ 2,926,140
     (c) Employment Building Upgrades .... $ 2,217,398
     (d) Electrical Upgrades/
            Replacements...................................... $ 2,089,795
     (e) Department of Human
            Services Building, Cooling
            Tower Replacement .......................... $ 1,701,702
     (f)    Executive Building
            Elevator Upgrades ............................ $             875,461
     (g) Executive Building Fire
            Sprinkler.............................................. $     89,322
     (h) Planning .............................................. $       350,000
     (i)    Capital Investments/
            Acquisitions ........................................ $ 17,000,000
     (j)    Executive Building Central
            Stairway Upgrade ............................. $             377,443
     (k) Oregon State Fair
            Capital Repairs and
            Deferred Maintenance ..................... $ 2,500,000
     (2) Oregon Military Department:
     (a) New Headquarters
            Facilities.............................................. $ 6,700,000
     [(b) Youth Challenge Armory ................. $ 4,977,000]
     (b) Youth Challenge Armory .......... $ 5,214,468
     (c) Planning and Predesign ................... $                    136,281
     (d) Oregon Military Museum................ $ 1,104,689
     (e) Regional Training Institute ............ $ 11,500,000
     (3) Oregon Youth Authority:
     (a) Rogue Valley Facility

Enrolled Senate Bill 5722 (SB 5722-INTRO)                                                       Page 5
         Improvements ..................................... $ 9,880,000
    (b)  MacLaren Facility
         Improvements ..................................... $ 30,934,000
    (c) CCTV Cameras .................................. $ 1,147,435
    (d) Deferred Maintenance
         and Capital Improvements .............. $ 7,058,000
    (4) Department of Corrections,
         Deferred Maintenance ..................... $ 14,220,432
    (5) Housing and Community
         Services Department,
         Family Affordable Housing ............. $ 40,000,000
    (6) Department of Transportation:
    (a) South Coast Maintenance
         Station ................................................. $ 4,500,000
    (b) Meacham Maintenance
         Station ................................................. $ 7,500,000
    (c) Maintenance Facilities
         Colocation ........................................... $            1
    (d) Highway Improvement
         Projects................................................ $ 35,000,000
    (7) Oregon Department of Aviation:
    (a) Condon State Airport,
         Renovations ........................................ $        226,111
    (b) McDermitt State Airport,
         Rehabilitation..................................... $         259,599
    (c) Aurora State Airport, Apron/
         Taxiway and Taxilane Project....... $                         130,000
    (8) Department of Veterans’
         Affairs, The Dalles Veterans’
         Home Renovation .............................. $ 2,475,976
    (9) State Department of Fish and
         Wildlife:
    (a) Cedar Creek Hatchery and Fish
         Passage Improvements ..................... $ 2,000,000
    (b) Lower Deschutes River Ranch
         Acquisition.......................................... $       227,269
    (10) Legislative Administration Committee,
         State Capitol Capital Repairs
         and Improvements ............................. $ 30,000,000
    SECTION 7. Section 3, chapter 808, Oregon Laws 2015, as amended by section 3, chapter 67,
Oregon Laws 2016, is amended to read:
    Sec. 3. Notwithstanding any other law limiting expenditures, the amount of [$321,417,945]
$311,417,945 is established for a six-year period beginning July 1, 2015, as the maximum limit for
payment of expenses from fees, moneys or other revenues, including Miscellaneous Receipts and
reimbursements from federal service agreements, but excluding lottery funds and federal funds not
described in this section, collected or received by the Higher Education Coordinating Commission,
for expenditures of proceeds from state bonds issued for the benefit of a public university, pursuant
to agreements between the commission and a public university.
    SECTION 8. This 2020 second special session Act being necessary for the immediate
preservation of the public peace, health and safety, an emergency is declared to exist, and
this 2020 second special session Act takes effect on its passage.




Enrolled Senate Bill 5722 (SB 5722-INTRO)                                                      Page 6
Passed by Senate August 10, 2020                                                            Received by Governor:

                                                                                            ........................M.,........................................................., 2020
       ..................................................................................
                                                                                            Approved:
                      Lori L. Brocker, Secretary of Senate

                                                                                            ........................M.,........................................................., 2020

       ..................................................................................
                       Peter Courtney, President of Senate
                                                                                                         ..................................................................................
                                                                                                                                                  Kate Brown, Governor
Passed by House August 10, 2020
                                                                                            Filed in Office of Secretary of State:

       ..................................................................................   ........................M.,........................................................., 2020
                                 Tina Kotek, Speaker of House


                                                                                                         ..................................................................................
                                                                                                                                   Bev Clarno, Secretary of State




Enrolled Senate Bill 5722 (SB 5722-INTRO)                                                                                                                                     Page 7