Skip to content
← Find this measure

2007 REGULAR SESSION · HB 2118

A-Engrossed — HB 2118 (2007R1)

This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.

Other indexed documents for this measure (9)
Recorded legislative activity (32)
  1. First Reading Of House Bills
  2. First reading. Referred to Speaker's desk.
  3. Referred to Energy and the Environment with subsequent referral to Ways and Means.
  4. Heard
  5. Public Hearing held.
  6. Heard and Reported Out
  7. Work Session held.
  8. Recommendation: Do pass with amendments, be printed A-Engrossed, and be referred to Ways and Means by prior reference.
  9. Referred to Ways and Means by prior reference.
  10. Assigned to Subcommittee On Natural Resources.
  11. Heard and Reported Out
  12. Public Hearing and Work Session held.
  13. Returned to Full Committee.
  14. Heard and Reported Out with Amendments
  15. Work Session held.
  16. Recommendation: Do pass with amendments and be printed B-Engrossed.
  17. Second Reading Of House Bills
  18. Second reading.
  19. Third Reading Of House Bills
  20. First Reading Of House Measures
  21. Third reading. Carried by Burley. Passed.
  22. First reading. Referred to President's desk.
  23. Referred to Ways and Means.
  24. Second Reading Of House Measures
  25. Recommendation: Do pass the B-Eng. bill.
  26. Second reading.
  27. Third Reading Of House Measures
  28. Third reading. Carried by Nelson. Passed.
  29. Speaker signed.
  30. President signed.
  31. Governor signed.
  32. Chapter 297, (2007 Laws): Effective date June 4, 2007.
Citation and provenance

Oregon Legislature. A-Engrossed — HB 2118 (2007R1). 2007 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2007R1/Downloads/MeasureDocument/HB2118/A-Engrossed Retrieved 2026-09-02.

Document ID: doc_9e680686e78d28a58a39

Original SHA-256: 4009eb6a96ade90ea9bb7e3b331dd08f6df89605fd20d7dfc328d992f1a1566e

Extracted text SHA-256: 9070737e64405dab02cd56e6aa9bb4dc35def52dfe31327498199d11391480dd

                                 74th OREGON LEGISLATIVE ASSEMBLY--2007 Regular Session



                                                       A-Engrossed
                                              House Bill 2118
                                                  Ordered by the House March 13
                                           Including House Amendments dated March 13

     Ordered printed by the Speaker pursuant to House Rule 12.00A (5). Presession filed (at the request of Governor
         Theodore R. Kulongoski for Department of Environmental Quality)


                                                             SUMMARY
     The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
     to consideration by the Legislative Assembly. It is an editor′s brief statement of the essential features of the
     measure.

          Vests specific authority with Environmental Quality Commission to implement underground in-
     jection control program portion of federal Safe Drinking Water Act. Allows commission to adopt
     rules and schedule of fees. Establishes schedule of fees for subsurface injection of fluids. Allows
     commission by rule to exempt from permit requirements certain subsurface injections of fluids.
          Creates Subsurface Injection Fluids Account. Continuously appropriates account moneys for
     payment of administrative expenses of underground injection control program.
          Provides that penalties recovered by Department of Environmental Quality for violation
     of rules adopted by commission in regard to underground injection control program be paid
     into Watershed Improvement Grant Fund.
          Declares emergency, effective on passage.

 1                                                   A BILL FOR AN ACT
 2   Relating to underground injection control program; creating new provisions; amending ORS 468.135
 3        and 468B.053; appropriating money; and declaring an emergency.
 4   Be It Enacted by the People of the State of Oregon:
 5        SECTION 1. Sections 2 to 4 of this 2007 Act are added to and made a part of ORS chapter
 6   468B.
 7        SECTION 2. (1) The Environmental Quality Commission may perform or cause to be
 8   performed any acts necessary for the implementation within this state of the underground
 9   injection control program of the federal Safe Drinking Water Act, 42 U.S.C. 300h et seq., as
10   in effect on the effective date of this 2007 Act, and federal regulations or guidelines issued
11   pursuant to the Safe Drinking Water Act. The commission may adopt all rules necessary for
12   the administration and implementation of this subsection.
13        (2) The commission by rule may establish a schedule of fees for the subsurface injection
14   of fluids. Fees established under this section are in addition to fees imposed pursuant to ORS
15   468.065 for permits issued pursuant to ORS 468B.050.
16        (3) Any fees received under subsection (2) of this section shall be deposited in the State
17   Treasury to the credit of the Subsurface Injection Fluids Account established under section
18   4 of this 2007 Act.
19        SECTION 3. (1) The Department of Environmental Quality shall collect the following fees
20   for the subsurface injection of fluids, covered by rules adopted by the Environmental Quality
21   Commission under section 2 of this 2007 Act, on the first day of the calendar month following
22   the effective date of this 2007 Act, and ending on the first day of the calendar month fol-
23   lowing the effective date of rules adopted by the Environmental Quality Commission under


     NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
     New sections are in boldfaced type.

     LC 821
                                          A-Eng. HB 2118


 1   section 2 of this 2007 Act setting fees for the subsurface injection of fluids:
 2       (a) For the subsurface injection of fluids from a common roof drain determined to be an
 3   environmental risk to groundwater, $100 for each subsurface injection well.
 4       (b) For the subsurface injection of fluids from a commercial facility, an industrial facility
 5   or a facility owned by a public body as defined in ORS 174.109 that injects fluids into fewer
 6   than 50 wells, that does not store, handle or use hazardous materials and that generates
 7   fewer than 1,000 vehicle trips per year, $125 for each subsurface injection well.
 8       (c) For a subsurface injection well receiving high temperature water from a geothermal
 9   facility, $10,000 for the first year and $200 for each subsequent year.
10       (d) For any subsurface injection well not described in paragraphs (a) to (c) of this sub-
11   section, $300 for each subsurface injection well for the first year and $100 for each subse-
12   quent year.
13       (e) For decommissioning a subsurface injection well used for the subsurface injection of
14   fluids, $100.
15       (2) Any fees received under subsection (1) of this section shall be deposited in the State
16   Treasury to the credit of the Subsurface Injection Fluids Account.
17       SECTION 4. The Subsurface Injection Fluids Account is established separate and distinct
18   from the General Fund. Interest earned by the account shall be credited to the account.
19   Moneys in the account are continuously appropriated to the Department of Environmental
20   Quality and may be used only to pay the administrative expenses of the underground in-
21   jection control program implemented under section 2 of this 2007 Act.
22       SECTION 5. ORS 468B.053 is amended to read:
23       468B.053. In lieu of a permit required under ORS 468B.025 or 468B.050, the Environmental
24   Quality Commission by rule may:
25       (1) Exempt de minimis discharges from permit requirements.
26       (2) Exempt from permit requirements subsurface injection of fluids that are authorized
27   under the underground injection control program of the Department of Environmental
28   Quality pursuant to section 2 of this 2007 Act.
29       [(2)] (3) Establish performance-based criteria for exempt operations and discharges.
30       [(3)] (4) Require an operator or person discharging waste exempt under subsection (1) of this
31   section to:
32       (a) Comply with the criteria established under subsection [(2)] (3) of this section; and
33       (b) Monitor performance and certify and report the results to the Department of Environmental
34   Quality.
35       SECTION 6. ORS 468.135 is amended to read:
36       468.135. (1) Any civil penalty under ORS 468.140 shall be imposed in the manner provided in
37   ORS 183.745.
38       (2) Except as provided in subsection (3) of this section, all penalties recovered under ORS
39   468.140 shall be paid into the State Treasury and credited to the General Fund, or in the event the
40   penalty is recovered by a regional air quality control authority, it shall be paid into the county
41   treasury of the county in which the violation occurred.
42       (3) All penalties recovered by the Department of Environmental Quality for violation of
43   any rules adopted by the Environmental Quality Commission under section 2 of this 2007 Act
44   shall be paid into the Watershed Improvement Grant Fund established by ORS 541.397.
45       SECTION 7. This 2007 Act being necessary for the immediate preservation of the public


                                                 [2]
                                     A-Eng. HB 2118


1   peace, health and safety, an emergency is declared to exist, and this 2007 Act takes effect
2   on its passage.
3




                                           [3]