← Find this measure
2007 REGULAR SESSION · HB 2118
Staff Measure Summary — HB 2118 (2007R1)
This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.
Other indexed documents for this measure (9)
- Staff Measure Summary — HB 2118 (2007R1)
- Staff Measure Summary — HB 2118 (2007R1) · open
- A-Engrossed — HB 2118 (2007R1)
- B-Engrossed — HB 2118 (2007R1)
- Enrolled — HB 2118 (2007R1)
- House Amendments to A-Engrossed — HB 2118 (2007R1)
- House Amendments — HB 2118 (2007R1)
- Introduced — HB 2118 (2007R1)
- OLIS measure summary
Recorded legislative activity (32)
- First Reading Of House Bills
- First reading. Referred to Speaker's desk.
- Referred to Energy and the Environment with subsequent referral to Ways and Means.
- Heard
- Public Hearing held.
- Heard and Reported Out
- Work Session held.
- Recommendation: Do pass with amendments, be printed A-Engrossed, and be referred to Ways and Means by prior reference.
- Referred to Ways and Means by prior reference.
- Assigned to Subcommittee On Natural Resources.
- Heard and Reported Out
- Public Hearing and Work Session held.
- Returned to Full Committee.
- Heard and Reported Out with Amendments
- Work Session held.
- Recommendation: Do pass with amendments and be printed B-Engrossed.
- Second Reading Of House Bills
- Second reading.
- Third Reading Of House Bills
- First Reading Of House Measures
- Third reading. Carried by Burley. Passed.
- First reading. Referred to President's desk.
- Referred to Ways and Means.
- Second Reading Of House Measures
- Recommendation: Do pass the B-Eng. bill.
- Second reading.
- Third Reading Of House Measures
- Third reading. Carried by Nelson. Passed.
- Speaker signed.
- President signed.
- Governor signed.
- Chapter 297, (2007 Laws): Effective date June 4, 2007.
Citation and provenance
Oregon Legislature. Staff Measure Summary — HB 2118 (2007R1). 2007 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2007R1/Downloads/MeasureAnalysisDocument/3387 Retrieved 2026-09-02.
Document ID: doc_ba4473468b9513e07c2c
Original SHA-256: 83bb128b1e5505488b350d72b10989aeaecd6c09d70a706ce0e6c40936d4eb80
Extracted text SHA-256: c843474030449fca17d42aac81684ab19b0f8b25874a83847745631c573a083c
74th OREGON LEGISLATIVE ASSEMBLY - 2007 Regular Session MEASURE: HB 2118-A
STAFF MEASURE SUMMARY CARRIER:
House Committee on Energy and the Environment
REVENUE: No revenue impact
FISCAL: Fiscal statement issued
Action: Do Pass as Amended and Be Printed Engrossed and Be Referred to the Committee on Ways and
Means by Prior Reference
Vote: 7-0-0
Yeas: Beyer, Burley, Cannon, Jenson, Macpherson, Smith G., Dingfelder
Nays: -
Exc.: -
Prepared By: Cat McGinnis, Administrator
Meeting Dates: 2/16, 3/5
WHAT THE MEASURE DOES: Authorizes Environmental Quality Commission (EQC) to implement and establish fees
for underground injection control (UIC) program portion of federal Safe Drinking Water Act. Directs that fees be
deposited in Subsurface Injection Fluids Account created under the Act, and that fees be continuously appropriated to the
Department of Environmental Quality (DEQ) to fund UIC program administration. Sets fees for the subsurface injection
of fluids after passage of the Act and until fees are established by rule. Authorizes EQC to exempt from Water Pollution
Control Facility Permit requirements those UICs authorized under the UIC program. Directs that all penalties DEQ
recovers for violations of UIC rules adopted by the EQC be deposited into the Watershed Improvement Grant Fund.
Declares emergency, effective on passage.
ISSUES DISCUSSED:
• Changes in service levels if UIC program primacy returned to U.S. Environmental Protection Agency (EPA)
• Service levels and funding of other state UIC programs in EPA Region 10
• Impact on single-family homes, duplexes and triplexes with roof drain UICs—standard for “de minimus discharges”
• Basis for DEQ determination that UIC poses an environmental risk
EFFECT OF COMMITTEE AMENDMENT:
• Directs that all penalties DEQ recovers for violations of UIC rules adopted by the EQC be deposited into the
Watershed Improvement Grant Fund
• Inserts fee amounts and clarifies that fees apply to common roof drains only when they pose environmental risk to
groundwater
BACKGROUND: The federal government began the Underground Injection Control (UIC) Program in 1974 as part
of the Safe Drinking Water Act. DEQ assumed primary enforcement responsibility for the UIC program in Oregon in
1984. The program’s goal is to protect underground freshwater supplies from contamination due to underground
injection control systems. The most common underground injection control systems in Oregon are stormwater
drywells. DEQ authorizes some UICs by permit and others by rule. Currently, 45,500 UICS are registered in Oregon.
Annually, on average, DEQ registers 1,550 new UIC systems and approves 1,250 UICs as meeting Oregon rules. The
UIC program is not currently funded by fees. The only fees available for UIC work are fees for Water Pollution
Control Facility permits, which are issued to qualifying owners of multiple UICs. The EPA provides funding for
slightly less than one full-time staff person to administer the UIC program in Oregon.
3/12/2007 4:05:00 PM