Skip to content

PDF p. 77

HB 2017 (2017), enrolled text

Extracted source text, not Atlas analysis. Native PDF text, pypdf; NFKC normalization. Charts and image-only text may be absent; verify against the linked original. Extraction does not imply page-by-page substantive review. PDF page numbers count from the first page of the file and may differ from printed page numbers.

(B) WaNaPa Street improvements in the City of Cascade Locks (C) Port of Hood River bridge replacement environmental impact study (D) Columbia Boulevard pedestrian safety (E) Southeast Powell Boulevard jurisdiction transfer as described under section 134 of this 2017 Act (F) Interstate 205 active traffic management project (G) Interstate 205 corridor bottleneck project (H) State Highway 217 Northbound project (I) State Highway 217 Southbound project (J) Improvements to Graham Road where it intersects with Interstate 84 in the City of Troutdale (b) Region 2: ............................. $ 201,950,000 (A) Oregon Manufacturing Innovation Center Access Roads in Columbia County (B) Interstate 5 at the Aurora-Donald interchange, Phase I (C) State Highway 99E in the City of Halsey (D) State Highway 214 pedestrian safety improvements at the intersection with Jefferson Street in the City of Silverton (E) Territorial Highway jurisdiction transfer as described under section 134 of this this 2017 Act (F) U.S. Highway 20 safety upgrades from the City of Albany to the City of Corvallis (G) State Highway 58, adding passing lanes west of the Enrolled House Bill 2017 (HB 2017-A) Page 77

Cite this record

Oregon Legislative Assembly. HB 2017 (2017), enrolled text, PDF p. 77. Retrieved 2026-09-04. https://olis.oregonlegislature.gov/liz/2017R1/Downloads/MeasureDocument/HB2017/Enrolled#page=77. Preserved SHA-256: 5ab76901b63ba88f2742eab37f5e9ddd922a3ffd53e76165eec6dd08f4f9282a. Atlas edition: institutional-studies-2026-09-27-stif-v2.

Text checksum

ff40f56f7665a4d78d2e834ba9049f50a13451ae374bf1e4ea35ff0bd361e1de