← Find this measure
2007 REGULAR SESSION · SB 838
House Amendments to B-Engrossed — SB 838 (2007R1)
This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.
Other indexed documents for this measure (12)
- Staff Measure Summary — SB 838 (2007R1)
- Staff Measure Summary — SB 838 (2007R1)
- Staff Measure Summary — SB 838 (2007R1)
- A-Engrossed — SB 838 (2007R1)
- B-Engrossed — SB 838 (2007R1)
- C-Engrossed — SB 838 (2007R1)
- Enrolled — SB 838 (2007R1)
- House Amendments to A-Engrossed — SB 838 (2007R1)
- House Amendments to B-Engrossed — SB 838 (2007R1) · open
- Introduced — SB 838 (2007R1)
- Senate Amendments — SB 838 (2007R1)
- OLIS measure summary
Recorded legislative activity (57)
- Introduction and First Reading Of Senate Measures
- Introduction and first reading. Referred to President's desk.
- Referred to Environment and Natural Resources.
- Heard
- Public Hearing held.
- Heard
- Public Hearing and Work Session held.
- Heard
- Public Hearing held.
- Heard and Reported Out with Amendments
- Work Session held.
- Recommendation: Do pass with amendments. (Printed A-Eng.)
- Second Reading Of Senate Measures
- Second reading.
- Third Reading Of Senate Measures
- Made a Special Order of Business by voice vote.
- Third reading. Carried by Atkinson, Avakian. Passed.
- Nelson declared potential conflict of interest.
- Vote explanation(s) filed by Verger.
- First Reading Of Senate Bills
- First reading. Referred to Speaker's desk.
- Referred to Energy and the Environment.
- Heard
- Public Hearing held.
- Heard
- Public Hearing held.
- Heard
- Public Hearing held.
- Not Heard
- Not Heard
- Not Heard
- Heard and Reported Out
- Work Session held.
- Not Heard
- Recommendation: Do pass with amendments and be printed B-Engrossed.
- Amendments distributed.
- Not Heard
- Second Reading Of Senate Bills
- Second reading.
- Third Reading Of Senate Bills
- Third reading.
- Motion to rerefer to Energy and the Environment carried. Rereferred.
- Heard and Reported Out
- Work Session held.
- Recommendation: Do pass with amendments and be printed C-Engrossed.
- Rules suspended. Made a Special Order of Business on May 23, 2007 Calendar.
- Special Orders Of Business
- Read. Carried by Dingfelder. Passed.
- Potential conflict(s) of interest declared by Jenson, Smith, G.
- Vote explanation(s) filed by Thatcher.
- Possible Consideration of House Amendments
- Senate concurred in House amendments and repassed bill.
- President signed.
- Speaker signed.
- Governor signed.
- Chapter 301, 2007 Laws.
- Effective date, June 6, 2007.
Citation and provenance
Oregon Legislature. House Amendments to B-Engrossed — SB 838 (2007R1). 2007 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2007R1/Downloads/MeasureDocument/SB838/House Amendments to B-Engrossed Retrieved 2026-09-02.
Document ID: doc_30391bc8ebadd78d7d50
Original SHA-256: 2341fa476761d12a4fcd6ff9600782655f94532d71d4036eefc71909dd60940b
Extracted text SHA-256: 2e25f1ee58b5c076c97e3009c44b2b2e8cb1a37b43cc56595f7f1756283f0df1
74th OREGON LEGISLATIVE ASSEMBLY--2007 Regular Session
HOUSE AMENDMENTS TO
B-ENGROSSED SENATE BILL 838
By COMMITTEE ON ENERGY AND THE ENVIRONMENT
May 18
1 On page 4 of the printed B-engrossed bill, line 30, delete “one and one-half” and insert “three”.
2 In line 42, delete “one and one-half” and insert “three”.
3 In line 45, delete “one and one-half” and insert “three”.
4 On page 5, line 4, delete “one and one-half” and insert “three”.
5 Delete lines 24 through 30 and insert:
6 “ SECTION 7. Small electric utilities. (1) Except as provided in this section, an electric utility
7 that makes sales of electricity to retail electricity consumers in an amount that equals less than
8 three percent of all electricity sold to retail electricity consumers is not subject to sections 1 to 24
9 of this 2007 Act.
10 “(2) Beginning in calendar year 2025, at least five percent of the electricity sold to retail elec-
11 tricity consumers in a calendar year by an electric utility must be qualifying electricity if the elec-
12 tric utility makes sales of electricity to retail electricity consumers in an amount that equals less
13 than one and one-half percent of all electricity sold to retail electricity consumers.
14 “(3) Beginning in calendar year 2025, at least 10 percent of the electricity sold to retail elec-
15 tricity consumers in a calendar year by an electric utility must be qualifying electricity if the elec-
16 tric utility makes sales of electricity to retail electricity consumers in an amount that equals or is
17 more than one and one-half percent, and less than three percent, of all electricity sold to retail
18 electricity consumers.”.
19 In line 31, delete “(3)” and insert “(4)”.
20 Delete lines 39 and 40 and insert:
21 “(c) Acquisition of electricity under a contract entered into before the effective date of this 2007
22 Act;
23 “(d) A renewal or replacement contract for a contract for purchase of electricity described in
24 paragraph (c) of this subsection;”.
25 In line 41, delete “(d)” and insert “(e)”.
26 Delete line 43.
27 In line 44, delete “(e)” and insert “(f)”.
28 On page 6, line 1, delete the period and insert “or entered into before the effective date of this
29 2007 Act by an electric cooperative organized under ORS chapter 62 of which the electric utility is
30 a member, without regard to whether the electricity is being used to serve the load of the electric
31 utility on the effective date of this 2007 Act; or
32 “(g) Investments in an electricity generating facility that uses coal as an energy source if the
33 investments are for the purpose of improving the facility′s pollution mitigation equipment or the
34 facility′s efficiency or are necessary to comply with requirements or standards imposed by govern-
35 mental entities.”.
LC 3152-3/SB 838-B79
1 In line 2, delete “(4)” and insert “(5)”.
2 In line 5, delete “(5)” and insert “(6)”.
3 In line 6, delete “(3) or (4)” and insert “(4) or (5)”.
4 In line 9, delete “(6)” and insert “(7)”.
5 On page 9, delete lines 22 through 34 and insert:
6 “(3) The Public Utility Commission shall establish an automatic adjustment clause as defined in
7 ORS 757.210 or another method that allows timely recovery of costs prudently incurred by an elec-
8 tric company to construct or otherwise acquire facilities that generate electricity from renewable
9 energy sources and for associated electricity transmission. Notwithstanding any other provision of
10 law, upon the request of any interested person the commission shall conduct a proceeding to estab-
11 lish the terms of the automatic adjustment clause or other method for timely recovery of costs. The
12 commission shall provide parties to the proceeding with the procedural rights described in ORS
13 756.500 to 756.610, including but not limited to the opportunity to develop an evidentiary record,
14 conduct discovery, introduce evidence, conduct cross-examination and submit written briefs and oral
15 argument. The commission shall issue a written order with findings on the evidentiary record de-
16 veloped in the proceeding.
17 “(4) An electric company must file with the commission for approval of a proposed rate change
18 to recover costs under the terms of an automatic adjustment clause or other method for timely re-
19 covery of costs established under subsection (3) of this section. Notwithstanding any other provision
20 of law, upon the request of any interested person the commission shall conduct a proceeding to de-
21 termine whether to approve a proposed change in rates under the automatic adjustment clause or
22 other method for timely recovery of costs. The commission shall provide parties to the proceeding
23 with the procedural rights described in ORS 756.500 to 756.610, including but not limited to the op-
24 portunity to develop an evidentiary record, conduct discovery, introduce evidence, conduct cross-
25 examination and submit written briefs and oral argument. The commission shall issue a written
26 order with findings on the evidentiary record developed in the proceeding. A filing made under this
27 subsection is subject to the commission′s authority under ORS 757.215 to suspend a rate, or schedule
28 of rates, for investigation.”.
29
HA to B-Eng. SB 838 Page 2