← Find this measure
2007 REGULAR SESSION · SB 838
House Amendments to A-Engrossed — SB 838 (2007R1)
This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.
Other indexed documents for this measure (12)
- Staff Measure Summary — SB 838 (2007R1)
- Staff Measure Summary — SB 838 (2007R1)
- Staff Measure Summary — SB 838 (2007R1)
- A-Engrossed — SB 838 (2007R1)
- B-Engrossed — SB 838 (2007R1)
- C-Engrossed — SB 838 (2007R1)
- Enrolled — SB 838 (2007R1)
- House Amendments to A-Engrossed — SB 838 (2007R1) · open
- House Amendments to B-Engrossed — SB 838 (2007R1)
- Introduced — SB 838 (2007R1)
- Senate Amendments — SB 838 (2007R1)
- OLIS measure summary
Recorded legislative activity (57)
- Introduction and First Reading Of Senate Measures
- Introduction and first reading. Referred to President's desk.
- Referred to Environment and Natural Resources.
- Heard
- Public Hearing held.
- Heard
- Public Hearing and Work Session held.
- Heard
- Public Hearing held.
- Heard and Reported Out with Amendments
- Work Session held.
- Recommendation: Do pass with amendments. (Printed A-Eng.)
- Second Reading Of Senate Measures
- Second reading.
- Third Reading Of Senate Measures
- Made a Special Order of Business by voice vote.
- Third reading. Carried by Atkinson, Avakian. Passed.
- Nelson declared potential conflict of interest.
- Vote explanation(s) filed by Verger.
- First Reading Of Senate Bills
- First reading. Referred to Speaker's desk.
- Referred to Energy and the Environment.
- Heard
- Public Hearing held.
- Heard
- Public Hearing held.
- Heard
- Public Hearing held.
- Not Heard
- Not Heard
- Not Heard
- Heard and Reported Out
- Work Session held.
- Not Heard
- Recommendation: Do pass with amendments and be printed B-Engrossed.
- Amendments distributed.
- Not Heard
- Second Reading Of Senate Bills
- Second reading.
- Third Reading Of Senate Bills
- Third reading.
- Motion to rerefer to Energy and the Environment carried. Rereferred.
- Heard and Reported Out
- Work Session held.
- Recommendation: Do pass with amendments and be printed C-Engrossed.
- Rules suspended. Made a Special Order of Business on May 23, 2007 Calendar.
- Special Orders Of Business
- Read. Carried by Dingfelder. Passed.
- Potential conflict(s) of interest declared by Jenson, Smith, G.
- Vote explanation(s) filed by Thatcher.
- Possible Consideration of House Amendments
- Senate concurred in House amendments and repassed bill.
- President signed.
- Speaker signed.
- Governor signed.
- Chapter 301, 2007 Laws.
- Effective date, June 6, 2007.
Citation and provenance
Oregon Legislature. House Amendments to A-Engrossed — SB 838 (2007R1). 2007 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2007R1/Downloads/MeasureDocument/SB838/House Amendments to A-Engrossed Retrieved 2026-09-02.
Document ID: doc_fd3fa9dc48199f3026c0
Original SHA-256: 75d8484b44226ee855aa0fda6a4aeb35e5f18725d4d733d040809433a36b498d
Extracted text SHA-256: 619a51069d3bfe94ea7071b5f86d44a0c17fca265be83318d136d92e3c501ecd
74th OREGON LEGISLATIVE ASSEMBLY--2007 Regular Session
HOUSE AMENDMENTS TO
A-ENGROSSED SENATE BILL 838
By COMMITTEE ON ENERGY AND THE ENVIRONMENT
May 9
1 On page 3 of the printed A-engrossed bill, line 34, after “(g)” insert “Landfill gas or”.
2 On page 4, line 9, after the period insert “A hydroelectric facility described in this subsection
3 is not subject to the requirements of subsection (4) of this section.”.
4 On page 6, line 24, delete the second “The”.
5 Delete lines 25 through 27.
6 On page 9, delete lines 24 through 38 and insert:
7 “(3) The Public Utility Commission shall establish an automatic adjustment clause as defined in
8 ORS 757.210 or another method that allows timely recovery of costs prudently incurred by an elec-
9 tric company to construct or otherwise acquire facilities that generate electricity from renewable
10 energy sources and for associated electricity transmission. Upon the request of any interested per-
11 son, the commission shall conduct a hearing and allow interested persons to appear, to conduct
12 discovery and to submit evidence and briefs on the terms of the automatic adjustment clause or
13 other method for timely recovery of costs.
14 “(4) An electric company must file with the commission for approval of a proposed rate change
15 to recover costs under the terms of an automatic adjustment clause or other method for timely re-
16 covery of costs established under subsection (3) of this section. Upon the request of any interested
17 person, the commission shall conduct a hearing and allow interested persons to appear, to conduct
18 discovery and to submit evidence and briefs on whether the commission should approve the proposed
19 rate change.
20 “ SECTION 13a. The Public Utility Commission shall establish the automatic adjustment
21 clause or another method for timely recovery of costs as required by section 13 (3) of this
22 2007 Act no later than January 1, 2008. The clause or method shall apply to all prudently
23 incurred costs described in section 13 (3) of this 2007 Act incurred by an electric company
24 since the date of the company′s last general rate case that was decided by the commission
25 before the effective date of this 2007 Act.”.
26 On page 14, line 11, after “rate” insert “under subsection (1) of this section or ORS 757.603
27 (2)(a)”.
28 In line 13, after “of” insert “subsection (1) of”.
29 In line 15, after “of” insert “subsection (1) of”.
30 In line 24, delete “less than” and after “megawatts” insert “or less”.
31 On page 16, line 27, after “may” insert “not”.
32 In line 28, delete “otherwise” and after “section” insert a period and delete the rest of the line
33 and delete lines 29 through 32.
34 On page 22, delete lines 36 through 41 and insert:
35 “ SECTION 35. A people′s utility district may become a member of an electric cooperative,
LC 3152-3/SB 838-A64
1 or of a limited liability company, for the purposes of planning, financing, constructing, ac-
2 quiring, operating, owning or maintaining property used for the generation and associated
3 transmission of electricity within or outside this state. A district may not become a stock-
4 holder in, or lend the credit of the district to, an electric cooperative or a limited liability
5 company. If a district becomes a member of an electric cooperative or of a limited liability
6 company, the district may not exercise the power of eminent domain for the benefit of the
7 electric cooperative or limited liability company.”.
8 On page 23, delete lines 17 through 20 and insert:
9 “(4) This section does not apply to a public contract executed in connection with:
10 “(a) The acquisition of renewable energy certificates;
11 “(b) The acquisition, construction, improvement or equipping of, or the financing of any interest
12 in, a renewable energy facility; or
13 “(c) The acquisition or financing of any interest in electrical capacity needed to shape, firm or
14 integrate electricity from a renewable energy facility.”.
15
HA to A-Eng. SB 838 Page 2