← Find this measure
2009 REGULAR SESSION · HB 2953
Introduced — HB 2953 (2009R1)
This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.
Other indexed documents for this measure (7)
Recorded legislative activity (27)
- First Reading Of House Bills
- First reading. Referred to Speaker's desk.
- Referred to Business and Labor.
- Heard
- Public Hearing held.
- Heard and Reported Out with Amendments
- Work Session held.
- Recommendation: Do pass with amendments and be printed A-Engrossed.
- Second Reading Of House Bills
- Second reading.
- Rules suspended. Carried over to May 6, 2009 Calendar.
- Third Reading Of House Bills
- Third reading. Carried by Kennemer. Passed.
- First Reading Of House Measures
- First reading. Referred to President's desk.
- Referred to Business and Transportation.
- Heard and Reported Out
- Public Hearing and Work Session held.
- Second Reading Of House Measures
- Recommendation: Do pass the A-Eng. bill.
- Second reading.
- Third Reading Of House Measures
- Third reading. Carried by Schrader. Passed.
- Speaker signed.
- President signed.
- Governor signed.
- Chapter 368, (2009 Laws): Effective date January 1, 2010.
Citation and provenance
Oregon Legislature. Introduced — HB 2953 (2009R1). 2009 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2009R1/Downloads/MeasureDocument/HB2953/Introduced Retrieved 2026-09-02.
Document ID: doc_875aba3c0ca70b4cd7be
Original SHA-256: 25cb46a890acef13fd2d0371dbacfa8e331f9abf9c840bfd5131a28fd617e18e
Extracted text SHA-256: f8746ce65b0e666909b0fa35eb1d5d1d7e3acdd79ce5b98212725e34a64ca5a2
75th OREGON LEGISLATIVE ASSEMBLY--2009 Regular Session
House Bill 2953
Sponsored by COMMITTEE ON BUSINESS AND LABOR
SUMMARY
The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
to consideration by the Legislative Assembly. It is an editor′s brief statement of the essential features of the
measure as introduced.
Provides that contracting agency may reject bid for public improvement contract if bidder does
not demonstrate that bidder is responsible. Provides that bidder must demonstrate responsibility by
showing that bidder has licenses that businesses and service professionals operating in this state
must have in order to undertake work specified in public improvement contract and that bidder is
covered by liability and other insurance in amounts required in solicitation documents for public
improvement contract.
1 A BILL FOR AN ACT
2 Relating to bidding requirements for public improvement contracts; creating new provisions; and
3 amending ORS 279C.365 and 279C.375.
4 Be It Enacted by the People of the State of Oregon:
5 SECTION 1. ORS 279C.365 is amended to read:
6 279C.365. (1) A contracting agency [preparing] that prepares solicitation documents for a public
7 improvement contract shall, at a minimum, include in the solicitation documents:
8 (a) A designation for or description of the public improvement project;
9 (b) The office where the specifications for the project may be reviewed;
10 (c) The date that prequalification applications must be filed under ORS 279C.430 and the class
11 or classes of work for which bidders must be prequalified if prequalification is a requirement;
12 (d) The date and time after which bids will not be received, which must be at least five days
13 after the date of the last publication of the advertisement, and may, in the sole discretion of the
14 contracting agency, direct or permit bidders to submit and the contracting agency to receive
15 bids [the submission and receipt of bids] by electronic means;
16 (e) The name and title of the person designated to receive [for receipt of] bids;
17 (f) The date[,] on which and the time and place [that] at which the contracting agency will
18 publicly open the bids;
19 (g) A statement that, if the contract is for a public works project subject to the state prevailing
20 rates of wage under ORS 279C.800 to 279C.870, the federal prevailing rates of wage under the
21 Davis-Bacon Act (40 U.S.C. 3141 et seq.) or both the state and federal prevailing rates of wage,
22 [no] the contracting agency will not receive or consider a bid [will be received or considered by
23 the contracting agency] unless the bid contains a statement by the bidder that the bidder will
24 comply with ORS 279C.838 or 279C.840 or 40 U.S.C. 3141 et seq. [will be complied with];
25 (h) A statement that each bid must identify whether the bidder is a resident bidder, as defined
26 in ORS 279A.120;
27 (i) A statement that the contracting agency may reject [any] a bid that does not comply with
28 [not in compliance with all] prescribed public contracting procedures and requirements, including
29 the requirement to demonstrate the bidder′s responsibility under ORS 279C.375 (3)(b), and
NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
New sections are in boldfaced type.
LC 1853
HB 2953
1 that the contracting agency may reject for good cause all bids [upon a] after finding [of the
2 agency] that [it] doing so is in the public interest [to do so];
3 (j) Information addressing whether a contractor or subcontractor must be licensed under ORS
4 468A.720; and
5 (k) A statement that [a] the contracting agency may not receive or consider a bid for a
6 public improvement contract [may not be received or considered by the contracting agency] unless the
7 bidder is licensed by the Construction Contractors Board or the State Landscape Contractors Board.
8 (2) A contracting agency may provide solicitation documents by electronic means.
9 (3) [All bids] A bid made to the contracting agency under ORS 279C.335 or 279C.400 must be:
10 (a) In writing;
11 (b) Filed with the person the contracting agency designates to receive bids; [designated for
12 receipt of bids by the contracting agency;] and
13 (c) Opened publicly by the contracting agency immediately after the deadline for [submission
14 of] submitting bids.
15 (4) After the contracting agency opens the bids, the contracting agency shall make the
16 bids [having been opened, the bids must be made] available for public inspection.
17 (5) A bidder shall submit or post a surety bond, irrevocable letter of credit issued by an in-
18 sured institution as defined in ORS 706.008, cashier′s check or certified check [of each bidder shall
19 be submitted with or posted] for all bids as bid security unless the contracting agency has ex-
20 empted the contract for which the bidder submits a bid [is submitted has been exempted] from this
21 requirement under ORS 279C.390. The security may not exceed 10 percent of the amount bid for the
22 contract.
23 (6) Subsection (5) of this section applies only to public improvement contracts with a value, es-
24 timated by the contracting agency, of more than $100,000 or, in the case of contracts for highways,
25 bridges and other transportation projects, more than $50,000.
26 SECTION 2. ORS 279C.375 is amended to read:
27 279C.375. (1) After a contracting agency has opened bids [are opened and a determination is
28 made that] and determined that the contracting agency will award a public improvement con-
29 tract [is to be awarded], the contracting agency shall award the contract to the lowest responsible
30 bidder.
31 (2) At least seven days before [the award of] awarding a public improvement contract, unless
32 the contracting agency determines that seven days is impractical under rules adopted under ORS
33 279A.065, the contracting agency shall issue to each bidder or post, electronically or otherwise, a
34 notice of the contracting agency′s intent to award a contract. This subsection does not apply to a
35 contract [excepted or exempted from] to which competitive bidding does not apply under ORS
36 279C.335 (1)(c) or (d). The notice and [its] the manner [of posting or issuance] in which the notice
37 is posted or issued must conform to rules adopted under ORS 279A.065.
38 (3) In determining the lowest responsible bidder, a contracting agency shall do all of the fol-
39 lowing:
40 (a) Check the list created by the Construction Contractors Board under ORS 701.227 for bidders
41 who are not qualified to hold a public improvement contract.
42 (b) Determine whether the bidder is responsible. A responsible bidder must demonstrate to
43 the contracting agency that the bidder: [has met the standards of responsibility. In making the
44 determination, the contracting agency shall consider whether a bidder has:]
45 (A) Has available the appropriate financial, material, equipment, facility and personnel re-
[2]
HB 2953
1 sources and expertise, or has the ability to obtain the resources and expertise, necessary to meet
2 all contractual responsibilities.
3 (B) Holds current licenses that businesses or service professionals operating in this state
4 must hold in order to undertake or perform the work specified in the contract.
5 (C) Is covered by liability insurance and other insurance in amounts the contracting
6 agency requires in the solicitation documents.
7 [(B)] (D) Has a satisfactory record of performance. The contracting agency shall document the
8 bidder′ s record of performance [of a bidder] if the contracting agency finds under this paragraph
9 that the bidder is not [to be] responsible [under this subparagraph].
10 [(C)] (E) Has a satisfactory record of integrity. The contracting agency shall document the
11 bidder′ s record of integrity [of a bidder] if the contracting agency finds under this paragraph that
12 the bidder is not [to be] responsible [under this subparagraph].
13 [(D)] (F) Is legally qualified [legally] to contract with the contracting agency.
14 [(E)] (G) Has supplied all necessary information in connection with the inquiry concerning re-
15 sponsibility. If a bidder fails to promptly supply information requested by the contracting agency
16 concerning responsibility, the contracting agency shall [base the determination of] determine the
17 bidder′ s responsibility [upon any] based on available information, or may find that the bidder is
18 not [to be] responsible.
19 (c) Document the contracting agency′s compliance with the requirements of paragraphs (a) and
20 (b) of this subsection in substantially the following form:
21 _______________________________________________________________________________________
22
23 RESPONSIBILITY DETERMINATION FORM
24
25 Project Name:
26 Bid Number:
27 Business Entity Name:
28 CCB License Number:
29 Form Submitted By (Contracting Agency):
30 Form Submitted By (Contracting Agency Representative′s Name):
31 Title:
32 Date:
33 (The contracting agency must submit this form with attachments, if any, to the Construction
34 Contractors Board within 30 days after the date of contract award.)
35 The contracting agency has (check all of the following):
36 [ ] Checked the list created by the
37 Construction Contractors Board
38 under ORS 701.227 for bidders who
39 are not qualified to hold a public
40 improvement contract.
41 [ ] Determined whether the bidder has
42 met the standards of responsibility.
43 In so doing, the contracting agency
44 has [considered whether]
45 found that the bidder
[3]
HB 2953
1 demonstrated that the bidder:
2 [ ] Has available the appropriate
3 financial, material, equipment,
4 facility and personnel resources
5 and expertise, or the ability to
6 obtain the resources and
7 expertise, necessary to meet
8 all contractual responsibilities.
9 [ ] Holds current licenses that
10 businesses or service professionals
11 operating in this state must hold
12 in order to undertake or perform
13 the work specified in the contract.
14 [ ] Is covered by liability insurance
15 and other insurance in amounts
16 required in the solicitation documents.
17 [ ] Has a satisfactory record of
18 performance.
19 [ ] Has a satisfactory record of
20 integrity.
21 [ ] Is legally qualified [legally] to contract
22 with the contracting agency.
23 [ ] Has supplied all necessary
24 information in connection with
25 the inquiry concerning
26 responsibility.
27 [ ] Determined the bidder to be
28 (check one of the following):
29 [ ] Responsible under ORS 279C.375
30 (3)(a) and (b).
31 [ ] Not responsible under
32 ORS 279C.375 (3)(a) and (b).
33 (Attach documentation if the contracting agency finds the bidder not to be responsible.)
34 _______________________________________________________________________________________
35
36 (d) Submit the form described in paragraph (c) of this subsection, with any attachments, to the
37 Construction Contractors Board within 30 days after the date the contracting agency awards the
38 contract.
39 (4) The successful bidder shall:
40 (a) Promptly execute a formal contract; and
41 (b) Execute and deliver to the contracting agency a performance bond and a payment bond when
42 required under ORS 279C.380.
43 (5) Based on competitive bids, a contracting agency may award a public improvement contract
44 or may award multiple public improvement contracts when specified in the invitation to bid.
45 (6) A contracting agency may not exclude a commercial contractor from competing for a public
[4]
HB 2953
1 contract on the basis that the license issued by the Construction Contractors Board is endorsed as
2 a level 1 or level 2 license. As used in this section, “commercial contractor” has the meaning given
3 that term in ORS 701.005.
4 SECTION 3. The amendments to ORS 279C.365 and 279C.375 by sections 1 and 2 of this
5 2009 Act apply to public improvement contracts first advertised or otherwise solicited on or
6 after the effective date of this 2009 Act.
7
[5]