← Find this measure
2009 REGULAR SESSION · HB 2953
Enrolled — HB 2953 (2009R1)
This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.
Other indexed documents for this measure (7)
Recorded legislative activity (27)
- First Reading Of House Bills
- First reading. Referred to Speaker's desk.
- Referred to Business and Labor.
- Heard
- Public Hearing held.
- Heard and Reported Out with Amendments
- Work Session held.
- Recommendation: Do pass with amendments and be printed A-Engrossed.
- Second Reading Of House Bills
- Second reading.
- Rules suspended. Carried over to May 6, 2009 Calendar.
- Third Reading Of House Bills
- Third reading. Carried by Kennemer. Passed.
- First Reading Of House Measures
- First reading. Referred to President's desk.
- Referred to Business and Transportation.
- Heard and Reported Out
- Public Hearing and Work Session held.
- Second Reading Of House Measures
- Recommendation: Do pass the A-Eng. bill.
- Second reading.
- Third Reading Of House Measures
- Third reading. Carried by Schrader. Passed.
- Speaker signed.
- President signed.
- Governor signed.
- Chapter 368, (2009 Laws): Effective date January 1, 2010.
Citation and provenance
Oregon Legislature. Enrolled — HB 2953 (2009R1). 2009 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2009R1/Downloads/MeasureDocument/HB2953/Enrolled Retrieved 2026-09-02.
Document ID: doc_93c234a61c7596b4deae
Original SHA-256: 9482a1cdc3cd2ae11fe6e66ba5c9faa78ac8ce28fee03ba7ddcbabdc782107c5
Extracted text SHA-256: e83dde66f329429bc65bd68eacbabcc70038cfc02d44e2a4e2b052a8d798c08c
75th OREGON LEGISLATIVE ASSEMBLY--2009 Regular Session
Enrolled
House Bill 2953
Sponsored by COMMITTEE ON BUSINESS AND LABOR
CHAPTER .................................................
AN ACT
Relating to bidding requirements for public improvement contracts; creating new provisions; and
amending ORS 279C.365 and 279C.375.
Be It Enacted by the People of the State of Oregon:
SECTION 1. ORS 279C.365 is amended to read:
279C.365. (1) A contracting agency [preparing] that prepares solicitation documents for a public
improvement contract shall, at a minimum, include in the solicitation documents:
(a) A designation for or description of the public improvement project;
(b) The office where the specifications for the project may be reviewed;
(c) The date that prequalification applications must be filed under ORS 279C.430 and the class
or classes of work for which bidders must be prequalified if prequalification is a requirement;
(d) The date and time after which bids will not be received, which must be at least five days
after the date of the last publication of the advertisement, and may, in the sole discretion of the
contracting agency, direct or permit bidders to submit and the contracting agency to receive
bids [the submission and receipt of bids] by electronic means;
(e) The name and title of the person designated to receive [for receipt of] bids;
(f) The date[,] on which and the time and place [that] at which the contracting agency will
publicly open the bids;
(g) A statement that, if the contract is for a public works project subject to the state prevailing
rates of wage under ORS 279C.800 to 279C.870, the federal prevailing rates of wage under the
Davis-Bacon Act (40 U.S.C. 3141 et seq.) or both the state and federal prevailing rates of wage,
[no] the contracting agency will not receive or consider a bid [will be received or considered by
the contracting agency] unless the bid contains a statement by the bidder that the bidder will
comply with ORS 279C.838 or 279C.840 or 40 U.S.C. 3141 et seq. [will be complied with];
(h) A statement that each bid must identify whether the bidder is a resident bidder, as defined
in ORS 279A.120;
(i) A statement that the contracting agency may reject [any] a bid that does not comply with
[not in compliance with all] prescribed public contracting procedures and requirements, including
the requirement to demonstrate the bidder′s responsibility under ORS 279C.375 (3)(b), and
that the contracting agency may reject for good cause all bids [upon a] after finding [of the
agency] that [it] doing so is in the public interest [to do so];
(j) Information addressing whether a contractor or subcontractor must be licensed under ORS
468A.720; and
Enrolled House Bill 2953 (HB 2953-A) Page 1
(k) A statement that [a] the contracting agency may not receive or consider a bid for a
public improvement contract [may not be received or considered by the contracting agency] unless the
bidder is licensed by the Construction Contractors Board or the State Landscape Contractors Board.
(2) A contracting agency may provide solicitation documents by electronic means.
(3) [All bids] A bid made to the contracting agency under ORS 279C.335 or 279C.400 must be:
(a) In writing;
(b) Filed with the person the contracting agency designates to receive bids; [designated for
receipt of bids by the contracting agency;] and
(c) Opened publicly by the contracting agency immediately after the deadline for [submission
of] submitting bids.
(4) After the contracting agency opens the bids, the contracting agency shall make the
bids [having been opened, the bids must be made] available for public inspection.
(5) A bidder shall submit or post a surety bond, irrevocable letter of credit issued by an in-
sured institution as defined in ORS 706.008, cashier′s check or certified check [of each bidder shall
be submitted with or posted] for all bids as bid security unless the contracting agency has ex-
empted the contract for which the bidder submits a bid [is submitted has been exempted] from this
requirement under ORS 279C.390. The security may not exceed 10 percent of the amount bid for the
contract.
(6) Subsection (5) of this section applies only to public improvement contracts with a value, es-
timated by the contracting agency, of more than $100,000 or, in the case of contracts for highways,
bridges and other transportation projects, more than $50,000.
SECTION 2. ORS 279C.375 is amended to read:
279C.375. (1) After a contracting agency has opened bids [are opened and a determination is
made that] and determined that the contracting agency will award a public improvement con-
tract [is to be awarded], the contracting agency shall award the contract to the lowest responsible
bidder.
(2) At least seven days before [the award of] awarding a public improvement contract, unless
the contracting agency determines that seven days is impractical under rules adopted under ORS
279A.065, the contracting agency shall issue to each bidder or post, electronically or otherwise, a
notice of the contracting agency′s intent to award a contract. This subsection does not apply to a
contract [excepted or exempted from] to which competitive bidding does not apply under ORS
279C.335 (1)(c) or (d). The notice and [its] the manner [of posting or issuance] in which the notice
is posted or issued must conform to rules adopted under ORS 279A.065.
(3) In determining the lowest responsible bidder, a contracting agency shall do all of the fol-
lowing:
(a) Check the list created by the Construction Contractors Board under ORS 701.227 for bidders
who are not qualified to hold a public improvement contract.
(b) Determine whether the bidder is responsible. A responsible bidder must demonstrate to
the contracting agency that the bidder: [has met the standards of responsibility. In making the
determination, the contracting agency shall consider whether a bidder has:]
(A) Has available the appropriate financial, material, equipment, facility and personnel re-
sources and expertise, or has the ability to obtain the resources and expertise, necessary to meet
all contractual responsibilities.
(B) Holds current licenses that businesses or service professionals operating in this state
must hold in order to undertake or perform the work specified in the contract.
(C) Is covered by liability insurance and other insurance in amounts the contracting
agency requires in the solicitation documents.
(D) Qualifies as a carrier-insured employer or a self-insured employer under ORS 656.407
or has elected coverage under ORS 656.128.
(E) Has made the disclosure required under ORS 279C.370.
Enrolled House Bill 2953 (HB 2953-A) Page 2
[(B)] (F) Has a satisfactory record of performance. The contracting agency shall document the
bidder′ s record of performance [of a bidder] if the contracting agency finds under this paragraph
that the bidder is not [to be] responsible [under this subparagraph].
[(C)] (G) Has a satisfactory record of integrity. The contracting agency shall document the
bidder′ s record of integrity [of a bidder] if the contracting agency finds under this paragraph that
the bidder is not [to be] responsible [under this subparagraph].
[(D)] (H) Is legally qualified [legally] to contract with the contracting agency.
[(E)] (I) Has supplied all necessary information in connection with the inquiry concerning re-
sponsibility. If a bidder fails to promptly supply information requested by the contracting agency
concerning responsibility, the contracting agency shall [base the determination of] determine the
bidder′ s responsibility [upon any] based on available information, or may find that the bidder is
not [to be] responsible.
(c) Document the contracting agency′s compliance with the requirements of paragraphs (a) and
(b) of this subsection in substantially the following form:
_______________________________________________________________________________________
RESPONSIBILITY DETERMINATION FORM
Project Name:
Bid Number:
Business Entity Name:
CCB License Number:
Form Submitted By (Contracting Agency):
Form Submitted By (Contracting Agency Representative′s Name):
Title:
Date:
(The contracting agency must submit this form with attachments, if any, to the Construction
Contractors Board within 30 days after the date of contract award.)
The contracting agency has (check all of the following):
[ ] Checked the list created by the
Construction Contractors Board
under ORS 701.227 for bidders who
are not qualified to hold a public
improvement contract.
[ ] Determined whether the bidder has
met the standards of responsibility.
In so doing, the contracting agency
has [considered whether]
found that the bidder
demonstrated that the bidder:
[ ] Has available the appropriate
financial, material, equipment,
facility and personnel resources
and expertise, or the ability to
obtain the resources and
expertise, necessary to meet
all contractual responsibilities.
[ ] Holds current licenses that
businesses or service professionals
operating in this state must hold
in order to undertake or perform
the work specified in the contract.
Enrolled House Bill 2953 (HB 2953-A) Page 3
[ ] Is covered by liability insurance
and other insurance in amounts
required in the solicitation documents.
[ ] Qualifies as a carrier-
insured employer or a self-insured
employer under ORS 656.407 or has
elected coverage under ORS 656.128.
[ ] Has disclosed the bidder′s first-
tier subcontractors in accordance
with ORS 279C.370.
[ ] Has a satisfactory record of
performance.
[ ] Has a satisfactory record of
integrity.
[ ] Is legally qualified [legally] to contract
with the contracting agency.
[ ] Has supplied all necessary
information in connection with
the inquiry concerning
responsibility.
[ ] Determined the bidder to be
(check one of the following):
[ ] Responsible under ORS 279C.375
(3)(a) and (b).
[ ] Not responsible under
ORS 279C.375 (3)(a) and (b).
(Attach documentation if the contracting agency finds the bidder not to be responsible.)
_______________________________________________________________________________________
(d) Submit the form described in paragraph (c) of this subsection, with any attachments, to the
Construction Contractors Board within 30 days after the date the contracting agency awards the
contract.
(4) The successful bidder shall:
(a) Promptly execute a formal contract; and
(b) Execute and deliver to the contracting agency a performance bond and a payment bond when
required under ORS 279C.380.
(5) Based on competitive bids, a contracting agency may award a public improvement contract
or may award multiple public improvement contracts when specified in the invitation to bid.
(6) A contracting agency may not exclude a commercial contractor from competing for a public
contract on the basis that the license issued by the Construction Contractors Board is endorsed as
a level 1 or level 2 license. As used in this section, “commercial contractor” has the meaning given
that term in ORS 701.005.
SECTION 3. The amendments to ORS 279C.365 and 279C.375 by sections 1 and 2 of this
2009 Act apply to public improvement contracts first advertised or otherwise solicited on or
after the effective date of this 2009 Act.
Enrolled House Bill 2953 (HB 2953-A) Page 4
Passed by House May 6, 2009 Received by Governor:
........................M.,........................................................., 2009
.............................................................................
Approved:
Chief Clerk of House
........................M.,........................................................., 2009
.............................................................................
Speaker of House
.............................................................................
Passed by Senate May 19, 2009 Governor
Filed in Office of Secretary of State:
.............................................................................
........................M.,........................................................., 2009
President of Senate
.............................................................................
Secretary of State
Enrolled House Bill 2953 (HB 2953-A) Page 5