Skip to content
← Find this measure

2009 REGULAR SESSION · HB 2953

A-Engrossed — HB 2953 (2009R1)

This is extracted document text. Strikeouts, bold additions, columns, and tables may not survive extraction. Check the original PDF when comparing amendments.

Other indexed documents for this measure (7)
Recorded legislative activity (27)
  1. First Reading Of House Bills
  2. First reading. Referred to Speaker's desk.
  3. Referred to Business and Labor.
  4. Heard
  5. Public Hearing held.
  6. Heard and Reported Out with Amendments
  7. Work Session held.
  8. Recommendation: Do pass with amendments and be printed A-Engrossed.
  9. Second Reading Of House Bills
  10. Second reading.
  11. Rules suspended. Carried over to May 6, 2009 Calendar.
  12. Third Reading Of House Bills
  13. Third reading. Carried by Kennemer. Passed.
  14. First Reading Of House Measures
  15. First reading. Referred to President's desk.
  16. Referred to Business and Transportation.
  17. Heard and Reported Out
  18. Public Hearing and Work Session held.
  19. Second Reading Of House Measures
  20. Recommendation: Do pass the A-Eng. bill.
  21. Second reading.
  22. Third Reading Of House Measures
  23. Third reading. Carried by Schrader. Passed.
  24. Speaker signed.
  25. President signed.
  26. Governor signed.
  27. Chapter 368, (2009 Laws): Effective date January 1, 2010.
Citation and provenance

Oregon Legislature. A-Engrossed — HB 2953 (2009R1). 2009 REGULAR SESSION. https://olis.oregonlegislature.gov/liz/2009R1/Downloads/MeasureDocument/HB2953/A-Engrossed Retrieved 2026-09-02.

Document ID: doc_a0bc493f1913e9728765

Original SHA-256: 46e32dbf051a8e2a0cdcf4f3154aa2bf145300cad7918a239d35775b6f723ed0

Extracted text SHA-256: 7e12d184ada1e383448d93a3a1003633c8ff6d9aadcf3b127b8e69d62de0567c

                                 75th OREGON LEGISLATIVE ASSEMBLY--2009 Regular Session



                                                       A-Engrossed
                                              House Bill 2953
                                                   Ordered by the House April 30
                                            Including House Amendments dated April 30

     Sponsored by COMMITTEE ON BUSINESS AND LABOR


                                                             SUMMARY
     The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
     to consideration by the Legislative Assembly. It is an editor′s brief statement of the essential features of the
     measure.

         Provides that contracting agency may reject bid for public improvement contract if bidder does
     not demonstrate that bidder is responsible. [Provides that bidder must demonstrate responsibility by
     showing that bidder has licenses that businesses and service professionals operating in this state must
     have in order to undertake work specified in public improvement contract and that bidder is covered
     by liability and other insurance in amounts required in solicitation documents for public improvement
     contract.] Specifies manner in which bidder must demonstrate responsibility.

 1                                                   A BILL FOR AN ACT
 2   Relating to bidding requirements for public improvement contracts; creating new provisions; and
 3        amending ORS 279C.365 and 279C.375.
 4   Be It Enacted by the People of the State of Oregon:
 5        SECTION 1. ORS 279C.365 is amended to read:
 6        279C.365. (1) A contracting agency [preparing] that prepares solicitation documents for a public
 7   improvement contract shall, at a minimum, include in the solicitation documents:
 8        (a) A designation for or description of the public improvement project;
 9        (b) The office where the specifications for the project may be reviewed;
10        (c) The date that prequalification applications must be filed under ORS 279C.430 and the class
11   or classes of work for which bidders must be prequalified if prequalification is a requirement;
12        (d) The date and time after which bids will not be received, which must be at least five days
13   after the date of the last publication of the advertisement, and may, in the sole discretion of the
14   contracting agency, direct or permit bidders to submit and the contracting agency to receive
15   bids [the submission and receipt of bids] by electronic means;
16        (e) The name and title of the person designated to receive [for receipt of] bids;
17        (f) The date[,] on which and the time and place [that] at which the contracting agency will
18   publicly open the bids;
19        (g) A statement that, if the contract is for a public works project subject to the state prevailing
20   rates of wage under ORS 279C.800 to 279C.870, the federal prevailing rates of wage under the
21   Davis-Bacon Act (40 U.S.C. 3141 et seq.) or both the state and federal prevailing rates of wage,
22   [no] the contracting agency will not receive or consider a bid [will be received or considered by
23   the contracting agency] unless the bid contains a statement by the bidder that the bidder will
24   comply with ORS 279C.838 or 279C.840 or 40 U.S.C. 3141 et seq. [will be complied with];
25        (h) A statement that each bid must identify whether the bidder is a resident bidder, as defined
26   in ORS 279A.120;


     NOTE: Matter in boldfaced type in an amended section is new; matter [italic and bracketed] is existing law to be omitted.
     New sections are in boldfaced type.

     LC 1853
                                           A-Eng. HB 2953


 1       (i) A statement that the contracting agency may reject [any] a bid that does not comply with
 2   [not in compliance with all] prescribed public contracting procedures and requirements, including
 3   the requirement to demonstrate the bidder′s responsibility under ORS 279C.375 (3)(b), and
 4   that the contracting agency may reject for good cause all bids [upon a] after finding [of the
 5   agency] that [it] doing so is in the public interest [to do so];
 6       (j) Information addressing whether a contractor or subcontractor must be licensed under ORS
 7   468A.720; and
 8       (k) A statement that [a] the contracting agency may not receive or consider a bid for a
 9   public improvement contract [may not be received or considered by the contracting agency] unless the
10   bidder is licensed by the Construction Contractors Board or the State Landscape Contractors Board.
11       (2) A contracting agency may provide solicitation documents by electronic means.
12       (3) [All bids] A bid made to the contracting agency under ORS 279C.335 or 279C.400 must be:
13       (a) In writing;
14       (b) Filed with the person the contracting agency designates to receive bids; [designated for
15   receipt of bids by the contracting agency;] and
16       (c) Opened publicly by the contracting agency immediately after the deadline for [submission
17   of] submitting bids.
18       (4) After the contracting agency opens the bids, the contracting agency shall make the
19   bids [having been opened, the bids must be made] available for public inspection.
20       (5) A bidder shall submit or post a surety bond, irrevocable letter of credit issued by an in-
21   sured institution as defined in ORS 706.008, cashier′s check or certified check [of each bidder shall
22   be submitted with or posted] for all bids as bid security unless the contracting agency has ex-
23   empted the contract for which the bidder submits a bid [is submitted has been exempted] from this
24   requirement under ORS 279C.390. The security may not exceed 10 percent of the amount bid for the
25   contract.
26       (6) Subsection (5) of this section applies only to public improvement contracts with a value, es-
27   timated by the contracting agency, of more than $100,000 or, in the case of contracts for highways,
28   bridges and other transportation projects, more than $50,000.
29       SECTION 2. ORS 279C.375 is amended to read:
30       279C.375. (1) After a contracting agency has opened bids [are opened and a determination is
31   made that] and determined that the contracting agency will award a public improvement con-
32   tract [is to be awarded], the contracting agency shall award the contract to the lowest responsible
33   bidder.
34       (2) At least seven days before [the award of] awarding a public improvement contract, unless
35   the contracting agency determines that seven days is impractical under rules adopted under ORS
36   279A.065, the contracting agency shall issue to each bidder or post, electronically or otherwise, a
37   notice of the contracting agency′s intent to award a contract. This subsection does not apply to a
38   contract [excepted or exempted from] to which competitive bidding does not apply under ORS
39   279C.335 (1)(c) or (d). The notice and [its] the manner [of posting or issuance] in which the notice
40   is posted or issued must conform to rules adopted under ORS 279A.065.
41       (3) In determining the lowest responsible bidder, a contracting agency shall do all of the fol-
42   lowing:
43       (a) Check the list created by the Construction Contractors Board under ORS 701.227 for bidders
44   who are not qualified to hold a public improvement contract.
45       (b) Determine whether the bidder is responsible. A responsible bidder must demonstrate to


                                                  [2]
                                           A-Eng. HB 2953


 1   the contracting agency that the bidder: [has met the standards of responsibility. In making the
 2   determination, the contracting agency shall consider whether a bidder has:]
 3       (A) Has available the appropriate financial, material, equipment, facility and personnel re-
 4   sources and expertise, or has the ability to obtain the resources and expertise, necessary to meet
 5   all contractual responsibilities.
 6       (B) Holds current licenses that businesses or service professionals operating in this state
 7   must hold in order to undertake or perform the work specified in the contract.
 8       (C) Is covered by liability insurance and other insurance in amounts the contracting
 9   agency requires in the solicitation documents.
10       (D) Qualifies as a carrier-insured employer or a self-insured employer under ORS 656.407
11   or has elected coverage under ORS 656.128.
12       (E) Has made the disclosure required under ORS 279C.370.
13       [(B)] (F) Has a satisfactory record of performance. The contracting agency shall document the
14   bidder′ s record of performance [of a bidder] if the contracting agency finds under this paragraph
15   that the bidder is not [to be] responsible [under this subparagraph].
16       [(C)] (G) Has a satisfactory record of integrity. The contracting agency shall document the
17   bidder′ s record of integrity [of a bidder] if the contracting agency finds under this paragraph that
18   the bidder is not [to be] responsible [under this subparagraph].
19       [(D)] (H) Is legally qualified [legally] to contract with the contracting agency.
20       [(E)] (I) Has supplied all necessary information in connection with the inquiry concerning re-
21   sponsibility. If a bidder fails to promptly supply information requested by the contracting agency
22   concerning responsibility, the contracting agency shall [base the determination of] determine the
23   bidder′ s responsibility [upon any] based on available information, or may find that the bidder is
24   not [to be] responsible.
25       (c) Document the contracting agency′s compliance with the requirements of paragraphs (a) and
26   (b) of this subsection in substantially the following form:
27   _______________________________________________________________________________________
28
29                               RESPONSIBILITY DETERMINATION FORM
30
31   Project Name:
32   Bid Number:
33   Business Entity Name:
34   CCB License Number:
35   Form Submitted By (Contracting Agency):
36   Form Submitted By (Contracting Agency Representative′s Name):
37         Title:
38         Date:
39         (The contracting agency must submit this form with attachments, if any, to the Construction
40   Contractors Board within 30 days after the date of contract award.)
41         The contracting agency has (check all of the following):
42       [ ] Checked the list created by the
43           Construction Contractors Board
44           under ORS 701.227 for bidders who
45           are not qualified to hold a public


                                                  [3]
                                         A-Eng. HB 2953


 1       improvement contract.
 2   [ ] Determined whether the bidder has
 3       met the standards of responsibility.
 4       In so doing, the contracting agency
 5       has [considered whether]
 6       found that the bidder
 7       demonstrated that the bidder:
 8       [ ] Has available the appropriate
 9           financial, material, equipment,
10           facility and personnel resources
11           and expertise, or the ability to
12           obtain the resources and
13           expertise, necessary to meet
14           all contractual responsibilities.
15       [ ] Holds current licenses that
16       businesses or service professionals
17       operating in this state must hold
18       in order to undertake or perform
19       the work specified in the contract.
20       [ ] Is covered by liability insurance
21       and other insurance in amounts
22       required in the solicitation documents.
23       [ ] Qualifies as a carrier-
24       insured employer or a self-insured
25       employer under ORS 656.407 or has
26       elected coverage under ORS 656.128.
27       [ ] Has disclosed the bidder′s first-
28       tier subcontractors in accordance
29       with ORS 279C.370.
30       [ ] Has a satisfactory record of
31           performance.
32       [ ] Has a satisfactory record of
33           integrity.
34       [ ] Is legally qualified [legally] to contract
35           with the contracting agency.
36       [ ] Has supplied all necessary
37           information in connection with
38           the inquiry concerning
39           responsibility.
40   [ ] Determined the bidder to be
41       (check one of the following):
42       [ ] Responsible under ORS 279C.375
43           (3)(a) and (b).
44       [ ] Not responsible under
45           ORS 279C.375 (3)(a) and (b).


                                                 [4]
                                            A-Eng. HB 2953


 1       (Attach documentation if the contracting agency finds the bidder not to be responsible.)
 2   _______________________________________________________________________________________
 3
 4       (d) Submit the form described in paragraph (c) of this subsection, with any attachments, to the
 5   Construction Contractors Board within 30 days after the date the contracting agency awards the
 6   contract.
 7       (4) The successful bidder shall:
 8       (a) Promptly execute a formal contract; and
 9       (b) Execute and deliver to the contracting agency a performance bond and a payment bond when
10   required under ORS 279C.380.
11       (5) Based on competitive bids, a contracting agency may award a public improvement contract
12   or may award multiple public improvement contracts when specified in the invitation to bid.
13       (6) A contracting agency may not exclude a commercial contractor from competing for a public
14   contract on the basis that the license issued by the Construction Contractors Board is endorsed as
15   a level 1 or level 2 license. As used in this section, “commercial contractor” has the meaning given
16   that term in ORS 701.005.
17       SECTION 3. The amendments to ORS 279C.365 and 279C.375 by sections 1 and 2 of this
18   2009 Act apply to public improvement contracts first advertised or otherwise solicited on or
19   after the effective date of this 2009 Act.
20




                                                  [5]